The Offshore Installations (Safety Zones) (No.2) Order 2008
Made: 11th August 2008
Coming into force: 1st September 2008
The Secretary of State makes this Order — in exercise of the powers conferred on him by sections 22(1) and (2) of the Petroleum Act 1987[^f00001] (“the Act”); and for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A) of the Act.
in exercise of the powers conferred on him by sections 22(1) and (2) of the Petroleum Act 1987[^f00001] (“the Act”); and
for the purpose of giving effect to proposals submitted to him by the Health and Safety Executive under section 24(2A) of the Act.
Citation and commencement
1
This Order may be cited as the Offshore Installations (Safety Zones) (No.2) Order 2008 and shall come into force on 1st September 2008.
Establishment of safety zones
2
A safety zone is established around each installation specified in column 1 of the Schedule (being an installation stationed in waters to which subsection (7) of section 21 of the Petroleum Act 1987 applies) having a radius of five hundred metres from the point as respects that installation which has the co-ordinates of latitude and longitude according to European Datum (1950) specified in columns 2 and 3 of the Schedule.
SCHEDULE — SAFETY ZONES
| (1)Name or other designation of the offshore installation | (2)Latitude North | (3)Longitude |
|---|---|---|
| . . . | . . . | . . . |
| Galley Riser Base Structure, Block 15/23a, Galley Field | 58° 17.55’ | 00° 26.17’ E |
| Grouse Sub-Sea Wells, Block 21/19, Grouse Field | 57° 28.19’ | 00° 37.14’ E |
| Don Fields Single Anchor Loading Base, Block 211/18, Don Field | 61° 26.6’ | 01° 29.18’ E |
| West Don Well Centre, Block 211/18, Don Field | 61° 29.66’ | 01° 25.74’ E |
| Don Southwest Production Well Centre, Block 211/18, Don Field | 61° 28.07’ | 01° 32.09’ E |
| Don Southwest Injection Well Centre, Block 211/18, Don Field | 61° 28.08’ | 01° 33.44’ E |
| . . . | . . . | . . . |
Signed
Signed by the authority of the Secretary of State for Work and Pensions.
William D McKenzie — Parliamentary Under Secretary of State — Department for Work and Pensions — 11th August 2008
Explanatory note
(This note is not part of the Order)
EXPLANATORY NOTE
This Order establishes, under section 22 of the Petroleum Act 1987, safety zones having a radius of 500 metres from the point around each installation specified in the Schedule and stationed in waters to which section 21(7) of the Act applies (these include territorial waters and waters in areas designated under section 1(7) of the Continental Shelf Act 1964 (c.29)) (article 2).
Vessels, which for this purpose include hovercraft, submersible apparatus and installations in transit, are prohibited from entering or remaining in a safety zone except with the consent of the Health and Safety Executive or in accordance with regulations made under section 23(1) of the Act (currently the Offshore Installations (Safety Zones) Regulations (S.I. 1987/1331)).
Footnotes
[^f00001]: 1987 c.12; section 24(2A) was inserted by S.I. 1993/1823.
Editorial notes
[^key-9ec2f95f7e78d10d537d09596f7f4a4d]: Art. 1 in force at 1.9.2008, see art. 1
[^key-c733fe0169d9a552353a04c98b5952eb]: Art. 2 in force at 1.9.2008, see art. 1
[^key-dea836f7bf7858ade75d8006270b1719]: Sch. in force at 1.9.2008, see art. 1
[^key-f53592eefa1cee2f479e4a19acce4551]: Words in Sch. omitted (30.9.2015) by virtue of The Offshore Installations (Safety Zones) (No. 3) Order 2015 (S.I. 2015/1673), arts. 1(2), 6
[^key-29fe1919f9b9c43e061609e581a64d41]: Words in Sch. omitted (29.12.2025) by virtue of The Offshore Installations (Safety Zones) (No. 2) Order 2025 (S.I. 2025/1291), arts. 1(2), 5(2)
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.