  • (2) The “Water Framework Directive” means Directive 2000/60/EC of the European Parliament and of the Council of 23rd October 2010 establishing a framework for Community action in the field of water policy.

SCHEDULE 2 — Streets subject to street works

(1) (2)
Area Street subject to street work
City and County of Swansea Langdon Road between X1 and X2
City and County of Swansea Port access road between X3 and X4
City and County of Swansea Port access road between X4 and X5
City and County of Swansea Port access road from X4 to Baldwin’s Bridge off slip and link road and Fabian Way eastwards from the junction between the two to X6
Neath Port Talbot County Borough Fabian Way between X6 and X7
Neath Port Talbot County Borough Fabian Way between X7 and X8

SCHEDULE 3 — Streets to be temporarily stopped up

(1) (2) (3)
Area Street to be temporarily stopped up Extent of temporary stopping up
Neath Port Talbot County Borough Fabian Way Between X6 and X7
Neath Port Talbot County Borough Fabian Way Between X7 and X8
Neath Port Talbot County Borough Wales Coast Path footpath Between X9 and X10

SCHEDULE 4 — Access to works

(1) (2)
Area Access reference on works plans
City and County of Swansea Access A1 (permanent)
City and County of Swansea Access A2 (permanent)
City and County of Swansea Access A3 (permanent)
City and County of Swansea Access A4 (construction)
City and County of Swansea Access A5 (construction)
City and County of Swansea Access A6 (permanent)
City and County of Swansea Access A7 (permanent)
City and County of Swansea Access A8 (permanent)
Neath Port Talbot County Borough Access A9 (permanent)
Neath Port Talbot County Borough Access A10 (construction)
Neath Port Talbot County Borough Access A11 (construction)
Neath Port Talbot County Borough Access A12 (construction)
Neath Port Talbot County Borough Access A13 (construction)

SCHEDULE 5 — Modification of compensation and compulsory purchase enactments for creation of new rights

Compensation enactments modified

1

The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with all necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right as they apply to compensation on the compulsory purchase of land and interests in land.

Land Compensation Act 1973 modified

2

  • (1) Without limiting paragraph 1, the Land Compensation Act 197327 has effect subject to the modifications set out in sub-paragraph (2).
  • (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 of the 1965 Act—
  • (a) for “land is acquired or taken”, substitute “a right over land is purchased from”;
  • (b) for “acquired or taken from him”, substitute “over which the right is exercisable”.

Compulsory Purchase Act 1965 modified

3

Without limiting paragraph 1, the 1965 Act has effect with the modifications necessary to make it apply to the compulsory acquisition under this Order of a right by the creation of a new right as it applies to the compulsory acquisition under this Order of land, so that, in appropriate contexts, references in that Act to land are to be read (according to the requirements of the particular context) as referring to, or as including references to,—

  • (a) the right acquired or to be acquired; or
  • (b) the land over which the right is or is to be exercisable.

SCHEDULE 6 — Land of which temporary possession may be taken

(1) (2) (3)
Area Number of plot of land shown on land plan Purpose for which temporary possession may be taken
City and County of Swansea 01005 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01006 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01007 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01008 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01010 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01011 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01012 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01015 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01020 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01025 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01035 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01040 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01045 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01056 Provision of a working area and construction site related to Works No. 1a, 5a and 6a
City and County of Swansea 01059 Provision of a working area and construction site related to Works No. 1a, 5a and 6a
City and County of Swansea 01061 Provision of a working area and construction site related to Works No. 1a, 5a and 6a
City and County of Swansea 01062 Dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 01152 Provision of a working area and construction site related to Works No. 1a and 5a
City and County of Swansea 02050 Provision of a working area and construction site related to Works No. 7a, 9 and 10
City and County of Swansea 02070 Provision of a working area and construction site related to Works No. 7a, 9 and 10
City and County of Swansea 02075 Provision of a working area and construction site related to Works No. 7a, 9 and 10
City and County of Swansea 02115 Provision of a working area and construction site related to Works No. 7a, 9 and 10
City and County of Swansea 05010 Provision of a working area and construction site related to Works No. 1a, 5a and 6a
City and County of Swansea 05020 Provision of a working area and construction site related to Works No. 1a, 5a and 6a
City and County of Swansea 01060 Provision of a working area and construction site related to Works No. 1a and 5a; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 05011 Provision of a working area and construction site related to Works No. 1a and 5a; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 05015 Provision of a working area and construction site related to Works No. 1a, 5a and 6a; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 08005 Provision of a working area and construction site related to Works No. 1a, 5a and 6a; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 09005 Provision of a working area and construction site related to Works No. 1a, 5a and 6a; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 12005 Provision of a working area and construction site related to Works No. 1a, 2a, 2b, 2c and 2d; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 15005 Provision of a working area and construction site related to Works No. 1a, 2a, 2b, 2c and 2d; and dredging works under article 17 and paragraph 93 of Schedule 8
City and County of Swansea 14015 Provision of a working area and construction site related to Works No. 1b and 3
City and County of Swansea 16010 Provision of a working area and construction site related to Works No. 1b and 3
City and County of Swansea 16005B Provision of a working area and construction site related to Works No. 1b and 3
City and County of Swansea 17010 Provision of a working area and construction site related to Works No. 1b and 3
Neath Port Talbot County Borough 02036 Provision of Work No. 7g
Neath Port Talbot County Borough 02041 Provision of Work No. 7g
Neath Port Talbot County Borough 02042 Provision of Work No. 7g; and provision of a working area related to Works No. 1b and 10
Neath Port Talbot County Borough 03027 Provision of a working area and construction site for Works No. 1b and 10
Neath Port Talbot County Borough 14010 Provision of a working area and construction site related to Work No. 1b
Neath Port Talbot County Borough 07006 Provision of a working area and construction site related to Works No. 1b and 4; and dredging under article 17 and paragraph 23 of Schedule 8
Neath Port Talbot County Borough 07010 Provision of a working area and construction site related to Works No. 1b and 4; and dredging under article 17 and paragraph 23 of Schedule 8
Neath Port Talbot County Borough 07015 Provision of Work No. 4; dredging; and provision of a working area and construction site related to Works No. 1b and 4
Neath Port Talbot County Borough 10020 Provision of Work No. 4; dredging; and provision of a working area and construction site related to Works No. 1b and 4
Neath Port Talbot County Borough 11006 Provision of a working area and construction site related to Works No. 1b and 4; and dredging under article 17 and paragraph 23 of Schedule 8
Neath Port Talbot County Borough 11010 Provision of Work No. 4; dredging under article 17 and paragraph 23 of Schedule 8; and provision of a working area and construction site related to Works No. 1b and 4
Neath Port Talbot County Borough 11015 Provision of Work No. 4; dredging under article 17 and paragraph 23 of Schedule 8; and provision of a working area and construction site related to Works No. 1b and 4

SCHEDULE 7 — Documents to be certified

The land plans listed below—

(1) (2) (3)
Application Document No. Drawing No. Drawing Description
2.1.1b 2.1.1b Key plan
2.1.2b 2.1.2b Key plan Crown land
2.1.3c 2.1.3c Sheet 1
2.1.4b 2.1.4b Sheet 2
2.1.5b 2.1.5b Sheet 3
2.1.6b 2.1.6b Sheet 4
2.1.7b 2.1.7b Sheet 5
2.1.8b 2.1.8b Sheet 6
2.1.9b 2.1.9b Sheet 7
2.1.10b 2.1.10b Sheet 8
2.1.11b 2.1.11b Sheet 90
2.1.12b 2.1.12b Sheet 10
2.1.13b 2.1.13b Sheet 11
2.1.14b 2.1.14b Sheet 12
2.1.15b 2.1.15b Sheet 13
2.1.16b 2.1.16b Sheet 14
2.1.17b 2.1.17b Sheet 15
2.1.18b 2.1.18b Sheet 16
2.1.19b 2.1.19b Sheet 17
2.1.20b 2.1.20b Sheet 18

the works plans listed below—

(1) (2) (3)
Application Document No. Drawing No. Drawing Description
2.2.1 Works key plan
2.2.2B 3513/order/102.1D Works plan - Sheet 1
2.2.3B 3513/order/102.2D Works plan - Sheet 2
2.2.4B 3513/order/102.3D Works plan - Sheet 3
2.2.5B 3513/order/102.4D Works plan - Sheet 4
2.2.6B 3513/order/102.5D Works plan - Sheet 5
2.2.7B 3513/order/102.6D Works plan - Sheet 6
2.2.8B 3513/order/102.7D Works plan - Sheet 7
2.2.9B 3513/order/102.8D Works plan - Sheet 8
2.2.10B 3513/order/102.9D Works plan - Sheet 9
2.2.11A 5118483-ATK-02-ZZ-DR-C-1201A Marine Works Seawalls Sections - Sheet 1
2.2.12A 5118483-ATK-02-ZZ-DR-C-1202A Marine Works Seawalls Sections - Sheet 2
2.2.13A 5118483-ATK-02-ZZ-DR-C-1203A Marine Works Seawalls Sections - Sheet 3
2.2.14A 5118483-ATK-02-ZZ-DR-C-1204A Marine Works Seawalls Sections - Sheet 4
2.2.15A 5118483-ATK-02-ZZ-DR-C-1205A Marine Works Seawalls Sections - Sheet 5
2.2.16A 5118483-ATK-02-ZZ-DR-C-1206A Marine Works Typical Sections

the access and public rights of way plans listed below—

(1) (2) (3)
Application Document No. Drawing No. Drawing Description
2.2.17A 3513/Order/201A Access & Public Rights of Way key plan
2.2.18 3513/Order/20.21 Access & Public Rights of Way - Sheet 1
2.2.19A 3513/Order/202.2A Access & Public Rights of Way - Sheet 2
2.2.20A 3513/Order/202.3A Access & Public Rights of Way - Sheet 3
2.2.21 3513/Order/202.4 Access & Public Rights of Way - Sheet 4
2.2.22 3513/Order/202.5 Access & Public Rights of Way - Sheet 5
2.2.23 3513/Order/202.6 Access & Public Rights of Way - Sheet 6
2.2.24 3513/Order/202.7 Access & Public Rights of Way - Sheet 7
2.2.25 3513/Order/202.8 Access & Public Rights of Way - Sheet 8
2.2.26 3513/Order/202.9 Access & Public Rights of Way - Sheet 9
2.2.27 3513/Order/202.10 Access & Public Rights of Way - Sheet 10
2.2.28 3513/Order/202.11 Access & Public Rights of Way - Sheet 11
  • the Book of Reference dated 25th November 2014 (“Version 1.7”);
  • the Environmental Statement which accompanied the application to the Secretary of State for an order granting development consent;
  • the Design and Access Statement of February 2014 (“Document 8.1”);
  • the Demolition Plan; bearing reference 3513/Order/401, 402.1, 402.2 and 402.3
  • drawing TLP - SWANSEA BAY - 141003 - VO.2 referred to in Requirement 19 (Piling);
  • ERA report 2015 - 0265 as referred to in Requirement 15 (Electrical Grid Connection Works);
  • Land Contamination: A Guide for Developers (WLGA, WAG & EAW, 2012) as referred to in Requirement 12 (contamination and groundwater);
  • the Operational Phase Traffic Management Plan submitted with the application;
  • the outline Construction Environmental Management Plan dated 25th November 2014;
  • the outline Operational Environmental Management Plan dated 4th November 2014;
  • the outline Adaptive Environmental Management Plan dated 25th November 2014;
  • TEST the agreement pursuant to section 106 of the Town and Country Planning Act 1990 ... between The City and County of Swansea Council, Neath Port Talbot County Borough Council, AB Ports and the undertaker of 8th December 2014; and

the drawings listed below, which comprise the planning drawings, and includes works sections—

(1) (2) (3)
Application Document No. Drawing No. Drawing Description
2.4.1A 3513_PL_001A Masterplan Key Plan
2.4.2 3513_PL_002.1 Masterplan Detail Scale - Sheet 1 of 6
2.4.3 3513_PL_002.2 Masterplan Detail Scale - Sheet 2 of 6
2.4.4 3513_PL_002.3 Masterplan Detail Scale - Sheet 3 of 6
2.4.5 3513_PL_002.4 Masterplan Detail Scale - Sheet 4 of 6
2.4.6 3513_PL_002.5 Masterplan Detail Scale - Sheet 5 of 6
2.4.7 3513_PL_002.6 Masterplan Detail Scale - Sheet 6 of 6
2.4.19 3513_PL_112 Typical Lagoon Wall Treatment Plan and Section
2.4.21 3513_PL_114 Halfway Point Plan and Section
2.4.23 5118483-ATK-02-ZZ-DR-C-1207 Marine Works Lagoon Water Shuttle
2.4.24 5118483-ATK-02-ZZ-DR-C-1110 Marine Works Turbine Housing and Sluices General Arrangement
2.4.25A TLSB-ATK-02-XX-DR-C-2000A Marine Works 7m Turbine House Typical Section
2.4.26A 5118483-ATK-02-ZZ-DR-C-1209A Marine Works Sluice House Typical Section
2.4.27A 5118483-ATK-02-ZZ-DR-C-1213A Marine Works Turbine and Sluice Gate Housing Elevation
2.4.28 5118483-ATK-00-ZZ-DR-C-1301 HV Cable Route and Utilities - Sheet 1 of 8
2.4.29 5118483-ATK-00-ZZ-DR-C-1302 HV Cable Route and Utilities - Sheet 2 of 8
2.4.30 5118483-ATK-00-ZZ-DR-C-1303 HV Cable Route and Utilities - Sheet 3 of 8
2.4.31 5118483-ATK-00-ZZ-DR-C-1304 HV Cable Route and Utilities - Sheet 4 of 8
2.4.32 5118483-ATK-00-ZZ-DR-C-1305 HV Cable Route and Utilities - Sheet 5 of 8
2.4.33 5118483-ATK-00-ZZ-DR-C-1306 HV Cable Route and Utilities - Sheet 6 of 8
2.4.34 5118483-ATK-00-ZZ-DR-C-1307 HV Cable Route and Utilities - Sheet 7 of 8
2.4.35 5118483-ATK-00-ZZ-DR-C-1308 HV Cable Route and Utilities - Sheet 8 of 8
2.4.36 5118483-ATK-02-ZZ-DR-C-1210 HV Cable Route Typical Details
2.4.37 5118483-ATK-HW00-ZZ-DR-D-1401 Improvement Works to Existing Highway Fabian Way Junction 3 - General Arrangement
2.4.38 5118483-ATK-HW00-ZZ-DR-D-1402 TLP Access Road and Construction Access Road - General Arrangement
2.4.39 5118483-ATK-HW00-ZZ-DR-D-1406 ABP Junction Arrangement - General Arrangement
2.4.40A 5118483-ATK-00-ZZ-DR-C-1111A Marine Works Dredging General Arrangement
2.4.41 3513/Order/401 Demolition (s) Key Plan
2.4.42 3513/Order/402.1 Demolition (s) Plan - Sheet 1 of 3
2.4.43 3513/Order/402.2 Demolition (s) Plan - Sheet 2 of 3
2.4.44 3513/Order/402.3 Demolition (s) Plan - Sheet 3 of 3
2.4.58 1259_C1002_A Proposed Drawings: Burrows Information Centre

SCHEDULE 8

PART 1 — For the protection of Associated British Ports

Interpretation

1

In this Part—

  • “accumulation” means any accumulation of silt or other material (including any materials used to construct the authorised development) which constitutes an impediment to navigation at or in the approaches to the harbours;
  • “authorised development” means the works set out in Parts 1A, 1B and 2 of Schedule 1 (authorised development, and ancillary and necessary works);
  • “construction” includes execution and placing, maintenance, extension, enlargement, alteration, replacement, relaying, and removal, or the carrying out of an operation, and “construct” and “constructed” are to be construed accordingly;
  • “erosion” means any erosion of the bed or banks of the sea or of any jetty or other structure of whatever nature within the harbours or the approaches to the harbours;
  • “the harbours” means the ports of Swansea and Port Talbot;
  • “plans” includes sections, descriptions, drawings, specifications, proposed method statements and hydraulic information;
  • “port land” means any land held by AB Ports for the purpose of its statutory undertaking;
  • “specified work” means any tidal work and any work or operation authorised by this Order on port land or which may affect port land or navigation in respect of the harbours or the functions of AB Ports in relation to the operation of the harbours; and
  • “tidal work” includes dredging authorised by this Order or any marine licence granted under Part 4 of the 2009 Act relating to the authorised development.

General

2

For the protection of AB Ports in relation to the harbours the following provisions have effect unless otherwise agreed in writing between the undertaker and AB Ports.

Acquisition or use of port land

3

  • (1) The undertaker must not under the powers conferred by this Order acquire or use, or acquire new rights over, port land without the consent of AB Ports.
  • (2) The undertaker must not exercise powers conferred by article 15 (authority to survey and investigate the land) or the powers conferred by section 11(3) of the 1965 Act (powers of entry) in respect of any port land without the consent of AB Ports.
  • (3) Article 25 (power to override easements and other rights) does not apply to any rights held by AB Ports for the purpose of its statutory undertaking, except with the consent of AB Ports.
  • (4) The consent of AB Ports under this paragraph must not be unreasonably withheld but may be given subject to reasonable conditions.

Approval of plans and arrangements

4

  • (1) Before commencing the construction of any specified work, the undertaker must furnish to AB Ports plans of that work for its approval.
  • (2) Before decommissioning the generating station comprised in the authorised development the undertaker must furnish to AB Ports for its approval proposed arrangements for the removal or retention of the authorised development and for making it safe and managing it after it has ceased to be used for the generation of electricity.
  • (3) Any approval of AB Ports under this paragraph—
  • (a) must not be unreasonably withheld;
  • (b) may be given subject to such reasonable requirements as AB Ports may make for the protection of the harbours and navigation within the harbours and the approaches to the harbours, including a requirement for the undertaker to carry out protective works at its own expense;
  • (c) may not vary the operation of this Order.
  • (4) The undertaker must—
  • (a) carry out any specified work and any protective works required under sub-paragraph (3) in accordance with the plans approved under sub-paragraph (1) or settled under article 50 (arbitration); and
  • (b) comply with any arrangements approved under sub-paragraph (2) or settled under article 50 (arbitration).
  • (5) If AB Ports fails to express its disapproval of any plans or arrangements within 56 days after they have been delivered to it under sub-paragraph (1) or (2), it is deemed to have approved them.
  • (6) Nothing in this paragraph affects the operation of article 42 (application of Energy Act 2004 in relation to decommissioning) or a decommissioning programme approved under that article.

Notice of works

5

The undertaker must give to AB Ports not less than 56 days’ written notice of its intention to commence the construction of a specified work and, not more than 14 days after completion of such construction, must give to AB Ports written notice of such completion.

Inspection

6

The undertaker must at all reasonable times during construction of a specified work and thereafter allow AB Ports, its servants and agents, access to such work and all reasonable facilities for inspection of any such work subject always to the reasonable stipulations of the undertaker relating to health, safety, security and confidentiality.

Temporary works

7

  • (1) After the purpose of any temporary works has been accomplished the undertaker must with all reasonable dispatch, or after a reasonable period of notice in writing from AB Ports requiring the undertaker so to do, remove any such temporary works or any materials relating to them which may have been placed on port land or below the level of high water within the harbours or the approaches to the harbours by or on behalf of the undertaker.
  • (2) If the undertaker fails to do so within a reasonable period after receiving such notice, AB Ports may remove the same and may recover the reasonable costs of doing so from the undertaker.

Erosion or accumulation

8

  • (1) If during the construction of a tidal work or after the completion of that work and wholly or partly in consequence of its construction there is caused or created an accumulation or erosion the undertaker, if so requested by AB Ports acting reasonably, shall remedy such accumulation or erosion to the extent attributable to such construction and, if it refuses or fails to do so, AB Ports may itself cause the work to be done and may recover the reasonable cost of doing so from the undertaker.
  • (2) For the purposes of sub-paragraph (1)—
  • (a) in the case of an accumulation, the remedy shall be its removal; and
  • (b) in the case of erosion, the remedy shall be the carrying out of such reconstruction works and other protective works or measures as AB Ports reasonably requires.
  • (3) In the event that surveys, inspection, tests and sampling carried out pursuant to paragraph 12(1)(b) establish that such accumulation or erosion would have been caused in any event by factors other than the construction of a tidal work, the undertaker shall be liable to remedy such accumulation or erosion only to the extent that the same is attributable to such construction.
  • (4) Nothing in this paragraph removes the need for a marine licence under Part 4 of the 2009 Act.

Lighting, etc.

9

The undertaker shall pay to AB Ports the reasonable costs of such alterations to the marking and lighting of the harbours and the approaches to the harbours as may be necessary in consequence of the construction of a tidal work.

Abandoned or decayed works

10

  • (1) If any tidal work or any other work of which the undertaker is in possession in exercise of any of the powers conferred by this Order is abandoned or falls into decay, insofar as it affects or otherwise impacts upon the operation of the harbours or navigation in the approaches to the harbours, AB Ports may by notice in writing require the undertaker to take such reasonable steps as may be specified in the notice either to repair or restore the work, or any part of it, or to remove the work and (to such extent as AB Ports reasonably requires) to restore the site to its former condition.
  • (2) If any tidal work is in such condition that it is, or is likely to become, a danger to or an interference with navigation, AB Ports may by notice in writing require the undertaker to take such reasonable steps as may be specified in the notice—
  • (a) to repair and restore the work or part of it; or
  • (b) if the undertaker so elects, to remove the tidal work and (to such extent as AB Ports reasonably requires) to restore the site to its former condition.
  • (3) If after such reasonable period as may be specified in a notice under this paragraph the undertaker has failed to begin taking steps to comply with the requirements of the notice, or after beginning has failed to make reasonably expeditious progress towards their implementation, AB Ports may carry out the works specified in the notice and any expenditure reasonably incurred by it in so doing is recoverable from the undertaker.
  • (4) This provision shall not apply where any work is being managed and operated in accordance with any approval given by AB Ports.
  • (5) In the event of a difference or dispute between the undertaker and AB Ports as to the necessity of any steps or works specified in a notice by AB Ports under this paragraph, such difference or dispute shall be determined by arbitration in accordance with article 50 (arbitration).
  • (6) Nothing in this paragraph affects the operation of article 42 (application of Energy Act 2004 in relation to decommissioning), or a decommissioning programme approved under that article.

Byelaws

11

The undertaker must consult AB Ports not less than 42 days before making any byelaw under article 47 (byelaws) and shall not make any byelaw which in the reasonable opinion of AB Ports conflicts with any byelaws made by AB Ports or with any powers exercisable by AB Ports or a harbour master of AB Ports for the regulation of navigation at the harbours or the approaches to the harbours.

Indemnity

12

  • (1) Without limiting the other provisions of this Part, the undertaker is to be responsible for, and make good to AB Ports, all losses, costs, charges, damages and expenses however caused which may reasonably be incurred by or occasioned to AB Ports by reason of or arising from or in connection with—
  • (a) the perusal of plans and navigation schemes and the inspection of a specified work by AB Ports or its duly authorised representative;
  • (b) the carrying out of surveys, inspections, tests and sampling within the harbours and the approaches to the harbours—
  • (i) to establish the marine conditions prevailing prior to the construction of any of the tidal works in such area of the River Tawe as AB Ports has reasonable cause to believe may subsequently be affected by any accumulation or erosion which the undertaker is liable to remedy under paragraph 8; and
  • (ii) where AB Ports has reasonable cause to believe that the construction of any of the tidal works is causing or has caused any such accumulation or erosion;
  • (c) the construction or failure of a specified work, or the undertaking by AB Ports of works or measures to prevent or remedy danger or impediment to navigation or damage to any property of AB Ports arising from such construction or failure including—
  • (i) any additional costs of dredging incurred by AB Ports as a result of contamination of the seabed caused by the construction of the specified work; and
  • (ii) any damage to the lock gates or damage from flooding caused by increased wave reflection as a result of the construction of the specified work;
  • (d) any act or omission of the undertaker or their servants or agents whilst engaged in the construction of a specified work.
  • (2) Without limiting the generality of sub-paragraph (1), the undertaker must indemnify AB Ports from and against all claims and demands arising out of, or in connection with, such construction, or failure or act or omission as is mentioned in that sub-paragraph.
  • (3) Nothing in this paragraph imposes any liability on the undertaker to the extent that any losses, costs, charges, damages, expenses, claims or demands referred to in sub-paragraph (1) or (2) are attributable to negligence on the part of AB Ports or of any person in its employ or of its contractors or agents.
  • (4) AB Ports must give to the undertaker notice in writing of any claim or demand for which the undertaker may be liable under this paragraph and no settlement or compromise of any such claim or demand may be made without the consent in writing of the undertaker.

13

The fact that any work or thing has been executed or done with the consent of AB Ports and in accordance with any conditions or restrictions prescribed by AB Ports or in accordance with any plans approved or deemed to be approved by AB Ports or to its satisfaction or in accordance with any directions or award of any arbitrator or in accordance with any plans approved by the Welsh Ministers and any conditions or restrictions imposed by them, does not relieve the undertaker from any liability under the provisions of this Part.

14

With the exception of any duty owed by AB Ports to the undertaker expressly provided for in the foregoing provisions of this Part, nothing in this Order is to be construed as imposing upon AB Ports, either directly or indirectly, any form of duty or liability to which AB Ports would not otherwise be subject which is enforceable by proceedings before any court.

Statutory functions

15

Save to the extent expressly provided for nothing in this Order affects prejudicially any statutory or other rights, powers or privileges vested in, or enjoyed by, AB Ports at the commencement of this Order.

Arbitration

16

Any difference or dispute arising under this Part shall, unless otherwise agreed in writing between the undertaker and AB Ports, be determined by arbitration in accordance with article 50 (arbitration).

PART 2 — For the protection of Neath Port Authority

Interpretation

17

In this Part—

  • “accumulation” means any accumulation of silt or other material (including any materials used to construct the authorised development) which constitutes an impediment to navigation at or in the approaches to the harbour including but not limited to accumulations against Work No. 1b;
  • “authorised development” means the works set out in Parts 1A, 1B and 2 of Schedule 1 (authorised development, and ancillary and necessary works);
  • “construction” includes execution and placing, maintenance, extension, enlargement, alteration, replacement, relaying, and removal, or the carrying out of an operation and “construct” and “constructed” are to be construed accordingly;
  • “erosion” means any erosion of the bed or banks of the sea or of any jetty or other structure of whatever nature within the harbour or the approaches to the harbour;
  • “the harbour” means the Port of Neath;
  • “plans” includes sections, descriptions, drawings, specifications, proposed method statements, hydraulic and bathymetric survey information and risk assessment;
  • “specified work” means any tidal work and any work or operation authorised by the Order which is likely to affect navigation in respect of the harbour or the functions of Neath Port Authority in relation to the operation of the harbour; and
  • “tidal work” includes dredging authorised by this Order or any licence granted under Part 4 of the 2009 Act relating to the authorised development.

General

18

For the protection of Neath Port Authority in relation to the harbour the following provisions have effect unless otherwise agreed in writing between the undertaker and Neath Port Authority.

Approval of plans and arrangements

19

  • (1) Before commencing the construction of any specified work the undertaker must furnish to Neath Port Authority plans of that work for its approval.
  • (2) Any approval of Neath Port Authority under this paragraph—
  • (a) must not be unreasonably withheld or delayed;
  • (b) may be given subject to such reasonable requirements as Neath Port Authority may make for the protection of the harbour and navigation within the harbour and the approaches to the harbour, including a requirement for the undertaker to carry out protective works at its own expense;
  • (c) may not vary the operation of this Order.
  • (3) The undertaker must carry out any specified work and any protective works required under sub-paragraph (2) in accordance with the plans approved under sub-paragraph (1) or settled under article 50 (arbitration).
  • (4) If Neath Port Authority fails to express its disapproval of any plans or arrangements within 56 days after they have been delivered to it under sub-paragraph (1), it will be deemed to have approved them.

Notice of works

20

The undertaker must give to Neath Port Authority not less than 56 days’ written notice of its intention to commence the construction of the specified work and, not more than 14 days after completion of such construction, must give to Neath Port Authority written notice of such completion.

Inspection

21

The undertaker must at all reasonable times during construction of a specified work and thereafter allow Neath Port Authority, its servants and agents, access to such work and all reasonable facilities for inspection of any such work subject always to the reasonable stipulations of the undertaker relating to health, safety, security and confidentiality.

Temporary works

22

  • (1) After the purpose of any temporary works has been accomplished, the undertaker must with all reasonable dispatch, or after a reasonable period of notice in writing from Neath Port Authority requiring the undertaker so to do, remove any such temporary works or any materials relating to them which may have been placed below the level of high water within the harbour or the approaches to the harbour by or on behalf of the undertaker.
  • (2) If the undertaker fails to do so within a reasonable period after receiving such notice, Neath Port Authority may remove the same and may recover the reasonable costs of doing so from the undertaker.

Erosion or accumulation

23

  • (1) If during the construction of a tidal work or after the completion of that work and wholly or partly in consequence of its construction there is caused or created an accumulation or erosion within the harbour or approaches to the harbour that is likely to be detrimental to navigation, the undertaker, if so requested by Neath Port Authority acting reasonably, shall remedy such accumulation or erosion to the extent attributable to such construction and, if it refuses or fails to do so, Neath Port Authority may itself cause the work to be done and may recover the reasonable cost of doing so from the undertaker.
  • (2) For the purposes of sub-paragraph (1)—
  • (a) in the case of an accumulation, the remedy shall be its removal; and
  • (b) in the case of erosion, the remedy shall be the carrying out of such reconstruction works and other protective works or measures as Neath Port Authority reasonably requires.
  • (3) In the event that surveys, inspection, tests and sampling carried out pursuant to paragraph 26(1)(b) establish that such accumulation or erosion would have been caused in any event by factors other than the construction of a tidal work, the undertaker shall be liable to remedy such accumulation or erosion only to the extent that the same is attributable to such construction.
  • (4) Nothing in this paragraph removes the need for a marine licence under Part 4 of the 2009 Act.

Lighting, etc.

24

The undertaker shall pay to Neath Port Authority the reasonable costs of such alterations to the marking and lighting of the harbour and the approaches to the harbour as may be necessary in consequence of the construction of a tidal work.

Abandoned or decayed works

25

  • (1) If any tidal work or any other work of which the undertaker is in possession in exercise of any of the powers conferred by this Order is abandoned or falls into decay, insofar as it affects or otherwise impacts upon the operation of the harbour or navigation in the approaches to the harbours, Neath Port Authority may by notice in writing require the undertaker to take such reasonable steps as may be specified in the notice either to repair or restore the work, or any part of it, or to remove the work and (to such extent as Neath Port Authority reasonably requires) to restore the site to its former condition.
  • (2) If any tidal work is in such condition that it is, or is likely to become, a danger to or an interference with navigation, Neath Port Authority may by notice in writing require the undertaker to take such reasonable steps as may be specified in the notice—
  • (a) to repair and restore the work or part of it; or
  • (b) if the undertaker so elects, to remove the tidal work and (to such extent as Neath Port Authority reasonably requires) to restore the site to its former condition.
  • (3) If after such reasonable period as may be specified in a notice under this paragraph the undertaker has failed to begin taking steps to comply with the requirements of the notice, or after beginning has failed to make reasonably expeditious progress towards their implementation, Neath Port Authority may carry out the works specified in the notice and any expenditure reasonably incurred by it in so doing is recoverable from the undertaker.
  • (4) This provision shall not apply where any work is being managed and operated in accordance with any approval given by Neath Port Authority or by any programme approved by the Secretary of State to which article 42 (Application of Energy Act 2004 in relation to decommissioning) applies.
  • (5) In the event of a difference or dispute between the undertaker and Neath Port Authority as to the necessity of any steps or works specified in a notice by Neath Port Authority under this paragraph such difference or dispute shall be determined by arbitration in accordance with article 50 (arbitration).
  • (6) Nothing in this paragraph affects the operation of article 42 (Application of Energy Act 2004 in relation to decommissioning) or a decommissioning programme approved under that article.

Indemnity

26

  • (1) Without limiting to the other provisions of this Part, the undertaker is to be responsible for, and make good to Neath Port Authority, all losses, costs, charges, damages and expenses however caused which may reasonably be incurred by or occasioned to Neath Port Authority by reason of or arising from or in connection with—
  • (a) the perusal of plans and navigation schemes and the inspection of the specified work by Neath Port Authority or its duly authorised representative;
  • (b) the carrying out of surveys, inspections, tests and sampling within the harbour and the approaches to the harbours—
  • (i) to establish the marine conditions prevailing prior to the construction of any tidal work in such area as Neath Port Authority has reasonable cause to believe may subsequently be affected by any accumulation or erosion which the undertaker is liable to remedy under paragraph 23; and
  • (ii) where Neath Port Authority has reasonable cause to believe that the construction of any of the tidal works is causing or has caused any such accumulation or erosion;
  • (c) the construction or failure of a specified work, or the undertaking by Neath Port Authority of works or measures to prevent or remedy danger or impediment to navigation or damage to any property of Neath Port Authority arising from such construction or failure;
  • (d) any act or omission of the undertaker or their servants or agents whilst engaged in the construction of a specified work.
  • (2) Without limiting the generality of sub-paragraph (1), the undertaker shall indemnify Neath Port Authority from and against all claims and demands arising out of, or in connection with, such construction, or failure or act or omission as is mentioned in that sub-paragraph.
  • (3) Nothing in this paragraph imposes any liability on the undertaker to the extent that any losses, costs, charges, damages, expenses, claims or demands referred to in sub-paragraph (1) or (2) are attributable to negligence on the part of Neath Port Authority or of any person in its employ or its contractors or agents.
  • (4) Neath Port Authority must give to the undertaker notice in writing of any claim or demand for which the undertaker may be liable under this paragraph, and no settlement or compromise of any such claim or demand may be made without the consent in writing of the undertaker.

27

The fact that any work or thing has been executed or done with the consent of Neath Port Authority and in accordance with any conditions or restrictions prescribed by Neath Port Authority or in accordance with any plans approved or deemed to be approved by Neath Port Authority or to its satisfaction or in accordance with any directions or award of any arbitrator or and any conditions or restrictions imposed by the arbitrator, does not relieve the undertaker from any liability under the provisions of this Part.

28

With the exception of any duty owed by Neath Port Authority to the undertaker expressly provided for in the foregoing provisions of this Part, nothing in this Order is to be construed as imposing upon Neath Port Authority, either directly or indirectly, any form of duty or liability to which Neath Port Authority would not otherwise be subject which is enforceable by proceedings before any court.

Statutory functions

29

Save to the extent expressly provided for nothing in this Order affects prejudicially any statutory or other rights, powers or privileges vested in, or enjoyed by, Neath Port Authority at the commencement of this Order.

Arbitration

30

Any difference or dispute arising under this Part shall, unless otherwise agreed in writing between the undertaker and Neath Port Authority, be determined by arbitration in accordance with article 50 (arbitration).

PART 3 — For the protection of National Grid Electricity Transmission Plc

Application

31

For the protection of the protected person, the following provisions shall, unless otherwise agreed in writing between the protected person and the persons concerned, have effect.

Interpretation

32

In this Part—

  • “alternative apparatus” means appropriate alternative apparatus to the satisfaction of the protected person to enable the protected person to fulfil its statutory functions in a manner no less efficient than previously;
  • “apparatus” means electric lines or electrical plant as defined in the Electricity Act 1989 belonging to or maintained by that protected person;
  • “authorised development” means the works set out in Parts 1A, 1B and 2 of Schedule 1 (authorised development, and ancillary and necessary works), and for the purposes of this Part includes the use and maintenance of the authorised development;
  • “commence” has the same meaning as in article 2 but for the purposes of this Schedule any works whatsoever which are near to or may affect apparatus of the protected person shall be included within that definition and for the avoidance of doubt this includes works for the diversion or laying of services and commencement shall be construed accordingly;
  • “functions” includes powers and duties;
  • “ground mitigation scheme” means a scheme approved by the protected person (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
  • “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for the protected person’s approval a ground mitigation scheme;
  • “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
  • “maintain” and “maintenance” shall include the ability and right in relation to any apparatus or alternative apparatus of the protected person to construct, use, repair, alter, inspect, renew or remove the apparatus;
  • “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed; and
  • “protected person” means National Grid Electricity Transmission plc.

33

Except for paragraphs 34 (apparatus of protected persons in stopped up streets), 39 (retained apparatus: protection), 40 (expenses) and 41 (indemnity) this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the protected person are regulated by the provisions of Part 3 of the 1991 Act.

Apparatus of protected persons in stopped up streets

34

  • (1) Where any street is stopped up under article 10 (temporary stopping up of streets), the protected person whose apparatus is in the street or accessed via that street shall be entitled to the same rights in respect of such apparatus as it enjoyed immediately before the stopping up and the undertaker will grant to the protected person legal easements reasonably satisfactory to the protected person in respect of such apparatus and access to it prior to the stopping up of any such street or highway.
  • (2) Notwithstanding the temporary stopping up or diversion of any street under the powers in article 10 (temporary stopping up of streets), the protected person is at liberty at all times to take all necessary access across any such stopped up street or to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.

Protective works to buildings

35

  • (1) The undertaker, in the case of the powers conferred by article 14 (protective work to buildings), shall so exercise those powers as not to obstruct or render less convenient the access to any apparatus without the written consent of the protected person and, if by reason of the exercise of those powers any damage to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal or abandonment) or property of the protected person or any interruption in the supply of electricity by the protected person is caused, the undertaker shall bear and pay on demand the cost reasonably incurred by that protected person in making good such damage or restoring the supply; and, subject to sub-paragraph (2), shall—
  • (a) make compensation to the protected person for any loss sustained by it; and
  • (b) indemnify the protected person against all claims, demands, proceedings, costs, damages and expenses which may be made or taken against or recovered from or incurred by the protected person, by reason of any such damage or interruption.
  • (2) Nothing in this paragraph imposes any liability on the undertaker with respect to any damage or interruption to the extent that such damage or interruption is attributable to the act, neglect or default of the protected person or its contractors or workers; and the protected person shall give to the undertaker reasonable notice of any claim or demand as aforesaid and no settlement or compromise thereof shall be made without first consulting the undertaker and giving it an opportunity to make representations as to the claim or demand.

Acquisition of land

36

This Order does not authorise the acquisition or extinguishment of land or rights in land or override any interest in land owned by the protected person that is or are required for the retention or maintenance of any retained apparatus except with the agreement of the protected person which shall not be unreasonably withheld.

Removal of apparatus

37

  • (1) If, in the exercise of the agreement reached in accordance with paragraph 36 or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus shall not be removed under this Part and any right of the protected person to maintain that apparatus in that land shall not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of the protected person in accordance with sub-paragraphs (2) to (6).
  • (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it shall give to the protected person 56 days’ advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order the protected person reasonably needs to remove any of its apparatus) the undertaker shall, subject to sub-paragraph (3), afford to the protected person to their satisfaction (taking into account paragraph 38(1)) the necessary facilities and rights for—
  • (a) the construction of alternative apparatus in other land of the undertaker; and
  • (b) subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, the protected person shall, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for the protected person to use its compulsory purchase powers to this end unless it elects to so do.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part shall be constructed in such manner and in such line or situation as may be agreed between the protected person and the undertaker.
  • (5) The protected person shall, after the alternative apparatus to be provided or constructed has been agreed, and subject to the grant to the protected person of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
  • (6) Where there is any inconsistency or duplication between the provisions set out in this Part relating to the relocation or removal of apparatus (including but not limited to the payment of costs and expenses relating to such relocation or removal of apparatus) and the provisions of any existing easements rights agreements or licences granted, used, enjoyed or exercised by the protected person as of right or otherwise in relation to the apparatus then the provisions of this Part prevail.

Facilities and rights for alternative apparatus

38

  • (1) Where, in accordance with the provisions of this Part, the undertaker affords to the protected person facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights shall be granted upon such terms and conditions as may be agreed between the undertaker and the protected person and shall be no less favourable on the whole to the protected person than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless agreed by the protected person.
  • (2) If the facilities and rights to be afforded by the undertaker and agreed with the protected person under sub-paragraph (1) in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to the protected person than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject in the matter shall be referred to arbitration and, the arbitrator shall make such provision for the payment of compensation by the undertaker to that protected person as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained apparatus: protection

39

  • (1) Not less than 56 days before the commencement of any works authorised by this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 37(2) or otherwise, the undertaker shall submit to the protected person a plan and a ground monitoring scheme and seek from the protected person details of the underground extent of any electricity tower foundations.
  • (2) In relation to works which will or may be (i) situated on, over, under or within 15m measured in any direction of, any apparatus; or (ii) involve embankment works within 10m of any apparatus; or (iii) involve works within 10m of the outermost edge of any tower foundations, the plan to be submitted to the protected person under sub-paragraph (1) shall be detailed including a method statement and describing—
  • (a) the exact position of the works;
  • (b) the level at which these are proposed to be constructed or renewed;
  • (c) the manner of their construction or renewal including details of excavation and positioning of plant;
  • (d) the position of all apparatus;
  • (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus;
  • (f) intended maintenance regimes;
  • (g) an assessment of risks of rise of earth issues;
  • (h) details of clearance to pylon foundations;
  • (i) demonstration that pylon foundations will not be affected prior to, during and after construction; and
  • (j) a written management plan for high voltage hazard during construction.
  • (3) The undertaker shall not commence any works to which sub-paragraph (2) applies until the protected person has given written approval of the plan so submitted.
  • (4) Any approval of the protected person required under sub-paragraph (2)—
  • (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraph (6);
  • (b) shall not be unreasonably withheld.
  • (5) In relation to a work to which sub-paragraph (2) applies, the protected person may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its system against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
  • (6) Works executed under this Order shall be executed only in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (5), as amended from time to time by agreement between the undertaker and the protected person and in accordance with such reasonable requirements as may be made in accordance with this sub-paragraph by the protected person for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the protected person shall be entitled to watch and inspect the execution of those works.
  • (7) Where the protected person requires any protective works to be carried out either themselves or by the undertaker (whether of a temporary or permanent nature) such protective works shall be carried out to the protected persons’ satisfaction prior to the commencement of any authorised development (or any relevant part thereof) and the protected persons shall give 56 days’ notice of such works from the date of submission of a plan in line with sub-paragraph (1) or (5) (except in an emergency).
  • (8) Nothing in this paragraph shall preclude the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
  • (9) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it shall give to the protected person notice as soon as is reasonably practicable and a plan of those works and shall—
  • (a) comply with sub-paragraphs (6) and (7) insofar as is reasonably practicable in the circumstances; and
  • (b) comply with sub-paragraph (11) at all times.
  • (10) At all times when carrying out any works authorised under the Order comply with National Grid’s policies for development near over headlines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”.
  • (11) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development the undertaker shall implement an appropriate ground mitigation scheme save that the protected person retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 40.

Expenses

40

  • (1) Subject to the following provisions of this paragraph, the undertaker shall pay to the protected person on demand all charges, costs and expenses reasonably anticipated or incurred by that protected person in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in this Schedule including without limitation—
  • (a) any costs reasonably incurred or compensation properly paid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation in the event that the undertaker elects to use compulsory purchase powers to acquire any necessary rights under paragraph 37(3) all costs incurred as a result of such action;
  • (b) the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
  • (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
  • (d) the approval of plans;
  • (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
  • (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part.
  • (2) There shall be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or in default of agreement settled by arbitration in accordance with article 50 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the protected person by virtue of sub-paragraph (1) shall be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type of operations, capacity, dimensions or place at the existing depth in which case full costs shall be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus shall not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole shall be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to the protected person in respect of works by virtue of sub-paragraph (1) shall, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the protected person any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.

Indemnity

41

  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works authorised by this Part or in consequence of the construction, use, maintenance or failure of any of the authorised development by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by it) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of the protected person, or there is any interruption in any service provided, or in the supply of any goods, by the protected person, or the protected person becomes liable to pay any amount to any third party, the undertaker shall—
  • (a) bear and pay on demand the cost reasonably incurred by the protected person in making good such damage or restoring the supply; and
  • (b) indemnify the protected person for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from the protected person, by reason or in consequence of any such damage or interruption or the protected person becoming liable to any third party as aforesaid.
  • (2) The fact that any act or thing may have been done by the protected person on behalf of the undertaker or in accordance with a plan approved by the protected person or in accordance with any requirement of the protected person or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).
  • (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the neglect or default of the protected person, its officers, servants, contractors or agents.
  • (4) The protected person shall give the undertaker reasonable notice of any such claim or demand and no settlement or compromise shall be made without first consulting the undertaker and considering its representations.

Enactments and agreements

42

Nothing in this Part affects the provisions of any enactment or agreement regulating the relations between the undertaker and the protected person in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Co-operation

43

Where in consequence of the proposed construction of any of the authorised development, the undertaker or the protected person requires the removal of apparatus under paragraph 37(2) or the protected person makes requirements for the protection or alteration of apparatus under paragraph 39, the undertaker shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the protected person’s undertaking and the protected person shall use its best endeavours to co-operate with the undertaker for that purpose.

Access

44

If in consequence of the agreement reached in accordance with paragraph 36 or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker shall provide such alternative means of access to such apparatus as will enable the protected person to maintain or use the apparatus no less effectively than was possible before such obstruction.

Arbitration

45

Save for differences or disputes arising under paragraphs 37(2), 37(4), 38(1) and 39 any difference or dispute arising between the undertaker and the protected person under this Part shall, unless otherwise agreed in writing between the undertaker and that protected person, be determined by arbitration in accordance with article 50 (arbitration).

PART 4 — For the protection of Western Power Distribution (South Wales) Plc

Application

46

For the protection of the persons referred to in this Part, the following provisions shall, unless otherwise agreed in writing between the protected person and the undertaker, have effect.

Interpretation

47

In this Part—

  • “alternative apparatus” means appropriate alternative apparatus to the satisfaction of the protected person to enable the protected person to fulfil its statutory functions in a manner no less efficient than previously;
  • “apparatus” means electric lines or electrical plant as defined in the Electricity Act 1989 belonging to or maintained by that protected person;
  • “authorised development” means the works set out in Parts 1A, 1B and 2 of Schedule 1 (authorised development, and ancillary and necessary works), and for the purposes of this Part includes the use and maintenance of the authorised development;
  • “commence” has the same meaning as in article 2 but for the purposes of this Schedule any works whatsoever which are near to or may affect apparatus of the protected person shall be included within that definition and for the avoidance of doubt this includes works for the diversion or laying of services and commencement shall be construed accordingly;
  • “functions” includes powers and duties;
  • “ground mitigation scheme” means a scheme approved by the protected person (such approval not to be unreasonably withheld or delayed) setting out the necessary measures (if any) for a ground subsidence event;
  • “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for the protected person’s approval a ground mitigation scheme;
  • “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
  • “maintain” and “maintenance” shall include the ability and right in relation to any apparatus or alternative apparatus of the protected person to construct, use, repair, alter, inspect, renew or remove the apparatus;

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.