- (8) If National Grid in accordance with sub-paragraph (5) or (7) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 41 to 43 and 46 to 48 apply as if the removal of the apparatus had been required by the undertaker under paragraph 47(2).
- (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the authorised works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (10) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must—
- (a) comply with sub-paragraphs (5), (6) and (7) in so far as is reasonably practicable in the circumstances; and
- (b) comply with sub-paragraph (11) at all times.
- (11) At all times when carrying out any works authorised under the Order National Grid must comply with National Grid’s policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Grid, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW22” and HSE’s “HS(~G)47 Avoiding Danger from underground services”.
- (12) As soon as reasonably practicable after any ground subsidence event attributable to the authorised development the undertaker must implement an appropriate ground mitigation scheme except that National Grid retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 51.
Retained apparatus: protection for electricity undertakers
50
- (1) Not less than 56 days before the commencement of any authorised works that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 47(2) or otherwise, the undertaker must submit to National Grid a plan of the works to be executed and seek from National Grid details of the underground extent of their electricity tower foundations.
- (2) In relation to works which will or may be situated on, over, under or within—
- (a) 15 metres[^f00058] measured in any direction of any apparatus; or
- (b) involve embankment works within 15 metres of any apparatus,
the plan to be submitted to National Grid under sub-paragraph (1) must include a method statement and describe—
- (i) the exact position of the works;
- (ii) the level at which these are proposed to be constructed or renewed;
- (iii) the manner of their construction or renewal including details of excavation, positioning of plant;
- (iv) the position of all apparatus;
- (v) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and
- (vi) any intended maintenance regimes.
- (3) In relation to any works which will or may be situated on, over, under or within 10 metres of any part of the foundations of an electricity tower or between any two or more electricity towers, the plan to be submitted under sub-paragraph (1) must, in addition to the matters set out in sub-paragraph (2)(i) to (2)(vi), include a method statement describing—
- (a) details of any cable trench design including route, dimensions, clearance to pylon foundations;
- (b) how pylon foundations will not be affected prior to, during and post construction;
- (c) details of load bearing capacities of trenches;
- (d) details of cable installation methodology including access arrangements, jointing bays and backfill methodology;
- (e) a written management plan for high voltage hazard during construction and ongoing maintenance of the cable route;
- (f) written details of the operations and maintenance regime for the cable, including frequency and method of access;
- (g) assessment of earth rise potential if reasonably required by National Grid’s engineers; and
- (h) how trench bearing capacity is to be designed to 26 tonnes to take the weight of overhead line construction traffic.
- (4) The undertaker must not commence any works to which sub-paragraph (2) or (3) apply until National Grid has given written approval of the plan so submitted.
- (5) Any approval of National Grid required under sub-paragraph (4)—
- (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (6) or (8); and,
- (b) must not be unreasonably withheld.
- (6) In relation to any work to which sub-paragraph (2) or (3) apply, National Grid may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing its apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
- (7) Works to which this paragraph applies must only be executed in accordance with the plan, submitted under sub-paragraph (1) or as relevant sub-paragraph (10), as approved or as amended from time to time by agreement between the undertaker and National Grid and in accordance with such reasonable requirements as may be made in accordance with sub-paragraphs (6) or (8) by National Grid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and National Grid is entitled to watch and inspect the execution of those works.
- (8) Where National Grid requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved under this paragraph, must be carried out to National Grid’s satisfaction prior to the commencement of any authorised works (or any relevant part of them) for which protective works are required and National Grid must give 56 days’ notice of such protective works from the date of submission of a plan under this paragraph (except in an emergency).
- (9) If National Grid in accordance with sub-paragraph (6) or (8) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 41 to 43 and 46 to 48 apply as if the removal of the apparatus had been required by the undertaker under paragraph 47(2).
- (10) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the authorised works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (11) The undertaker is not required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to National Grid notice as soon as is reasonably practicable and a plan of those works and must—
- (a) comply with sub-paragraphs (6), (7) and (8) in so far as is reasonably practicable in the circumstances; and
- (b) comply with sub-paragraph (12) at all times.
- (12) At all times when carrying out any works authorised under the Order, the undertaker must comply with National Grid’s policies for development near overhead lines EN43-8 and HSE’s guidance note 6 “Avoidance of Danger from Overhead Lines”.
Expenses
51
- (1) Subject to the following provisions of this paragraph, the undertaker must pay to National Grid on demand all charges, costs and expenses reasonably anticipated or incurred by National Grid in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or the construction of any new or alternative apparatus which may be required in consequence of the execution of any authorised works as are referred to in this Part of this Schedule including without limitation—
- (a) any costs reasonably incurred by or compensation properly paid by National Grid in connection with the acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs incurred by National Grid as a consequence of National Grid—
- (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 47(3); or
- (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting National Grid;
- (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
- (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
- (d) the approval of plans;
- (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works; and
- (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any such works referred to in this Part of this Schedule.
- (2) The value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus will be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to National Grid by virtue of sub-paragraph (1) will be reduced by the amount of that excess except where it is not possible in the circumstances to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs are to be borne by the undertaker.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to National Grid in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on National Grid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, must be reduced by the amount which represents that benefit.
Indemnity
52
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any such works authorised by this Part of this Schedule or in consequence of the construction, use, maintenance or failure of any of the authorised works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by the undertaker) in the course of carrying out such works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the authorised works) or property of National Grid, or there is any interruption in any service provided, or in the supply of any goods, by National Grid, or National Grid becomes liable to pay any amount to any third party, the undertaker must—
- (a) bear and pay on demand the cost reasonably incurred by National Grid in making good such damage or restoring the supply; and
- (b) indemnify National Grid for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from National Grid, by reason or in consequence of any such damage or interruption or National Grid becoming liable to any third party as aforesaid other than arising from any default of National Grid.
- (2) The fact that any act or thing may have been done by National Grid on behalf of the undertaker or in accordance with a plan approved by National Grid or in accordance with any requirement of National Grid or under its supervision does not (unless sub-paragraph (3) applies), excuse the undertaker from liability under the provisions of sub-paragraph (1) unless National Grid fails to carry out and execute the works properly with due care and attention and in a skilful and professional manner or in a manner that does not accord with the approved plan.
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker in respect of—
- (a) any damage or interruption to the extent that it is attributable to the neglect or default of National Grid, its officers, servants, contractors or agents; and
- (b) any authorised works or any other works authorised by this Part of this Schedule carried out by National Grid as an assignee, transferee or lessee of the undertaker with the benefit of the Order in accordance with section 156 of the 2008 Act or article 8 (consent to transfer benefit of the Order) subject to the condition that once such works become apparatus (“new apparatus”), any authorised works yet to be executed and not falling within this sub-section are to be subject to the full terms of this Part of this Schedule including this paragraph.
- (4) National Grid must give the undertaker reasonable notice of any such third party claim or demand and no settlement or compromise, unless payment is required in connection with a statutory compensation scheme, is to be made without first consulting the undertaker and considering their representations.
Enactments and agreements
53
Except to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between National Grid and the undertaker, nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and National Grid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
Co-operation
54
- (1) Where in consequence of the proposed construction of any of the authorised works, the undertaker or National Grid requires the removal of apparatus under paragraph 47(2) or National Grid makes requirements for the protection or alteration of apparatus under paragraph 49 or 50, the undertaker must use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of National Grid’s undertaking and National Grid must use its best endeavours to co-operate with the undertaker for that purpose.
- (2) For the avoidance of doubt whenever National Grid’s consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed.
Access
55
If in consequence of the agreement reached in accordance with paragraph 46(1) or the powers granted under this Order the access to any apparatus is materially obstructed, the undertaker must provide such alternative means of access to such apparatus as will enable National Grid to maintain or use the apparatus no less effectively than was possible before such obstruction.
Arbitration
56
Except for differences or disputes arising under paragraph 47(2), 47(4), 48(1), 49, 50 and 52(4) any difference or dispute arising between the undertaker and National Grid under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and National Grid, be determined by arbitration in accordance with article 42 (arbitration).
PART 5 — FOR THE PROTECTION OF UNITED KINGDOM OIL PIPELINES LIMITED AND WEST LONDON PIPELINE AND STORAGE LIMITED
57
For the protection of the protected persons referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the protected person concerned.
58
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the protected person in question to fulfil its functions in relation to transporting oil, gas and fuel in a manner no less efficient than previously;
- “apparatus” means—in the case of a gas or other fuel undertaker, any mains, pipes, pipelines or other apparatus belonging to or maintained by a transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986[^f00059], the Pipe-lines Act 1962[^f00060] and the Pipelines Safety Regulations 1996[^f00061] for the purposes of such supply; andin the case of West London Pipeline and Storage any oil apparatus, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “oil apparatus” means any pipe-line, apparatus and works as described in section 65(2) (meaning of “pipe-line”) of the Pipe-lines Act 1962[^f00062] and all protective wrappings, sleeves and slabs, together with ancillary cables, protection equipment and markers; and such legal interest, and benefit of property rights and covenants as are vested in United Kingdom Oil Pipelines Limited or West London Pipeline and Storage Limited in respect of such items;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed;
- “protected person” means—the United Kingdom Oil Pipelines Limited, company number 09416180, whose registered office is 5-7, Alexandra Road, Hemel Hempstead, Hertfordshire, HP2 5BS and its successors in title and function; andWest London Pipeline and Storage Limited, company number 01918796, whose registered office is 5-7, Alexandra Road, Hemel Hempstead, Hertfordshire, HP2 5BS and its successors in title and function;for the area of the authorised development, and in relation to any apparatus, means the protected person to whom it belongs or by whom it is maintained.
On street apparatus
59
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the protected person are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up streets
60
- (1) Where any street is stopped up under article 13 (permanent stopping up of streets), any protected person whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to the protected person legal easements reasonably satisfactory to the protected person in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the protected person to require the removal of that apparatus under paragraph 63 or the power of the undertaker to carry out works under paragraph 65.
- (2) Regardless of the temporary stopping up or diversion of any highway under the powers conferred by article 14 (temporary stopping up of streets), a protected person is at liberty at all times to take all necessary access across any such stopped up highway and to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.
Protective works to buildings
61
The undertaker, in the case of the powers conferred by article 18 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land
62
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
63
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the protected person’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a protected person to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the protected person in question in accordance with sub-paragraphs (2) to (7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the protected person in question 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the protected person the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed the protected person must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use all reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the protected person in question and the undertaker both acting reasonably or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (5) The protected person in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration), and after the grant to the protected person of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the protected person in question that the undertaker intends to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the protected person, can if reasonable in the circumstances be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the protected person.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within—
- (a) 300 millimetres of apparatus other than oil, gas or fuel apparatus; and
- (b) 3000 millimetres of oil, gas or other fuel apparatus.
Facilities and rights for alternative apparatus
64
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a protected person facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the protected person both acting reasonably in question or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus the arbitrator must—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the undertaker or the traffic on the highway;
- (b) give effect to all reasonable requirements of the protected person for ensuring the safety and efficient operation of the relevant apparatus and alternative apparatus; and
- (c) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the protected person in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that protected person as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
65
- (1) Not less than 56 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 63(2), the undertaker must submit to the protected person in question a plan of the works to be executed.
- (2) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the protected person for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the protected person is entitled to watch and inspect the execution of those works and they must be carried out to the reasonable satisfaction of the protected person.
- (3) Any requirements made by a protected person under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (4) If a protected person in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 57 to 59 and 62 to 64 apply as if the removal of the apparatus had been required by the undertaker under paragraph 63(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of any works, a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give to the protected person in question notice as soon as is reasonably practicable and a plan of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (1) in so far as is reasonably practicable in the circumstances.
Expenses and costs
66
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a protected person all expenses reasonably incurred by that protected person in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 63(2) or 63(4), including legal and professional costs and any costs reasonably incurred in connection with the acquisition of rights under paragraph 63(3), and in watching and inspecting the execution of works under paragraph 65(2) and in making reasonable requirements under paragraph 65(3).
- (2) The value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the protected person in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a protected person in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the protected person any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
67
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of the authorised development or any such works referred to in paragraphs 61, 63(2), or 65(1), or by reason of any subsidence resulting from such development or works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a protected person, or there is any interruption in any service provided or of any access to any apparatus, or in the supply of any goods, by any protected person, the undertaker must—
- (a) bear and pay the cost reasonably incurred by that protected person in making good such damage or restoring the supply;
- (b) make reasonable compensation to that protected person for any other expenses, loss, damages, penalty or costs incurred by the protected person, by reason or in consequence of any such damage or interruption; and
- (c) make reasonable compensation to that protected person in respect of any claim or demand made by a third party in respect of any damage by reason or in consequence of the construction of the authorised development or any such works referred to in paragraphs 61, 63(2), or 65(1).
- (2) The fact that any act or thing may have been done by a protected person on behalf of the undertaker or in accordance with a plan approved by a protected person or in accordance with any requirement of a protected person or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a protected person, its officers, servants, contractors or agents.
- (4) A protected person must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker such consent not to be unreasonably withheld or delayed.
Co-operation
68
Where in consequence of the proposed construction of any of the authorised development, the undertaker or a protected person requires the removal of apparatus under paragraph 63(2) or a protected person makes requirements for the protection or alteration of apparatus under paragraph 65, the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the protected person’s undertaking and each protected person must use its best endeavours to co-operate with the undertaker for that purpose.
69
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a protected person in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 6 — FOR THE PROTECTION OF THE ENVIRONMENT AGENCY
70
- (1) The following provisions apply for the protection of the Agency unless otherwise agreed in writing between the undertaker and the Agency.
- (2) In this Part of this Schedule—
- “the Agency” means the Environment Agency;
- “emergency” means a situation which—is unexpected, in that there is little or no prior warning, or aspects of the event could not have reasonably been predicted in advance;is a serious event presenting a risk of harm or damage to people, property or the environment; andrequires a need for urgent action, in that immediate action is required to address the risk of harm, repair or prevent a worsening of the situation;
- “Flood Protection Work” means work to or creation of any watercourse, any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment, outfall or other structure, or any appliance, constructed or used for land drainage or flood defence; and
- “relevant navigation” has the same meaning as in article 16 (powers in relation to relevant navigations or watercourses).
71
- (1) Where, in the exercise of the powers conferred by this Order, the undertaker proposes to interfere with or obstruct access by the Agency to a relevant navigation or other main river, it must give the Agency 56 days’ written notice of that requirement.
- (2) .Except in cases of emergency where the undertaker interferes with or obstructs access by the Agency to a relevant navigation or other main river and it is not possible for the undertaker to give the Agency the notice required under sub-paragraph (1), a suitable alternative access must be provided prior to and for the duration of any such interference.
72
If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest of the Agency in any land or proposes to interfere with, or remove, any of the Agency’s apparatus, it must give the Agency 56 days’ written notice before any such interest is acquired or any apparatus is interfered with or removed.
73
The undertaker must maintain, inspect and retain any Flood Protection Work comprised in or affected by the authorised development in accordance with a retention, inspection and maintenance plan to be prepared by the undertaker as part of the flood compensation scheme to be approved under requirement 23 in Part 1 (requirements) of Schedule 2.
74
The undertaker must allow the Agency reasonable access to any Flood Protection Work comprised in or affected by the authorised development at all reasonable times for the purposes of ascertaining whether the undertaker is complying with the provisions of paragraph 73.
75
- (1) Where maintenance of any Flood Protection Work specified in the approved retention, inspection and maintenance plan is not carried out to the reasonable satisfaction of the Agency, the Agency may by notice require the undertaker to carry out the maintenance in question to such extent as the Agency reasonably requires.
- (2) If, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any Flood Protection Work is served under sub-paragraph (1) the undertaker has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure reasonably incurred by it in so doing from the undertaker.
- (3) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (1), the Agency must not, except in a case of urgency, exercise the powers of sub-paragraph (2) until the dispute has been finally determined.
76
If by reason of the construction of the authorised development or of the failure of any such works the efficiency of any Flood Protection Work is impaired, or any such Flood Protection Work is otherwise damaged, so as to require remedial action, such impairment or damage must be made good by the undertaker to the reasonable satisfaction of the Agency and if the undertaker fails to do so, the Agency may make good the same and recover the expenditure reasonably incurred by it in doing so from the undertaker.
77
The undertaker must indemnify the Agency in respect of all costs, charges and expenses which it may reasonably incur or which it may sustain—
- (a) in the examination or approval of plans or other matter under this Part of this Schedule; and
- (b) in the inspection of the construction of any Flood Protection Work required by the Agency under this Part of this Schedule.
78
The fact that any work or thing has been executed or done in accordance with a plan approved or deemed to have been approved by the Agency, or to its satisfaction, does not (in the absence of negligence on the part of the Agency, its officers, contractors or agents) relieve the undertaker from any liability under the provisions of this Part of this Schedule.
79
Any dispute arising between the undertaker and the Agency under this Part of this Schedule is to be determined in accordance with article 42 (arbitration) of the Order.
PART 7 — FOR THE PROTECTION OF THAMES WATER
Access to Slough Sewage Treatment Works
80
- (1) Except where it has complied with sub-paragraph (2), the undertaker must not in the exercise of the powers conferred by this Order unreasonably prevent Thames Water’s access via Wood Lane to the Slough Sewage Treatment Works.
- (2) Not less than 56 days prior to undertaking any works in connection with Work No. 14c (including traffic management measures, diversions, road closures and stopping up) that would affect Thames Water’s access the undertaker must submit to Thames Water details of the proposed location and duration of those works and must comply with its reasonable requirements for ensuring its continued access to the Slough Sewage Treatment Works.
Iver South Sludge Dewatering Centre
81
The undertaker must not in the exercise of the powers conferred by this Order do any works to the security fence to the Iver South Sludge Dewatering Centre.
82
- (1) The undertaker must not in the exercise of the powers conferred by this Order unreasonably prevent Thames Water’s access over plots 26-11 and 26-12 shown on the land plans and listed in the book of reference.
- (2) Not less than 56 days prior to undertaking any works in connection with Work No. 25 (including traffic management measures, diversions, road closures and stopping up) that would affect Thames Water’s access over plots 26-11 and 26-12 the undertaker must submit to Thames Water details of the proposed location and duration of those works and must comply with its reasonable requirements for ensuring its continued access over plots 26-11 and 26-12.
PART 8 — FOR THE PROTECTION OF SOUTH EAST WATER
83
For the protection of the protected persons referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the protected person concerned.
84
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the protected person in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means mains, pipes, well, boreholes, tanks, service reservoirs, pumping stations (and any accessories to those items) or other apparatus, structure or treatment works belonging to or maintained by that undertaker for the purposes of water supply;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed;
- “protected person” means South East Water Limited, (company number 02679874), whose registered office is at Rocfort Road, Snodland, Kent, ME6 5AH, for the area of the authorised development, and in relation to any apparatus, means the protected person to whom it belongs or by whom it is maintained.
On street apparatus
85
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the protected person are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up streets
86
- (1) Where any street is stopped up under article 13 (permanent stopping up of streets), any protected person whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to the protected person legal easements reasonably satisfactory to the protected person in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the protected person to require the removal of that apparatus under paragraph 89 or the power of the undertaker to carry out works under paragraph 91.
- (2) Regardless of the temporary stopping up or diversion of any highway under the powers conferred by article 14 (temporary stopping up of streets), a protected person is at liberty at all times to take all necessary access across any such stopped up highway and to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.
Protective works to buildings
87
The undertaker, in the case of the powers conferred by article 18 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land
88
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
89
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the protected person’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a protected person to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the protected person in question in accordance with sub-paragraphs (2) to (7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the protected person in question 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the protected person the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed the protected person must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the protected person in question and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (5) The protected person in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration), and after the grant to the protected person of any such facilities and rights as are referred to in sub-paragraphs (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the protected person in question that the undertaker intends to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the protected person, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the protected person.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within—
- (a) 300 millimetres of apparatus other than oil apparatus; and
- (b) 3000 millimetres of oil apparatus.
Facilities and rights for alternative apparatus
90
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a protected person facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the protected person in question or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus the arbitrator must—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the undertaker or the traffic on the highway; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the protected person in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that protected person as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
91
- (1) Not less than 56 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 89(2), the undertaker must submit to the protected person in question a plan of the works to be executed together with such method statement(s) as are sufficient to allow the protected person acting reasonably to assess the potential impact of the works on the performance of its functions.
- (2) Those works must be executed only in accordance with the plan and method statement(s) submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the protected person for the alteration or otherwise for the protection of the apparatus and of its operation, or for securing access to it, and the protected person is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by a protected person under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (4) If a protected person in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 83 to 85 and 88 to 90 apply as if the removal of the apparatus had been required by the undertaker under paragraph 89(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give to the protected person in question notice as soon as is reasonably practicable and a plan of those works and sufficient method statement(s) as soon as reasonably practicable subsequently and must comply with sub-paragraph (1) in so far as is reasonably practicable in the circumstances.
Expenses and costs
92
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a protected person all expenses reasonably incurred by that protected person in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 89(2), including any costs reasonably incurred in connection with the acquisition of rights under paragraph 89(3), and in watching and inspecting the execution of works under paragraph 91(2) and in making reasonable requirements under paragraph 91(3).
- (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the protected person in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a protected person in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the protected person any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
93
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of the authorised development or any such works referred to in paragraphs 87, 89(2), or 91(1), or by reason of any subsidence resulting from such development or works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a protected person, or there is any interruption in any service provided or of any access to any apparatus, or in the supply of any goods or services by any protected person or the performance of that protected person’s functions, or any disruption to the normal operation of the apparatus of a protected person resulting in an increase in the costs incurred by that protected person in performing its functions or in any loss, damages or penalty, the undertaker must—
- (a) bear and pay the cost reasonably incurred by that protected person in making good such damage or restoring the supply; and
- (b) make reasonable compensation to that protected person for any other expenses, loss, damages, penalty or costs incurred by the undertaker, by reason or in consequence of any such damage, interruption or disruption.
- (2) The fact that any act or thing may have been done by a protected person on behalf of the undertaker or in accordance with a plan approved by a protected person or in accordance with any requirement of a protected person or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a protected person, its officers, servants, contractors or agents.
- (4) A protected person must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
Co-operation
94
Where in consequence of the proposed construction of any of the authorised development, the undertaker or a protected person requires the removal of apparatus under paragraph 89(2) or a protected person makes requirements for the protection or alteration of apparatus under paragraph 91, the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the protected person’s undertaking and each protected person must use its best endeavours to co-operate with the undertaker for that purpose.
95
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a protected person in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 9 — FOR THE PROTECTION OF HEATHROW AIRPORT LIMITED
96
The following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and Heathrow Airport Limited.
97
In this Part of this Schedule—
- “Heathrow Airport” means Heathrow Airport Limited (Company number: 01991017) and Heathrow Airport Holdings Limited (Company number 05757208), both of whose registered offices are at Compass Centre, Nelson Road, Hounslow, London TW6 2GW;
- “the Heathrow Express railway” means the railway from Heathrow airport to the east of the tunnel portal, just west of the junction with the Railway at Airport Junction, authorised by the Heathrow Express Railway Act 1991[^f00063], the Heathrow Express Railway (No. 2) Act 1991[^f00064], and the Heathrow Express Railway Extension Order 2002[^f00065], including the railway stations and all other works, apparatuses and conveniences constructed or provided by Heathrow Airport in connection with, or for the purposes of, that railway; and
- “Heathrow Airport property” means any land belonging to Heathrow Airport and—any works, apparatus and equipment belonging to Heathrow Airport or connected with the operational of the Heathrow Express railway; andany easement or other property interest held or used by Heathrow Airport including those easements or property or interests for or connected with the purposes of the Heathrow Express railway or its works, apparatus or equipment.
98
- (1) The undertaker must not exercise the powers conferred by articles 19 (authority to survey and investigate land), 20 (compulsory acquisition of land), 22 (compulsory acquisition of rights), 23 (private rights over land), 25 (acquisition of subsoil or air-space only), 27 (rights under or over streets), 28 (temporary use of land for carrying out the authorised development), 29 (temporary use of land for maintaining the authorised development), 30 (statutory undertakers), or the powers conferred by section 11(3) (powers of entry) of the 1965 Act in respect of any Heathrow Airport property unless the exercise of such powers is with the consent of Heathrow Airport Limited.
- (2) The undertaker must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any Heathrow Airport property, unless preventing such access is with the consent of Heathrow Airport.
- (3) The undertaker must not under the powers conferred by this Order acquire or use, or acquire new rights over, any Heathrow Airport property except with the consent of Heathrow Airport.
- (4) Where Heathrow Airport is asked to give its consent or agreement under this paragraph, such consent or agreement must not be unreasonably withheld but may be given subject to reasonable conditions which may include the requirement to give indemnities or undertake protective works necessary to protect Heathrow Airport property.
99
Any difference or dispute arising between the undertaker and Heathrow Airport under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and Heathrow Airport, be determined by arbitration in accordance with article 42 (arbitration).
PART 10 — FOR THE PROTECTION OF SSE SERVICES PLC AND SOUTHERN ELECTRIC POWER DISTRIBUTION PLC
100
For the protection of the protected persons referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the protected person concerned.
101
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the protected person in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means electric lines or electrical plant (as defined in the Electricity Act 1989[^f00066]), belonging to or maintained by a protected person;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
- “protected person” means SSE Services plc (company number 02366879, whose registered office is at 55 Vastern Road, Reading, Berkshire, RG1 8BU) or Southern Electric Power Distribution plc (company number 04094290 whose registered office is at 55 Vastern Road, Reading, Berkshire, RG1 8BU).
On street apparatus
102
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the protected person are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Apparatus in stopped up streets
103
- (1) Where any street is stopped up under article 13 (permanent stopping up of streets), any protected person whose apparatus is in the street has the same powers and rights in respect of that apparatus as it enjoyed immediately before the stopping up and the undertaker must grant to the protected person legal easements reasonably satisfactory to the protected person in respect of such apparatus and access to it, but nothing in this paragraph affects any right of the undertaker or of the protected person to require the removal of that apparatus under paragraph 106 or the power of the undertaker to carry out works under paragraph 108.
- (2) Regardless of the temporary stopping up or diversion of any highway under the powers conferred by article 14 (temporary stopping up of streets), a protected person is at liberty at all times to take all necessary access across any such stopped up highway and to execute and do all such works and things in, upon or under any such highway as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the stopping up or diversion was in that highway.
Protective works to buildings
104
The undertaker, in the case of the powers conferred by article 18 (protective work to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus.
Acquisition of land
105
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
106
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the protected person’s apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of a protected person to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the protected person in question in accordance with sub-paragraphs (2) to(7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the protected person in question 56 days’ written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the protected person the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed the protected person must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed except that this obligation is not to extend to the requirement for the protected person to use its compulsory purchase powers to this end unless it elects to so do.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the protected person in question and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (5) The protected person in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration), and after the grant to the protected person of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the protected person in question that the undertaker intends to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of the undertaker, that work, instead of being executed by the protected person, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the protected person.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 6000 millimetres of apparatus, unless otherwise agreed between the undertaker and the protected person.
Facilities and rights for alternative apparatus
107
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to a protected person facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between the undertaker and the protected person in question or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus the arbitrator must—
- (a) give effect to all reasonable requirements of the undertaker for ensuring the safety and efficient operation of the authorised development and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of the undertaker or the traffic on the highway; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the protected person in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that protected person as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained apparatus
108
- (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 106(2), the undertaker must submit to the protected person in question a plan of the works to be executed.
- (2) Those works must be executed only in accordance with the plan submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the protected person for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the protected person is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by a protected person under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan under sub-paragraph (1) is submitted to it.
- (4) If a protected person in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 100 to 102 and 105 to 107 apply as if the removal of the apparatus had been required by the undertaker under paragraph 106(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan instead of the plan previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case must give, to the protected person in question, notice as soon as is reasonably practicable and a plan of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
Expenses and costs
109
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a protected person all expenses reasonably incurred by that protected person in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 106(2), including any costs reasonably incurred in connection with the acquisition of rights under paragraph 106(3), and in watching and inspecting the execution of works under paragraph 108(2) and in making reasonable requirements under paragraph 108(3).
- (2) The value of any apparatus removed under the provisions of this Part of this Schedule is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions at the election of the protected person; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is at the election of the protected person and is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the protected person in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
110
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of the authorised development or any such works referred to in paragraphs 104, 106(2) or 108(1), or by reason of any subsidence resulting from such development or works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a protected person, or there is any interruption in any service provided or of any access to any apparatus, or in the supply of any goods, by any protected person, the undertaker must—
- (a) bear and pay the cost reasonably incurred by that protected person in making good such damage or restoring the supply; and
- (b) make reasonable compensation to that protected person for any other expenses, loss, damages, penalty or costs incurred by the protected person,
by reason or in consequence of any such damage or interruption.
- (2) The fact that any act or thing may have been done by a protected person on behalf of the undertaker or in accordance with a plan approved by a protected person or in accordance with any requirement of a protected person or under its supervision does not, subject to sub-paragraph (3), excuse the undertaker from liability under the provisions of sub-paragraph (1).
- (3) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a protected person, its officers, servants, contractors or agents.
- (4) A protected person must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker who, if withholding such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (5) Any difference arising between the undertaker and the protected person under this Part of this Schedule must be referred to and settled by arbitration under article 42 (arbitration).
Co-operation
111
Where in consequence of the proposed construction of any of the authorised development, the undertaker or a protected person requires the removal of apparatus under paragraph 106(2) or a protected person makes requirements for the protection or alteration of apparatus under paragraph 108, the undertaker must use best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the authorised development and taking into account the need to ensure the safe and efficient operation of the protected person’s undertaking and each protected person must use its best endeavours to co-operate with the undertaker for that purpose.
112
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between the undertaker and a protected person in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
SCHEDULE 10 — DOCUMENTS SUBJECT TO CERTIFICATION
The land plans (Document Reference No. 2.2, dated January 2016)—
| (1) Application Document | (2) Drawing No. | (3) Revision No. | (4) Document Reference |
|---|---|---|---|
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Key Plan | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301410 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 1 of 31, Theale | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301379 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 2 of 31, Calcot | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301380 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 3 of 31, Reading Motorway Service Area | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301381 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 4 of 31, Pingewood | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301382 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 5 of 31, Reading International Business Park | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301383 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 6 of 31, Whitley | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301384 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 7 of 31, Lower Earley | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301385 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 8 of 31, River Loddon | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301386 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 9 of 31, Winnersh | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301387 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 10 of 31, Wokingham | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301388 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 11 of 31, Bill Hill | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301389 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 12 of 31, The Straight Mile | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301390 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 13 of 31, Hammond’s Wood | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301391 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 14 of 31, Beenham’s Heath | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301392 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 15 of 31, Littlefield Green | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301393 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 16 of 31, Paley Street | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301394 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 17 of 31, Holyport | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301395 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 18 of 31, Bray | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301396 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 19 of 31, Dorney Reach | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301397 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 20 of 31, Cippenham | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301398 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 21 of 31, Slough South | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301399 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 22 of 31, Chalvey | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301400 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 23 of 31, Myrke | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301401 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 24 of 31, Datchet | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301402 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 25 of 31, Brands Hill | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301403 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 26 of 31, Sutton | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301404 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 27 of 31, M4/M25 | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301405 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 28 of 31, West Drayton | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301406 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 29 of 31, Harlington | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301407 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 30 of 31, Cranford | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301408 |
| Volume 2.0: plans, drawing and sections - 2.2 Land Plans including Crown Land, Regulations 5(2)(i) and 5 (2)(n), Sheet 31 of 31, Heston | TR010019-2.2 | 5F | 514451-MUH-ML-ZZ-SK-LR-301409 |
The works plans (Document Reference No. 2.3, dated January 2016)—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.