The Building (Scotland) Regulations 2004

Type Scottish-Statutory-Instrument
Publication 2004-09-22
Last updated 2025-01-01
State In force
Jurisdiction Scotland
Department King's Printer for Scotland
PDF Download
articles Not indexed
Reform history JSON API

Noise reduction between rooms

Building insulation envelope

Heating system

Insulation of pipes, ducts and vessels

Artificial and display lighting

Mechanical ventilation and air conditioning

Commissioning building services

Written information

Energy Performance Certificates

Metering

Overheating risk

3.28

Every building must be designed and constructed in such a way that the risk to the health of the occupants from overheating is reduced.

Energy demand and carbon dioxide emissions

Electric vehicle charging

7.2

Every building must be designed and constructed in such a way that provision for the charging of electric vehicles is made where car parking spaces are located within the building or the curtilage of the building.

2A

Every conversion, to which these regulations apply, which—

  • (a) alters the number dwellings, or the number of building units, in the building,
  • (b) changes the occupation or use of—
  • (i) a residential building to any other type of building, or
  • (ii) a building so that it becomes a residential building,

must meet the requirements of standard 7.2 (electric vehicle charging) in section 7, sustainability, of schedule 5.

Interpretation

In this paragraph “building unit” means a part of a building which is designed or altered to be used separately.

Energy demand ...

Heating and hot water – direct emission heating system

6.11

Every building must be designed and constructed in such a way that the means by which space within the building is heated or cooled and by which hot water is made available in the building is not by means of a direct emission heating system.

2B

Every conversion, to which these regulations apply, must meet the requirements of standard 6.11 (heating and hot water – direct emission heating system) in section 6, energy, of schedule 5 but conversion of a pre-2024 building must meet those requirements only—

  • (a) if the conversion involves a change in occupation or use of the part of the building in which an existing direct emission heating system is located, and
  • (b) in so far as it is reasonably practicable to do so.

Gigabit-ready physical infrastructure for electronic communications networks

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.