Regulation (EU) 2021/1060 of the European Parliament and of the Council of 24 June 2021 laying down common provisions on the European Regional Development Fund, the European Social Fund Plus, the Cohesion Fund, the Just Transition Fund and the European Maritime, Fisheries and Aquaculture Fund and financial rules for those and for the Asylum, Migration and Integration Fund, the Internal Security Fund and the Instrument for Financial Support for Border Management and Visa Policy
Article 67
Specific eligibility rules for grants
Contributions in kind in the form of provision of works, goods, services, land and real estate for which no payment supported by invoices, or documents of equivalent probative value, has been made, may be eligible where the following conditions are fulfilled:
(a) the public support paid to the operation which includes contributions in kind does not exceed the total eligible expenditure, excluding contributions in kind, at the end of the operation;
(b) the value attributed to contributions in kind does not exceed the costs generally accepted on the market in question;
(c) the value and the delivery of the contribution in kind can be independently assessed and verified;
(d) in the case of provision of land or real estate, a payment, for the purposes of a lease agreement of a nominal amount per annum not exceeding a single unit of the currency of the Member State, may be made;
(e) in the case of contributions in kind in the form of unpaid work, the value of that work is determined by taking into account the verified time spent and the rate of remuneration for equivalent work.
The value of the land or real estate referred to in point (d) of the first subparagraph of this paragraph shall be certified by an independent qualified expert or duly authorised official body and shall not exceed the limit laid down in point (b) of Article 64(1).
Depreciation costs for which no payment supported by invoices has been made may be considered to be eligible where the following conditions are fulfilled:
(a) the eligibility rules of the programme allow for it;
(b) the amount of the expenditure is duly justified by supporting documents having equivalent probative value to invoices for eligible costs where those costs were reimbursed in the form referred to in point (a) of Article 53(1);
(c) the costs relate exclusively to the period of support for the operation;
(d) public grants have not contributed towards the acquisition of the depreciated assets.
Article 68
Specific eligibility rules for financial instruments
Eligible expenditure of a financial instrument shall be the total amount of programme contribution paid to, or, in the case of guarantees, set aside for guarantee contracts, by the financial instrument within the eligibility period, where that amount corresponds to:
(a) payments to final recipients, in the case of loans, equity and quasi-equity investments;
(b) resources set aside for guarantee contracts, whether outstanding or having already come to maturity, in order to honour possible guarantee calls for losses, calculated based on a multiplier ratio established for the respective underlying disbursed new loans, equity or quasi-equity investments in final recipients;
(c) payments to, or for the benefit of, final recipients where financial instruments are combined with other Union contribution in a single financial instrument operation in accordance with Article 58(5);
(d) payments of management fees and reimbursements of management costs incurred by the bodies implementing the financial instrument.
Where bodies implementing a holding fund are selected through a direct award of contract pursuant to Article 59(3), the amount of management costs and fees paid to those bodies that can be declared as eligible expenditure shall be subject to a threshold of up to 5 % of the total amount of programme contributions disbursed to final recipients in loans or set aside for guarantee contracts and up to 7 % of the total amount of programme contributions disbursed to final recipients in equity and quasi-equity investments.
Where bodies implementing a specific fund are selected through a direct award of contract pursuant to Article 59(3), the amount of management costs and fees paid to those bodies that can be declared as eligible expenditure shall be subject to a threshold of up to 7 % of the total amount of programme contributions disbursed to final recipients in loans or set aside for in guarantee contracts and up to 15 % of the total amount of programme contributions disbursed to final recipients in equity or quasi-equity investments.
Where bodies implementing a holding fund or specific funds, or both, are selected through a competitive tender in accordance with the applicable law, the amount of management costs and fees shall be established in the funding agreement and shall reflect the result of the competitive tender.
TITLE VI
MANAGEMENT AND CONTROL
CHAPTER I
General rules on management and control
Article 69
Responsibilities of Member States
For programmes supported by the AMIF, the ISF and the BMVI, the obligations concerning the collection of information on the beneficial owners of the recipients of Union funding in accordance with Annex XVII as set out in the first subparagraph shall apply as from 1 January 2023.
For the purposes of this Article, complaints cover any dispute between potential and selected beneficiaries with regard to the proposed or selected operation and any disputes with third parties on the implementation of the programme or operations thereunder, irrespective of the qualification of means of legal redress established under national law.
Member States shall promote the benefits of electronic data exchange and provide all necessary support to beneficiaries in this respect.
By way of derogation from the first subparagraph, the managing authority may exceptionally accept, upon the explicit request of a beneficiary, the exchanges of information in paper format, without prejudice to its obligation to record and store data in accordance with point (e) of Article 72(1).
For programmes supported by the EMFAF, the AMIF, the ISF and the BMVI, the first subparagraph shall apply as from 1 January 2023.
The first subparagraph shall not apply to programmes or priorities under point (m) of Article 4(1) of the ESF+ Regulation.
Article 70
Commission powers and responsibilities
The Commission and the audit authorities shall coordinate their audit plans.
For on-the-spot audits, the following shall also apply:
(a) the Commission shall give at least 15 working days’ notice for the audit to the competent programme authority, except in urgent cases; officials or authorised representatives of the Member State may take part in such audits;
(b) where the application of national provisions reserves certain acts for agents specifically designated by national legislation, Commission officials and authorised representatives shall have access to the information thus obtained without prejudice to the competences of national courts and in full respect of the fundamental rights of the legal subjects concerned;
(c) the Commission shall transmit the preliminary audit findings to the competent Member State authority no later than 3 months after the last day of the audit;
(d) the Commission shall transmit the audit report no later than 3 months from the date of receiving a complete reply from the competent Member State authority to the preliminary audit findings; the Member State’s reply shall be considered complete in the absence of a request from the Commission to provide further information or a revised document within 2 months from the date of receipt of the Member State’s response.
For the purpose of complying with the time limits set out in points (c) and (d) of the first subparagraph of this paragraph, the Commission shall make available the preliminary audit findings and the audit report in at least one of the official languages of the institutions of the Union.
The time limits referred to in points (c) and (d) of the first subparagraph of this paragraph may be extended where it is deemed necessary and agreed upon between the Commission and the competent Member State authority.
Where a time limit is set for a reply by the Member State to the preliminary audit findings or the audit report referred to in points (c) and (d) of the first subparagraph of this paragraph, that time limit shall start upon their receipt by the competent Member State authority in at least one of the official languages of the Member State concerned.
Article 71
Programme authorities
CHAPTER II
Standard management and control systems
Article 72
Functions of the managing authority
The managing authority shall be responsible for managing the programme with a view to delivering the objectives of the programme. In particular, it shall have the following functions:
(a) select operations in accordance with Article 73, with the exception of operations referred to in point (d) of Article 33(3);
(b) carry out programme management tasks in accordance with Article 74;
(c) support the work of the monitoring committee in accordance with Article 75;
(d) supervise intermediate bodies;
(e) record and store electronically the data on each operation necessary for monitoring, evaluation, financial management, verifications and audits in accordance with Annex XVII, and ensure the security, integrity and confidentiality of data and the authentication of users.
Article 73
Selection of operations by the managing authority
The criteria and procedures shall ensure that the operations to be selected are prioritised with a view to maximising the contribution of Union funding towards the achievement of the objectives of the programme.
In selecting operations, the managing authority shall:
(a) ensure that selected operations comply with the programme, including their consistency with the relevant strategies underlying the programme, as well as provide an effective contribution to the achievement of the specific objectives of the programme;
(b) ensure that selected operations which fall within the scope of an enabling condition are consistent with the corresponding strategies and planning documents established for the fulfilment of that enabling condition;
(c) ensure that selected operations present the best relationship between the amount of support, the activities undertaken and the achievement of objectives;
(d) verify that the beneficiary has the necessary financial resources and mechanisms to cover operation and maintenance costs for operations comprising investment in infrastructure or productive investment, so as to ensure their financial sustainability;
(e) ensure that selected operations which fall under the scope of Directive 2011/92/EU of the European Parliament and of the Council (22) are subject to an environmental impact assessment or a screening procedure and that the assessment of alternative solutions has been taken in due account, on the basis of the requirements of that Directive;
(f) verify that where the operations have started before the submission of an application for funding to the managing authority, applicable law has been complied with;
(g) ensure that selected operations fall within the scope of the Fund concerned and are attributed to a type of intervention;
(h) ensure that operations do not include activities which were part of an operation subject to relocation in accordance with Article 66 or which would constitute a transfer of a productive activity in accordance with point (a) of Article 65(1);
(i) ensure that selected operations are not directly affected by a reasoned opinion by the Commission in respect of an infringement under Article 258 TFEU that puts at risk the legality and regularity of expenditure or the performance of operations;
(j) ensure the climate proofing of investments in infrastructure which have an expected lifespan of at least 5 years.
As regards point (b) of this paragraph, in the case of policy objective one, as set out in point (a) of Article 3(1) of the ERDF and CF Regulation, only operations corresponding to the specific objectives referred to in subpoints (i) and (iv) of that point shall be consistent with the corresponding smart specialisation strategies.
In addition, managing authorities may apply to the operations referred to in the first subparagraph the categories, maximum amounts and methods of calculation of eligible costs established under the relevant Union instrument. These elements shall be set out in the document referred in paragraph 3.
Article 74
Programme management by the managing authority
The managing authority shall:
(a) carry out management verifications to verify that the co-financed products and services have been delivered, that the operation complies with applicable law, the programme and the conditions for support of the operation, and: (i) where costs are to be reimbursed pursuant to point (a) of Article 53(1), that the amount of expenditure claimed by the beneficiaries in relation to these costs has been paid and that beneficiaries maintain separate accounting records or use appropriate accounting codes for all transactions relating to the operation; (ii) where costs are to be reimbursed pursuant to points (b), (c) and (d) of Article 53(1), that the conditions for reimbursement of expenditure to the beneficiary have been met;
(b) ensure, subject to the availability of funding, that a beneficiary receives the amount due in full and no later than 80 days from the date of submission of the payment claim by the beneficiary; the deadline may be interrupted if information submitted by the beneficiary does not allow the managing authority to establish whether the amount is due;
(c) have effective and proportionate anti-fraud measures and procedures in place, taking into account the risks identified;
(d) prevent, detect and correct irregularities;
(e) confirm that the expenditure entered into the accounts is legal and regular;
(f) draw up the management declaration in accordance with the template set out in Annex XVIII.
For point (b) of the first subparagraph, no amount shall be deducted or withheld and no specific charge or other charge with equivalent effect shall be levied that would reduce amounts due to beneficiaries.
For PPP operations, the managing authority shall make payments to an escrow account set up for that purpose in the name of the beneficiary for use in accordance with the PPP agreement.
Management verifications shall include administrative verifications in respect of payment claims made by beneficiaries and on-the-spot verifications of operations. Those verifications shall be carried out before submission of the accounts in accordance with Article 98.
Without prejudice to paragraph 2, the Interreg Regulation may establish specific rules on management verifications applicable to Interreg programmes. The AMIF, the ISF and the BMVI Regulations may establish specific rules on management verifications that are applicable where an international organisation is a beneficiary.
Article 75
Support of the work of the monitoring committee by the managing authority
The managing authority shall:
(a) provide the monitoring committee in a timely manner with all information necessary to carry out its tasks;
(b) ensure the follow-up of the decisions and recommendations of the monitoring committee.
Article 76
The accounting function
The accounting function shall consist of the following tasks:
(a) drawing up and submitting payment applications to the Commission in accordance with Articles 91 and 92;
(b) drawing up and submitting the accounts confirming completeness, accuracy and veracity of the accounts in accordance with Article 98, and keeping electronic records of all the elements of the accounts, including payment applications;
(c) converting the amounts of expenditure incurred in another currency into euro by using the monthly accounting exchange rate of the Commission in the month during which the expenditure is registered in the accounting systems of the body responsible for carrying out the tasks set out in this Article.
Article 77
Functions of the audit authority
The audit authority shall draw up and submit to the Commission:
(a) an annual audit opinion in accordance with Article 63(7) of the Financial Regulation and with the template set out in Annex XIX to this Regulation and, based on all audit work carried out, cover the following distinct components: (i) the completeness, accuracy and veracity of the accounts; (ii) the legality and regularity of the expenditure included in the accounts submitted to the Commission; (iii) the effective functioning of the management and control system;
(b) an annual control report fulfilling the requirements of point (b) of Article 63(5) of the Financial Regulation, in accordance with the template set out in Annex XX to this Regulation, which supports the annual audit opinion referred to in point (a) of this paragraph and sets out a summary of findings, including an analysis of the nature and extent of errors and deficiencies in the systems as well as the proposed and implemented corrective actions and the resulting total error rate and residual error rate for the expenditure entered in the accounts submitted to the Commission.
Article 78
Audit strategy
Article 79
Audits of operations
The statistical sample may cover one or more programmes receiving support from the ERDF, the ESF+, the Cohesion Fund and the JTF and, subject to stratification where appropriate, one or more programming periods according to the professional judgement of the audit authority.
The sample of operations supported by the EMFAF, the AMIF, the ISF and the BMVI shall cover operations supported by each Fund separately.
The ESF+ Regulation may set out specific provisions for programmes or priorities under point (m) of Article 4(1) of that Regulation. The AMIF, the ISF and the BMVI Regulations may establish specific provisions for audit of operations where an international organisation is a beneficiary. The Interreg Regulation may establish specific rules on audits of operations applicable to Interreg programmes.
Audits shall be conducted on the basis of the rules in force at the time when the activities within the operation were carried out.
Article 80
Single audit arrangements
The Commission and audit authorities shall first use all the information and records referred to in point (e) of Article 72(1), including results of management verifications, and only request and obtain additional documents and audit evidence from the beneficiaries concerned where, based on their professional judgement, this is required to support robust audit conclusions.
Other operations shall not be subject to more than one audit per accounting year by either the audit authority or the Commission prior to the submission of the accounts for the accounting year in which the operation is completed. Operations shall not be subject to an audit by the Commission or the audit authority in any year where there has already been an audit in that year by the Court of Auditors, provided that the results of that Court of Auditors’ audit for such operations can be used by the audit authority or the Commission for the purpose of fulfilling their respective tasks.
Paragraphs 2 and 3 shall not apply where:
(a) there is a specific risk of irregularity or a suspicion of fraud;
(b) there is a need to re-perform the work of the audit authority for obtaining assurance as to its effective functioning;
(c) there is evidence of a serious deficiency in the work of the audit authority.
Article 81
Management verifications and audits of financial instruments
However, the EIB or other international financial institutions in which a Member State is a shareholder shall provide control reports supporting the payment claims to the managing authority.
In the context of guarantee funds, the bodies responsible for the audit of programmes may conduct audits of the bodies providing new underlying loans only when one or more of the following situations occur:
(a) supporting documents, providing evidence of the support from the financial instrument to final recipients, are not available at the level of the managing authority or at the level of the bodies implementing the financial instrument;
(b) there is evidence that the documents available at the level of the managing authority or at the level of the bodies implementing the financial instrument do not represent a true and accurate record of the support provided.
However, the EIB or other international financial institutions in which a Member State is a shareholder shall provide to the Commission and to the audit authority an annual audit report drawn up by their external auditors by the end of each calendar year. This report shall cover the elements included in Annex XXI, and constitute the basis for the audit authority’s work.
Article 82
Availability of documents
CHAPTER III
Reliance on national management systems
Article 83
Enhanced proportionate arrangements
The Member State may apply the following enhanced proportionate arrangements for the management and control system of a programme where the conditions set out in Article 84 are fulfilled:
(a) by way of derogation from point (a) of Article 74(1) and Article 74(2), the managing authority may apply only national procedures to carry out management verifications;
(b) by way of derogation from Article 77(1) regarding system audits and Article 79(1) and (3) regarding audits of operations, the audit authority may limit its audit activity to audits of operations covering a sample based on a statistical selection of 30 sampling units for the programme or group of programmes concerned;
For the purposes of management verifications referred to in point (a) of the first subparagraph, the managing authority may rely on verifications carried out by external bodies provided that it has sufficient evidence of the competence of those bodies.
For point (b) of the first subparagraph, where the population consists of less than 300 sampling units, the audit authority may apply a non-statistical sampling method in accordance with Article 79(2).
The Commission shall limit its own audits to a review of the work of the audit authority through re-performance at its level only, unless available information suggests a serious deficiency in the work of the audit authority.
Article 84
Conditions for application of enhanced proportionate arrangements
Where a Member State decides to apply the enhanced proportionate arrangements referred to in Article 83, it shall notify the Commission on the application of such arrangements. In such a case the arrangements shall apply from the start of the subsequent accounting year.
Article 85
Adjustment during the programming period
TITLE VII
FINANCIAL MANAGEMENT, SUBMISSION AND EXAMINATION OF ACCOUNTS AND FINANCIAL CORRECTIONS
CHAPTER I
Financial management
Article 86
Budgetary commitments
That decision shall specify the total Union contribution per Fund and per year. However, for programmes under the Investment for jobs and growth goal, an amount corresponding to 50 % of the contribution for the years 2026 and 2027 (‘flexibility amount’) per programme in each Member State shall be retained and shall only be definitively allocated to the programme after the adoption of the Commission decision following the mid-term review in accordance with Article 18.
Article 87
Use of the euro
Any amounts set out in programmes, reported or declared to the Commission by Member States shall be denominated in euro.
Article 88
Repayment
Article 89
Types of payments
Payments shall take the form of pre-financing, interim payments and payments of the balance of the accounts for the accounting year.
Article 90
Pre-financing
The pre-financing for each Fund shall be paid in yearly instalments before 1 July of each year, subject to availability of funds, as follows:
(a) 2021: 0,5 %;
(b) 2022: 0,5 %;
(c) 2023: 0,5 %;
(d) 2024: 0,5 %;
(e) 2025: 0,5 %;
(f) 2026: 0,5 %.
Where a programme is adopted after 1 July 2021, the earlier instalments shall be paid in the year of adoption.
An additional 0,5 % pre-financing shall be paid in 2022 immediately following the entry into force of this Regulation and an additional 0,5 % pre-financing shall be paid in 2023 for programmes supported by the ERDF, ESF+ or the Cohesion Fund under the Investment for jobs and growth goal. Where a programme is adopted after 31 December 2022, the 2022 instalment shall be paid in the year of adoption.
For programmes supported by the AMIF, the ISF and the BMVI, the amount paid as pre-financing shall be cleared from the Commission accounts no later than with the final accounting year.
Article 91
Payment applications
The last payment application submitted by 31 July shall be deemed to be the final payment application for the accounting year that has ended 30 June.
The first subparagraph shall not apply to Interreg programmes.
Payment applications shall be submitted to the Commission in accordance with the template set out in Annex XXIII and include, for each priority and, where applicable, by category of region:
(a) the total amount of eligible expenditure incurred by beneficiaries and paid in implementing operations linked to specific objectives for which enabling conditions are fulfilled and operations linked to specific objectives for which enabling conditions are not fulfilled but contribute to the fulfilment of enabling conditions, as entered in the system of the body carrying out the accounting function;
(b) the amount for technical assistance calculated in accordance with point (b) of Article 36(5), where applicable;
(c) the total amount of public contribution made or to be made linked to specific objectives for which enabling conditions are fulfilled and operations linked to specific objectives for which enabling conditions are not fulfilled but contribute to the fulfilment of enabling conditions, as entered in the system of the body carrying out the accounting function;
(d) the total amount of eligible expenditure incurred by beneficiaries and paid in implementing operations linked to specific objectives for which enabling conditions are not fulfilled, with the exception of operations that contribute to the fulfilment of enabling conditions, as entered in the system of the body carrying out the accounting function.
By way of derogation from point (a) of paragraph 3, the following shall apply:
(a) where the Union contribution is made pursuant to point (a) of Article 51, the amounts included in a payment application are the amounts justified by the progress in the fulfilment of conditions, or achievement of results, in accordance with the decision referred to in Article 95(2) or the delegated act referred to in Article 95(4);
(b) where the Union contribution is made pursuant to points (c), (d) and (e) of Article 51, the amounts included in a payment application are the amounts determined in accordance with the decision referred to in Article 94(3) or the delegated act referred to in Article 94(4);
(c) for the forms of grants listed in points (b), (c) and (d) of the first subparagraph of Article 53(1), the amounts included in a payment application are the costs calculated on the applicable basis.
By way of derogation from paragraph 3, in the case of State aid, the payment application may include advances paid to the beneficiary by the body granting the aid under the following cumulative conditions:
(a) those advances are subject to a guarantee provided by a bank or other financial institution established in the Member State or be covered by a facility provided as a guarantee by a public entity or by the Member State;
(b) those advances do not exceed 40 % of the total amount of the aid to be granted to a beneficiary for a given operation;
(c) those advances are covered by expenditure paid by beneficiaries in implementing the operation and supported by receipted invoices or accounting documents of equivalent probative value at the latest within 3 years following the year of the payment of the advance or on 31 December 2029, whichever is earlier, failing which the next payment application shall be corrected accordingly.
Each payment application which includes advances of this type shall separately disclose the total amount paid from the programme as advances, the amount which has been covered by expenditure paid by beneficiaries within 3 years of the payment of the advance in accordance with point (c), and the amount which has not been covered by expenditure paid by beneficiaries and for which the 3-year period has not yet elapsed.
Article 92
Specific elements for financial instruments in payment applications
Where financial instruments are implemented in accordance with Article 59(2), payment applications that include expenditure for financial instruments shall be submitted in accordance with the following conditions:
(a) the amount included in the first payment application shall have been paid to the financial instruments and may be up to 30 % of the total amount of programme contributions committed to the financial instruments under the relevant funding agreement, in accordance with the relevant priority and category of region, where applicable;
(b) the amount included in subsequent payment applications submitted during the eligibility period shall include the eligible expenditure as referred to in Article 68(1).
It shall be disclosed separately in payment applications.
Article 93
Common rules for payments
The support from the Funds to a priority in the payment of the balance of the final accounting year shall not exceed any of the following amounts:
(a) the public contribution declared in payment applications;
(b) support from the Funds paid or to be paid to beneficiaries;
(c) the amount requested by the Member State.
Amounts reimbursed pursuant to Article 36(5) shall not be taken into account for the purposes of calculating the ceiling set out in point (b) of the first subparagraph of this Article.
On the request of a Member State, interim payments may be increased by 10 % above the co-financing rate applicable to each priority for the Funds, if a Member State meets one of the following conditions after 1 July 2021:
(a) the Member State receives a loan from the Union pursuant to Council Regulation (EU) No 407/2010 (23);
(b) the Member State receives medium-term financial assistance under the European Stability Mechanism as established by the Treaty establishing the European Stability Mechanism of 2 February 2012 or as referred to in Regulation (EC) No 332/2002 conditional on the implementation of a macroeconomic adjustment programme;
(c) financial assistance is made available to the Member State conditional on the implementation of a macroeconomic adjustment programme as specified in Regulation (EU) No 472/2013.
The increased rate, which may not exceed 100 %, shall apply to requests for payments until the end of the calendar year in which the related financial assistance comes to an end.
Article 94
Union contribution based on unit costs, lump sums and flat rates
The amounts and rates proposed by the Member State shall be established on the basis of the following and assessed by the audit authority:
(a) a fair, equitable and verifiable calculation method based on any of the following: (i) statistical data, other objective information or an expert judgement; (ii) verified historical data; (iii) the application of usual cost accounting practices;
(b) draft budgets;
(c) the rules on corresponding unit costs, lump sums and flat rates applicable in Union policies for a similar type of operation;
(d) the rules on corresponding unit costs, lump sums and flat rates applied under schemes for grants funded entirely by the Member State for a similar type of operation.
Member States shall reimburse beneficiaries for the purposes of this Article. That reimbursement may take any form of support.
Commission and Member State audits and management verifications carried out by Member States shall exclusively aim at verifying that the conditions for reimbursement by the Commission have been fulfilled.
Article 95
Union contribution based on financing not linked to costs
The Commission may reimburse the Union contribution to all or parts of a priority of programmes based on financing not linked to costs in accordance with Article 51, either based on the amounts approved by a decision referred to in paragraph 2 of this Article or set out in the delegated act referred to in paragraph 4 of this Article. In order to make use of a Union contribution to the programme based on financing not linked to costs, Member States shall submit a proposal to the Commission in accordance with the templates set out in Annexes V and VI, as part of the programme or of a request for its amendment. The proposal shall contain the following information:
(a) identification of the priority concerned and the overall amount covered by the financing not linked to costs;
(b) a description of the part of the programme and the type of operations covered by the financing not linked to costs;
(c) a description of the conditions to be fulfilled or of the results to be achieved and a timeline;
(d) intermediate deliverables triggering reimbursement by the Commission;
(e) measurement units;
(f) the schedule for reimbursement by the Commission and related amounts linked to the progress in the fulfilment of conditions or achievement of results;
(g) the arrangements for verification of the intermediate deliverables and of the fulfilment of conditions or achievement of results;
(h) the methods for adjustment of the amounts, where applicable;
(i) the arrangements to ensure the audit trail in accordance with Annex XIII demonstrating the fulfilment of conditions or achievement of results;
(j) the envisaged type of reimbursement method used to reimburse the beneficiary or beneficiaries within the priority or parts of a priority of programmes concerned by this Article.
Commission and Member State audits and management verifications carried out by Member States shall exclusively aim at verifying that the conditions for reimbursement by the Commission have been fulfilled or the results have been achieved.
The Commission is empowered to adopt a delegated act in accordance with Article 114 to supplement this Article by establishing amounts for Union-level financing not linked to costs by type of operation, the methods for adjustment of the amounts and the conditions to be fulfilled or the results to be achieved.
Article 96
Interruption of the payment deadline
The Commission may interrupt the payment deadline, except for pre-financing, for a maximum period of 6 months where any of the following conditions is met:
(a) there is evidence to suggest a serious deficiency for which corrective measures have not been taken;
(b) the Commission has to carry out additional verifications following receipt of information that expenditure in a payment application may be linked to an irregularity.
Article 97
Suspension of payments
The Commission may suspend all or part of payments, except for pre-financing, after having given the Member State the opportunity to present its observations, if any of the following conditions is met:
(a) the Member State has failed to take the necessary action to remedy the situation giving rise to an interruption under Article 96;
(b) there is a serious deficiency;
(c) the expenditure in payment applications is linked to an irregularity that has not been corrected;
(d) there is a reasoned opinion by the Commission in respect of an infringement procedure under Article 258 TFEU on a matter that puts at risk the legality and regularity of expenditure.
CHAPTER II
Submission and examination of accounts
Article 98
Content and submission of accounts
For each accounting year for which payment applications have been submitted, the Member State shall submit to the Commission by 15 February, the following documents (‘the assurance package’) which shall cover the preceding accounting year:
(a) the accounts in accordance with the template set out in Annex XXIV;
(b) the management declaration referred to in point (f) of Article 74(1) in accordance with the template set out in Annex XVIII;
(c) the annual audit opinion referred to in point (a) of Article 77(3) in accordance with the template set out in Annex XIX;
(d) the annual control report referred to in point (b) of Article 77(3) in accordance with the template set out in Annex XX.
The accounts shall include at the level of each priority and, where applicable, by fund and by category of region:
(a) the total amount of eligible expenditure entered into the accounting systems of the body carrying out the accounting function which has been included in the final payment application for the accounting year and the total amount of the corresponding public contribution made or to be made linked to specific objectives for which enabling conditions are fulfilled and operations linked to specific objectives for which enabling conditions are not fulfilled but contribute to the fulfilment of enabling conditions;
(b) the amounts withdrawn during the accounting year;
(c) the amounts of public contribution paid to financial instruments;
(d) for each priority, an explanation on any differences between the amounts declared pursuant to point (a) and the amounts declared in payment applications for the same accounting year.
Member States shall in particular deduct from the accounts:
(a) the irregular expenditure which has been subject to financial corrections in accordance with Article 103;
(b) the expenditure which is subject to an ongoing assessment of its legality and regularity;
(c) other amounts as necessary to reduce the residual error rate of the expenditure declared in the accounts to 2 % or below.
The Member State may include expenditure under point (b) of the first subparagraph in a payment application in subsequent accounting years once its legality and regularity is confirmed.
Article 99
Examination of accounts
The Commission shall satisfy itself that the accounts are complete, accurate and true by 31 May of the year following the end of the accounting year unless Article 102 applies.
Article 100
Calculation of the balance
When the Commission determines the amount chargeable to the Funds for the accounting year and the consequent adjustments in relation to the payments to the Member State, it shall take into account:
(a) the amounts in the accounts referred to in point (a) of Article 98(3) and to which the co-financing rate for each priority is to be applied;
(b) the total amount of interim payments made by the Commission during that accounting year;
(c) for the ERDF, the ESF+, the Cohesion Fund, the JTF and the EMFAF, for the years 2021 and 2022, the amount of pre-financing.
Article 101
Procedure for the examination of accounts
The procedure set out in Article 102 shall apply in either of the following cases:
(a) the audit authority has provided a qualified or adverse audit opinion due to reasons linked to the completeness, accuracy and veracity of the accounts;
(b) the Commission has evidence putting into question the reliability of an unqualified audit opinion.
Article 102
Contradictory procedure for the examination of accounts
Where by the time limit set out in the first subparagraph:
(a) the audit opinion is unqualified, Article 100 shall apply and the Commission shall pay any additional amount due or proceed to a recovery within 2 months;
(b) the audit opinion is still qualified or documents have not been re-submitted by the Member State, paragraphs 2, 3 and 4 shall apply.
CHAPTER III
Financial corrections
Article 103
Financial corrections by Member States
By way of derogation from paragraphs 1, 2 and 3, in operations comprising financial instruments, a contribution cancelled in accordance with this Article, as a result of an individual irregularity, may be reused within the same operation under the following conditions:
(a) where the irregularity that gives rise to the cancellation of the contribution is detected at the level of the final recipient, only for other final recipients within the same financial instrument;
(b) where the irregularity that gives rise to the cancellation of the contribution is detected at the level of the body implementing the specific fund, where a financial instrument is implemented through a structure with a holding fund, only for other bodies implementing specific funds.
Where that irregularity that gives rise to the cancellation of the contribution is detected at the level of the body implementing the holding fund, or at the level of the body implementing the specific fund where a financial instrument is implemented through a structure without a holding fund, the contribution cancelled shall not be reused within the same operation.
Where a financial correction is made for a systemic irregularity, the contribution cancelled shall not be reused for any operation affected by the systemic irregularity.
The bodies implementing financial instruments shall not reimburse to Member States the amounts referred to in the first subparagraph provided that those bodies demonstrate for a given irregularity that the following cumulative conditions are fulfilled:
(a) the irregularity occurred at the level of final recipients or, in the case of a holding fund, at the level of bodies implementing specific funds or final recipients;
(b) the bodies implementing financial instruments carried out their obligations, in relation to the programme contributions affected by the irregularity, in accordance with applicable law and acted with the degree of professional care, transparency and diligence expected from a professional body experienced in implementing financial instruments;
(c) the amounts affected by the irregularity could not be recovered notwithstanding that the bodies implementing financial instruments pursued all applicable contractual and legal measures with due diligence.
Article 104
Financial corrections by the Commission
The Commission shall make financial corrections by reducing support from the Funds to a programme where it concludes that:
(a) there is a serious deficiency which has put at risk the support from the Funds already paid to the programme;
(b) expenditure contained in accepted accounts is irregular and was not detected and reported by the Member State;
(c) the Member State has not complied with its obligations under Article 97 prior to the opening of the financial correction procedure by the Commission.
Where the Commission applies flat-rate or extrapolated financial corrections, this shall be carried out in accordance with Annex XXV.
When deciding on a financial correction, the Commission shall take account of all information and observations submitted.
Where a Member State agrees to the financial correction for cases referred to in points (a) and (c) of the first subparagraph of paragraph 1 before the adoption of the decision referred to in the first subparagraph of this paragraph, the Member State may reuse the amounts concerned. That possibility shall not apply to a case of a financial correction under point (b) of the first subparagraph of paragraph 1.
The Fund-specific rules for the JTF may lay down specific bases for financial corrections by the Commission linked to the under-achievement of targets established for the JTF.
CHAPTER IV
Decommitment
Article 105
Decommitment principles and rules
Article 106
Exceptions to the decommitment rules
The amount concerned by decommitment shall be reduced by the amounts equivalent to that part of the budget commitment for which:
(a) the operations are suspended by a legal proceeding or by an administrative appeal having suspensory effect; or
(b) it has not been possible to make a payment application for reasons of force majeure seriously affecting implementation of all or part of the programme.
The national authorities claiming force majeure shall demonstrate the direct consequences of the force majeure on the implementation of all or part of the programme.
Article 107
Procedure for decommitment
In the absence of such a submission, the Commission shall amend the financing plan by reducing the contribution from the Funds for the calendar year concerned. That reduction shall be allocated to each priority proportionately to the amounts concerned by the decommitment that had not been used in the calendar year concerned.
TITLE VIII
FINANCIAL FRAMEWORK
Article 108
Geographical coverage of support for the Investment for jobs and growth goal
Resources from the ERDF and ESF+ for the Investment for jobs and growth goal shall be allocated among the following three categories of NUTS level 2 regions:
(a) less developed regions, whose GDP per capita is less than 75 % of the average GDP per capita of the EU-27 (‘less developed regions’);
(b) transition regions, whose GDP per capita is between 75 % and 100 % of the average GDP per capita of the EU-27 (‘transition regions’);
(c) more developed regions, whose GDP per capita is above 100 % of the average GDP per capita of the EU-27 (‘more developed regions’).
The classification of regions under one of the three categories of region shall be determined on the basis of how the GDP per capita of each region, measured in purchasing power standards (PPS) and calculated on the basis of Union figures for the period 2015-2017, relates to the average GDP per capita of the EU-27 for the same reference period.
Article 109
Resources for economic, social and territorial cohesion
The resources referred to in the first subparagraph shall be completed by an amount of EUR 10 000 000 000 in 2018 prices for measures referred to in Article 1(2) of Council Regulation (EU) 2020/2094 (24) for the purposes of the JTF Regulation. This amount shall constitute external assigned revenue for the purpose of Article 21(5) of the Financial Regulation.
For the purposes of programming and subsequent inclusion in the budget of the Union, amounts referred to in the first and second subparagraphs shall be indexed at 2 % per year.
That decision shall also set out the annual breakdown of the global resources per Member State under the European territorial cooperation goal (Interreg).
Article 110
Resources for the Investment for jobs and growth goal and for the European territorial cooperation goal (Interreg)
Resources for the Investment for jobs and growth goal under the MFF shall amount to 97,6 % of the global resources (i.e. a total of EUR 329 684 776 621 ) and shall be allocated as follows:
(a) 61,3 % (i.e. a total of EUR 202 226 984 629 ) for less developed regions;
(b) 14,5 % (i.e. a total of EUR 47 771 802 082 ) for transition regions;
(c) 8,3 % (i.e. a total of EUR 27 202 682 372 ) for more developed regions;
(d) 12,9 % (i.e. a total of EUR 42 555 570 217 ) for Member States supported by the Cohesion Fund;
(e) 0,6 % (i.e. a total of EUR 1 927 737 321 ) as additional funding for the outermost regions identified in Article 349 TFEU and the NUTS level 2 regions fulfilling the criteria laid down in Article 2 of Protocol No 6 to the 1994 Act of Accession;
(f) 0,2 % (i.e. a total of EUR 500 000 000 ) for interregional innovation investments;
(g) 2,3 % (i.e. a total of EUR 7 500 000 000 ) for the Just Transition Fund.
The amount of additional funding for the regions referred to in point (e) in paragraph 1 allocated to the ESF+ shall be EUR 472 980 447 .
The Commission shall adopt an implementing act setting out the amount to be transferred from each Member State’s Cohesion Fund allocation to the CEF and determined on a pro rata basis for the whole period.
The Cohesion Fund allocation of each Member State shall be reduced accordingly.
The annual appropriations corresponding to the support from the Cohesion Fund referred to in the first subparagraph shall be entered in the relevant budget lines of the CEF as of the 2021 budgetary exercise.
30 % of the resources transferred to the CEF shall be available immediately after the transfer to all Member States eligible for funding from the Cohesion Fund to finance transport infrastructure projects in accordance with the CEF Regulation.
Rules applicable for the transport sector under the CEF Regulation shall apply to the specific calls referred to in the first subparagraph. Until 31 December 2023, the selection of projects eligible for financing shall respect the national allocations under the Cohesion Fund with regard to 70 % of the resources transferred to the CEF.
As of 1 January 2024, resources transferred to the CEF which have not been committed to a transport infrastructure project shall be made available to all Member States eligible for funding from the Cohesion Fund to finance transport infrastructure projects in accordance with the CEF Regulation.
In order to support Member States which are eligible for funding from the Cohesion Fund and which might experience difficulties in designing projects that are of a sufficient maturity, quality, or both, and that have sufficient Union added value, particular attention shall be given to technical assistance which aims to strengthen the institutional capacity and the efficiency of public administrations and public services in relation to the development and implementation of projects listed in the CEF Regulation.
The Commission shall do its utmost to enable Member States eligible for funding from the Cohesion Fund to attain, by the end of the 2021-2027 period, the highest possible absorption of the amount transferred to the CEF, including through the organisation of additional calls.
Particular attention and support under the eighth and ninth subparagraph shall be given to those Member States whose GNI per capita, measured in PPS for the period 2015- 2017, is less than 60 % of the average GNI per capita of the EU-27.
In respect of Member States whose GNI per capita, measured in PPS for the period 2015-2017, is less than 60 % of the average GNI per capita of the EU-27, 70 % of 70 % of the amount of money that those Member States have transferred to the CEF shall be guaranteed until 31 December 2024.
Article 111
Transferability of resources
The Commission may accept a proposal by a Member State, in its submission of the Partnership Agreement or in the context of the mid-term review, for a transfer:
(a) adding up to not more than 5 % of the initial allocations for less developed regions to transition regions or more developed regions and from transition regions to more developed regions;
(b) from the allocations for more developed regions or transition regions to less developed regions and from more developed regions to transition regions.
By way of derogation from point (a) of the first subparagraph, the Commission may accept an additional transfer of up to 10 % of the total allocations for less developed regions to transition regions or more developed regions within those Member States whose GNI per capita, measured in PPS for the period 2015- 2017, is less than 90 % of the average GNI per capita of the EU-27. Resources of any additional transfer shall be used to contribute to the policy objectives referred to in points (a) and (b) of Article 5(1).
Article 112
Determination of co-financing rates
For each priority, the Commission decision shall set out whether the co-financing rate for the priority is to be applied to either of the following:
(a) total contribution, including public and private contribution;
(b) public contribution.
The co-financing rate for the Investment for jobs and growth goal at the level of each priority shall not be higher than:
(a) 85 % for the less developed regions;
(b) 70 % for transition regions that were classified as less developed regions for the 2014-2020 period;
(c) 60 % for the transition regions;
(d) 50 % for more developed regions that were classified as transition regions or had a GDP per capita below 100 % for the 2014-2020 period;
(e) 40 % for the more developed regions.
The co-financing rates set out under point (a) of the first subparagraph shall also apply to the outermost regions, including the additional allocation for the outermost regions.
The co-financing rate for the Cohesion Fund at the level of each priority shall not be higher than 85 %.
The ESF+ Regulation may establish higher co-financing rates in accordance with Articles 10 and 14 of that Regulation.
The co-financing rate, applicable to the region where the territory or territories identified in the territorial just transition plans are located, for the priority supported by the JTF shall not be higher than:
(a) 85 % for less developed regions;
(b) 70 % for transition regions;
(c) 50 % for more developed regions.
The total amount programmed under such priorities in a Member State shall not exceed 5 % of the initial national allocation from the ERDF and the ESF+ combined.
The Commission shall review the co-financing rate by 30 June 2024.
At least 30 % of the financial allocation of such a separate priority shall be attributed to operations which have beneficiaries that are local authorities or civil society organisations operating in local communities. Member States shall report on the fulfilment of that condition in the final performance report required under Article 43. Where that condition is not fulfilled, reimbursement by the Commission under the priority concerned shall be reduced proportionately to ensure that that condition is respected when calculating the final balance to be paid to the programme.
TITLE IX
DELEGATION OF POWER, IMPLEMENTING, TRANSITIONAL AND FINAL PROVISIONS
CHAPTER I
Delegation of power and implementing provisions
Article 113
Delegation of powers as regards certain Annexes
The Commission is empowered to adopt delegated acts in accordance with Article 114 to amend the Annexes to this Regulation, except Annexes III, IV, XI, XIII, XIV, XVII and XXVI, in order to adapt them to changes occurring during the programming period.
Article 114
Exercise of the delegation
Article 115
Committee procedure
CHAPTER II
Transitional and final provisions
Article 116
Review
The European Parliament and the Council shall review this Regulation by 31 December 2027 in accordance with Article 177 TFEU.
Article 117
Transitional provisions
Article 118
Conditions for operations subject to phased implementation
The managing authority may proceed with the selection of an operation consisting of the second phase of an operation selected for support and started under Regulation (EU) No 1303/2013, provided that the following cumulative conditions are met:
(a) the operation, as selected for support under Regulation (EU) No 1303/2013, has two phases identifiable from a financial point of view with separate audit trails;
(b) the total cost of the operation referred to in point (a) exceeds EUR 5 000 000 ;
(c) expenditure included in a payment application in relation to the first phase is not included under any payment applications in relation to the second phase;
(d) the second phase of the operation complies with applicable law and is eligible for support from the ERDF, the ESF+, the Cohesion Fund or the EMFAF under the provisions of this Regulation or the Fund-specific Regulations;
(e) the Member State commits to complete during the programming period and render operational the second and final phase in the final implementation report, or in the context of the European Maritime and Fisheries Fund in the last annual implementation report, submitted in accordance with Article 141 of Regulation (EU) No 1303/2013.
Article 118a
Conditions for operations subject to phased implementation that were selected for support before 29 June 2022 under Regulation (EU) No 1303/2013
By way of derogation from Article 73(1) and (2), the managing authority may decide to grant support to such an operation under this Regulation directly, provided that the following conditions are met:
(a) the operation has two phases that are identifiable from a financial point of view with separate audit trails;
(b) the operation falls within actions programmed under a relevant specific objective and is attributed to a type of intervention in accordance with Annex I;
(c) expenditure included in a payment application in relation to the first phase is not included under any payment applications in relation to the second phase;
(d) the Member State commits to complete during the programming period and render operational the second and final phase in the final implementation report, or in the context of the European Maritime and Fisheries Fund in the last annual implementation report, submitted in accordance with Article 141 of Regulation (EU) No 1303/2013.
This Article shall not apply to operations addressing migratory challenges resulting from the military aggression by the Russian Federation that are supported by making use of the possibility provided under the first and second subparagraphs of Article 98(4) of Regulation (EU) No 1303/2013.
Article 119
Entry into force
This Regulation shall enter into force on the day following that of its publication in the Official Journal of the European Union.
This Regulation shall be binding in its entirety and directly applicable in the Member States in accordance with the Treaties.
ANNEX I
Reading this document does not replace reading the official text published in the Official Journal of the European Union. We assume no responsibility for any inaccuracies arising from the conversion of the original to this format.
This text is published under EUR-Lex's own terms of reuse, not a Legalize or public-domain licence.
EUR-Lex
Creative Commons Attribution 4.0 International (CC BY 4.0)
© European Union, https://eur-lex.europa.eu — Source: EUR-Lex (Publications Office of the European Union). Reused under the Creative Commons Attribution 4.0 International (CC BY 4.0) licence. Only EU legislation published in the printed Official Journal of the European Union is deemed authentic; consolidated texts are reproduced here for documentation purposes and have been reformatted to Markdown.