The Southampton to London Pipeline Development Consent Order 2020

Type Statutory-Instrument
Publication 2020-10-07
State In force
Department Queen's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API
  • (11) Section 13 (refusal to give possession to the acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
  • (12) In this article “the maintenance period”, in relation to any part of the authorised development means the period of 5 years beginning with the date on which that part of the authorised development is brought into operational use, except where the authorised development is replacement or landscape planting where “the maintenance period” means the period of 5 years beginning with the date on which that part of the replacement or landscape planting is completed.

Crown rights

32
  • (1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and, in particular, nothing in this Order authorises the undertaker or any licensee to take, use, enter upon or in any manner interfere with any land or rights of any description (including any portion of the shore or bed of the sea or any river, channel, creek, bay or estuary)—
  • (a) belonging to Her Majesty in right of the Crown and forming part of the Crown Estate without the consent in writing of the Crown Estate Commissioners;
  • (b) belonging to Her Majesty in right of the Crown and not forming part of the Crown Estate without the consent in writing of the government department having the management of that land; or
  • (c) belonging to a government department or held in trust for Her Majesty for the purposes of a government department without the consent in writing of that government department.
  • (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of an interest in any Crown land (as defined in section 227 of the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.
  • (3) The authorised development must not commence until agreement has been secured with the Secretary of State for Justice for use of the Ministry of Justice land for the authorised development.
  • (4) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions and is deemed to have been given in writing where it is sent electronically.

Special category land

33
  • (1) So much of the special category land as may be required for the purposes of the exercising by the undertaker of the Order rights will be discharged from all rights, trusts and incidents to which it was previously subject, so far as their continuance would be inconsistent with the exercise of the Order rights.
  • (2) So far as the temporary use of land under either article 30 (temporary use of land for carrying out the authorised development) and article 31 (temporary use of land for maintaining the authorised development) is concerned, then the discharge in paragraph (1) is only for such time as any land required only temporarily is being used under either of those articles.
  • (3) In this article—
  • “Order rights” means rights and powers exercisable over the special category land by the undertaker under article 23 (compulsory acquisition of rights) and article 30 (temporary use of land for carrying out the authorised development);
  • “the special category land” means the land identified as forming part of a common, open space, or fuel or field allotment in the book of reference and on the plan entitled “special category land plan”; and
  • “the special category land plan” means the plan of that description set out in Schedule 11 (documents to be certified) and certified as the special category land plan by the Secretary of State for the purposes of this Order.

Statutory undertakers

34

Subject to the provisions of Schedule 9 (protective provisions) the undertaker may—

  • (a) acquire compulsorily the land belonging to statutory undertakers within the Order limits and described in the book of reference;
  • (b) acquire existing rights, create and acquire new rights and impose restrictive covenants over the land belonging to statutory undertakers within the Order limits and described in the book of reference;
  • (c) extinguish or suspend the rights of, or remove or reposition apparatus belonging to, statutory undertakers over or within the Order limits;
  • (d) construct the authorised development in such a way as to cross underneath or over apparatus belonging to statutory undertakers and other like bodies within the Order limits; and
  • (e) construct over existing apparatus belonging to statutory undertakers any necessary track or roadway (whether temporary or permanent) together with the right to maintain or remove the same, and install such service media under or over the existing apparatus needed in connection with the authorised development.

Recovery of costs of new connections

35
  • (1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 34 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
  • (2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 34, any person who is—
  • (a) the owner or occupier of premises the drains of which communicated with that sewer; or
  • (b) the owner of a private sewer which communicated with that sewer,

is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.

  • (3) This article does not have effect in relation to apparatus to which Part 3 (street works in England and Wales) of the 1991 Act applies.
  • (4) In this article—
  • “public communications provider” has the same meaning as in section 151(1) (interpretation of Chapter 1) of the Communications Act 2003[^f00053]; and
  • “public utility undertaker” means a gas, water, electricity or sewerage undertaker.

PART 6 — MISCELLANEOUS AND GENERAL

Disapplication of legislative provisions

36
  • (1) The following provisions do not apply in relation to the construction of any works or the carrying out of any operation required for the purpose of, or in connection with, the construction or maintenance of any part of the authorised development—
  • (a) the provisions of any byelaws made under, or having effect as if made under Schedule 25 (byelaw-making powers of the Authority) to the Water Resources Act 1991[^f00054];
  • (b) regulation 12 (requirement for an environmental permit) of the 2016 regulations[^f00055] in respect of a flood risk activity;
  • (c) section 23 (prohibition on obstructions etc. in watercourses) of the Land Drainage Act 1991[^f00056];
  • (d) section 32 (variation of awards) of the Land Drainage Act 1991;
  • (e) the provisions of any byelaws made under section 66 (powers to make byelaws) of the Land Drainage Act 1991;
  • (f) the provisions of the Basingstoke Canal Act 1778[^f00057] and the Basingstoke Canal Act 1793[^f00058];
  • (g) section 5 (control of grass verges, etc.) and section 13 (excavations near highways) of the Surrey Act 1985[^f00059];
  • (h) section 18 (open spaces and verges, etc., of housing estates), section 22 (prohibition of parking or camping on highway verges, etc.), section 28 (control of goods service areas) and section 34 (excavations near highways) of the Hampshire County Council Act 1972[^f00060];
  • (i) byelaw 3 (overnight parking), byelaw 7 (erection of structures), byelaw 9 (fires), byelaws 18 and 19 (protection of flower beds, trees, grass, etc), byelaw 20 (removal of substances), byelaw 27(b) (pollution of waterways), byelaw 27(c) (watercourses), byelaw 36 (metal detectors), byelaw 37(1) (fishing and protection of wildlife), byelaw 41 (gates) and byelaw 42(c) (obstruction) of the Rushmoor Borough Council Pleasure Grounds, Public Walks and Open Spaces Byelaws 2001;
  • (j) byelaw 4 (use of motorcycles, etc) of the Rushmoor Borough Council Byelaws for Good Rule and Government 2001;
  • (k) byelaw 3(i), byelaw 6, byelaw 8(i), byelaw 9, byelaw 14(ii) and byelaw 15 of the Byelaws made under sections 12 and 15 of the Open Spaces Act 1906 by the Council of the Borough of Rushmoor with respect to Southwood Golf Course Farnborough in Hampshire 1983;
  • (l) byelaw 3 (opening times), byelaw 4(2) (protection of structures and plants), byelaw 5 (unauthorised erection of structures), byelaw 8 (protection of wildlife), byelaw 9 (gates), byelaw 11(1) (fires), byelaw 26 (pollution) and byelaw 32(c) (obstruction) of the Spelthorne Borough Council Byelaws for Pleasure Grounds, Public Walks and Open Spaces 2009;
  • (m) byelaw 2 (opening times), byelaw 4 (overnight parking), byelaw 9 (erection of structures), byelaws 16 and 17 (protection of flower beds, trees, grass, etc), byelaw 18 (removal of substances), byelaw 32(b) (pollution of waterways), byelaw 32(c) (watercourses), byelaw 39 (metal detectors), byelaw 40(1) (fires), byelaw 42(1) (fishing and protection of wildlife); byelaw 46 (gates) and byelaw 47(c) (obstruction) of the Runnymede Borough Council Byelaws for Pleasure Grounds, Public Walks and Open Spaces 1997;
  • (n) byelaw 6 (obstruction to flow), byelaw 8(2) (notice to remove growth in or on banks and river control works) and byelaw 17 (deposit on banks etc) of the Environment Agency Southern Region Land Drainage and Sea Defence Byelaws 1982 (as amended); and
  • (o) byelaw 4 (control of structures, pipes and cables), byelaw 5 (control of excavations and removal of turf, etc.), byelaw 6 (Control of dredging and removal of shingle etc.), byelaw 7 (endangering stability of the bank), byelaw 8 (interference with banks etc.), byelaw 9 (deposit of material on banks), byelaw 13 (obstruction to flow), byelaw 14 (planting of trees etc.), byelaw 16 (obstruction of areas liable to flood) and byelaw 17 (river control works) of the Thames Region Land Drainage Byelaws 1981 (as amended).
  • (2) The provisions of the Neighbourhood Planning Act 2017[^f00061], insofar as they relate to temporary possession of land under article 30 (temporary use of land for carrying out the authorised development) and article 31 (temporary use of land for maintaining the authorised development) of this Order, do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development and, within the maintenance period defined in article 31(12) (temporary use of land for maintaining the authorised development) any maintenance of any part of the authorised development.
  • (3) Notwithstanding the provisions of section 208 of the 2008 Act, for the purposes of regulation 6 of the Community Infrastructure Levy Regulations 2010[^f00062] any building comprised in the authorised development must be deemed to be—
  • (a) a building into which people do not normally go; or
  • (b) a building into which people go only intermittently for the purpose of inspecting or maintaining fixed plant or machinery.

Removal of human remains

37
  • (1) In this article “the specified land” means the land within the Order limits which the undertaker reasonably considers may contain human remains.
  • (2) Before the undertaker carries out any development or works within the Order limits which will or may disturb any human remains in the specified land it must remove those human remains from the specified land, or cause them to be removed, in accordance with the following provisions of this article.
  • (3) Subjection to paragraph (12), before any such remains are removed from the specified land the undertaker must give notice of the intended removal, describing the specified land and stating the general effect of the following provisions of this article, by—
  • (a) publishing a notice once in each of two successive weeks in a newspaper circulating in the area of the specified land; and
  • (b) displaying a notice in a conspicuous place on or near to the specified land.
  • (4) As soon as reasonably practicable after the first publication of a notice under paragraph (3) the undertaker must send a copy of the notice to the relevant planning authority.
  • (5) At any time within 56 days after the first publication of a notice under paragraph (3) any person who is a personal representative or relative of any deceased person whose remains are interred in the specified land may give notice in writing to the undertaker of that person’s intention to undertake the removal of the remains.
  • (6) Where a person has given notice under paragraph (5), and the remains in question can be identified, that person may cause such remains to be—
  • (a) removed and re-interred in any burial ground or cemetery in which burials may legally take place; or
  • (b) removed to, and cremated in, any crematorium,

and that person must, as soon as reasonably practicable after such re-interment or cremation, provide to the undertaker a certificate for the purpose of enabling compliance with paragraph (11).

  • (7) If the undertaker is not satisfied that any person giving notice under paragraph (5) is the personal representative or relative as that person claims to be, or that the remains in question can be identified, the question is to be determined on the application of either party in a summary manner by the county court, and the court may make an order specifying who must remove the remains and as to the payment of the costs of the application.
  • (8) The undertaker must pay the reasonable expenses of removing and re-interring or cremating the remains of any deceased person under this article.
  • (9) If—
  • (a) within the period of 56 days referred to in paragraph (5) no notice under that paragraph has been given to the undertaker in respect of any remains in the specified land; or
  • (b) such notice is given and no application is made under paragraph (7) within 56 days after the giving of the notice but the person who gave the notice fails to remove the remains within a further period of 56 days; or
  • (c) within 56 days after any order is made by the county court under paragraph (7) any person, other than the undertaker, specified in the order fails to remove the remains; or
  • (d) it is determined that the remains to which any such notice relates cannot be identified,

subject to paragraph (10) the undertaker must remove the remains and cause them to be re-interred in such burial ground or cemetery in which burials may legally take place as the undertaker thinks suitable for the purpose; and, so far as possible, remains from individual graves must be reinterred in individual containers which must be identifiable by a record prepared with reference to the original position of burial of the remains that they contain.

  • (10) If the undertaker is satisfied that any person giving notice under paragraph (5) is the personal representative or relative as that person claims to be and that the remains in question can be identified, but that person does not remove the remains, the undertaker must comply with any reasonable request that person may make in relation to the removal and re-interment or cremation of the remains.
  • (11) On the re-interment or cremation of any remains under this article—
  • (a) a certificate of re-interment or cremation is to be sent by the undertaker to the Registrar General giving the date of re-interment or cremation and identifying the place from which the remains were removed and the place in which they were re-interred or cremated; and
  • (b) a copy of the certificate of re-interment or cremation and the record mentioned in paragraph (9) is to be sent by the undertaker to the relevant planning authority mentioned in paragraph (4).
  • (12) No notice is required under paragraph (3) before the removal of any human remains where the undertaker is satisfied—
  • (a) that the remains were interred more than 100 years ago; and
  • (b) that no relative or personal representative of the deceased is likely to object to the remains being removed in accordance with this article.
  • (13) In this article—
  • (a) references to a relative of the deceased are to a person who—
  • (i) is a husband, wife, civil partner, parent, grandparent, child or grandchild of the deceased; or
  • (ii) is, or is a child of, a brother, sister, uncle or aunt of the deceased.
  • (b) references to a personal representative of the deceased are to a person who—
  • (i) is the lawful executor or executrix of the estate of the deceased; or
  • (ii) is the lawful administrator of the estate of the deceased.
  • (14) The removal of the remains of any deceased person under this article must be carried out in accordance with any directions which may be given by the Secretary of State.
  • (15) Any jurisdiction or function conferred on the county court by this article may be exercised by the district judge of the court.
  • (16) Section 25 (offence of removal of body from burial ground)[^f00063] of the Burial Act 1857 does not apply to a removal carried out in accordance with this article.
  • (17) Section 239 (use and development of burial grounds) of the 1990 Act applies—
  • (a) in relation to land, other than a right over land, acquired for the purposes of the authorised development (whether or not by agreement), so as to permit use by the undertaker in accordance with the provisions of this Order; and
  • (b) in relation to a right over land so acquired (whether or not by agreement), or the temporary use of land pursuant to articles 30 (temporary use of land for constructing the authorised development) or 31 (temporary use of land for maintaining the authorised development), so as to permit the exercise of that right or the temporary use by the undertaker in accordance with the provisions of this Order,

and in section 240(1) (provisions supplemental to ss.238 and 239) of the 1990 Act reference to “regulations made for the purposes of sections 238(3) and (4) and 239(2)” means, so far as applicable to land or a right over land acquired under this Order, paragraphs (2) to (15) of this article and in section 240(3) of the 1990 Act reference to a “statutory undertaker” includes the undertaker and reference to “any other enactment” includes this Order.

  • (18) The Town and Country Planning (Churches, Places of Worship and Burial Ground) Regulations 1950[^f00064] do not apply to the authorised development.

Application of landlord and tenant law

38
  • (1) This article applies to—
  • (a) any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and
  • (b) any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,

so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.

  • (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
  • (3) No enactment or rule of law to which paragraph (2) applies is to apply in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
  • (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
  • (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
  • (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.

Operational land for purposes of the Town and Country Planning Act 1990

39

Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) of the 1990 Act (cases in which land is to be treated as not being operational land).

Planning permission

40

If planning permission is issued under the 1990 Act for development any part of which is within the Order limits following the publication of this Order that is—

  • (a) not itself a nationally significant infrastructure project under the 2008 Act or part of such a project; and
  • (b) required to complete or enable the construction, use or operation of the development authorised by this Order,

then the carrying out, use or operation of such development under the terms of the planning permission does not constitute a breach of the terms of this Order.

Defence to proceedings in respect of statutory nuisance

41
  • (1) Where proceedings are brought under section 82(1) of the Environmental Protection Act 1990[^f00065] (summary proceedings by person aggrieved by statutory nuisance) in relation to a nuisance falling within paragraph (g) (noise emitted from premises so as to be prejudicial to health or a nuisance) of section 79(1) of that Act no order is to be made, and no fine may be imposed, under section 82(2) of that Act if—
  • (a) the defendant shows that the nuisance—
  • (i) relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with a notice served under section 60 (control of noise on construction site), or a consent given under section 61 (prior consent for work on construction sites) of the Control of Pollution Act 1974[^f00066]; or
  • (ii) relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the carrying out of the authorised development in accordance with the controls and measures relating to noise as described in the code of construction practice or the construction environment management plan approved under Schedule 2 (Requirements) or in accordance with the noise levels set out in an environmental permit relating to the operation of the authorised development;
  • (iii) is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
  • (iv) is a consequence of complying with a requirement of this Order and that it cannot reasonably be avoided; or
  • (b) the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot be reasonably avoided.
  • (2) For the purposes of paragraph (1) above, compliance with the controls and measures relating to noise described in the code of construction practice and the CEMP will be sufficient, but not necessary, to show that an alleged nuisance could not reasonably be avoided.
  • (3) Where a relevant planning authority is acting in accordance with section 60(4) and section 61(4) of the Control of Pollution Act 1974 in relation to the construction of the authorised development then the local authority must also have regard to the controls and measures relating to noise referred to in the code of construction practice or the CEMP approved under Schedule 2 (Requirements).
  • (4) Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
  • (5) In this article “premises” has the same meaning as in section 79 of the Environmental Protection Act 1990[^f00067].

Felling or lopping

42
  • (1) The undertaker may fell, lop, prune, coppice, pollard or reduce in height or width, any tree or shrub within or overhanging land within the Order limits, or may cut back the roots of a tree or shrub which extend into the Order land if it reasonably believes it to be necessary to do so to prevent the tree, shrub or roots from—
  • (a) obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
  • (b) constituting a danger to persons using the authorised development.
  • (2) In carrying out any activity authorised by paragraph (1) or (3), the undertaker must not cause unnecessary damage to any tree, shrub or hedgerow and must pay compensation to any person who sustains any loss or damage arising from such activity for that loss or damage.
  • (3) The undertaker may, for the purpose of the authorised development—
  • (a) subject to paragraph (2), remove any hedgerows within the Order limits that may be required for the purposes of carrying out the authorised development; and
  • (b) only remove important hedgerows identified in Schedule 10 (Removal of important hedgerows) to the extent shown on the plans identified in Schedule 10.
  • (4) The power conferred by paragraph (3) removes any obligation upon the undertaker to secure any consent under the Hedgerows Regulations 1997[^f00068] in undertaking works pursuant to paragraph 3(a) or (b).
  • (5) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, must be determined under Part 1 of the 1961 Act (determination of questions of disputed compensation).
  • (6) In this article “hedgerow” and “important hedgerow” have the meaning given in the Hedgerow Regulations 1997.

Trees subject to Tree Preservation Orders

43
  • (1) The undertaker may fell, lop or prune any part of any tree which is within, over or under land within the Order limits and which is described in Schedule 8 (trees subject to Tree Preservation Orders) and identified on the general arrangement plans, or cut back its roots, if it reasonably believes it to be necessary in order to prevent the tree—
  • (a) from obstructing or interfering with the construction, maintenance or operation of the authorised development or any apparatus used in connection with the authorised development; or
  • (b) from constituting a danger to persons using the authorised development.
  • (2) In carrying out any activity authorised by paragraph (1)—
  • (a) the undertaker must do no unnecessary damage to any tree or shrub and must pay compensation to any person for any damage arising from such activity; and
  • (b) the duty in section 206(1) of the 1990 Act (replacement of trees) must not apply.
  • (3) The authority given by paragraph (1) constitutes a deemed consent under the relevant tree preservation order.
  • (4) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, must be determined under Part 1 of the 1961 Act.

Protection of interests

44

Schedule 9 (protective provisions) to the Order has effect.

Certification of documents, etc.

45
  • (1) As soon as practicable after the making of this Order, the undertaker must submit copies of each of the plans and documents set out in Schedule 11 (documents to be certified) to the Secretary of State for certification as true copies of those plans and documents.
  • (2) Where any plan or document set out in Schedule 11 requires to be amended to reflect the terms of the Secretary of State’s decision to make the Order, that plan or document in the form amended to the Secretary of State’s satisfaction is the version of the plan or document required to be certified under paragraph (1).
  • (3) A plan or document so certified will be admissible in any proceedings as evidence of the contents of the document of which it is a copy.

Service of notices

46
  • (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
  • (a) by post;
  • (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
  • (c) with the consent of the recipient and subject to paragraphs (5) to (8) by electronic transmission.
  • (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
  • (3) For the purposes of section 7 (references to services by post) of the Interpretation Act 1978[^f00069] as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
  • (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
  • (b) in any other case, the last known address of that person at the time of service.
  • (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
  • (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
  • (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
  • (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement will be taken to be fulfilled only where—
  • (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
  • (b) the notice or document is capable of being accessed by the recipient;
  • (c) the notice or document is legible in all material respects; and
  • (d) the notice or document is in a form sufficiently permanent to be used for subsequent reference.
  • (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or part of that notice or other document the sender will provide such a copy as soon as reasonably practicable.
  • (7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
  • (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
  • (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
  • (b) such revocation will be final and will take effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
  • (9) This article will not be taken to exclude the employment of any method of service not expressly provided for by it.
  • (10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.

No double recovery

47

Compensation must not be payable in respect of the same matter both under this Order and under any other enactment, any contract or deed or any rule of law, or under two or more different provisions of this Order.

Arbitration

48

Except where otherwise expressly provided for in this Order and unless otherwise agreed in writing between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the Lands Chamber of the Upper Tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the Secretary of State.

SCHEDULE 1 — AUTHORISED DEVELOPMENT

A nationally significant infrastructure project as defined in sections 14 and 21 of the 2008 Act, and associated development as defined in section 115 of the 2008 Act, comprising:

In the County of Hampshire

Work No.1A — Works to construct a high-pressure aviation fuel pipeline approximately 20 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative point shown on Sheet 1 of the Works Plans and ending at the indicative start point of Work No. 1B shown on Sheets 11/12 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 1 to 12 (inclusive) of the Works Plans.

Work No.1B — Works to construct a high-pressure aviation fuel pipeline approximately 15 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1A shown on Sheets 11/12 of the Works Plans and ending at the indicative start point of Work No. 1C shown on Sheet 20 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 11 to 20 (inclusive) of the Works Plans

Work No.1C — Works to construct a high-pressure aviation fuel pipeline approximately 15 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1B shown on Sheet 20 of the Works Plans and ending at the indicative start point of Work No. 1D shown on Sheet 28 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 20 to 28 (inclusive) of the Works Plans.

Work No. 1D —Works to construct a high-pressure aviation fuel pipeline approximately 9 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1C shown on Sheet 28 of the Works Plans and ending at the indicative start point of Work No. 1E shown on Sheet 33 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 28 to 33 (inclusive) of the Works Plans.

In the Counties of Hampshire and Surrey

Work No. 1Ei —Works to construct a high-pressure aviation fuel pipeline approximately 6 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1D shown on Sheet 33 of the Works Plans and ending at the indicative start point of Work No. 1Eii shown on Sheet 35 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 33 to 35 (inclusive) of the Works Plans.

Work No. 1Eii —Works to construct a high-pressure aviation fuel pipeline approximately 0.6 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1Ei shown on Sheet 35 of the Works Plans and ending at the indicative start point of Work No. 1Eiii shown on Sheet 35 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheet 35 of the Works Plans.

Work No. 1Eiii —Works to construct a high-pressure aviation fuel pipeline approximately 2.4 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1Eii shown on Sheet 35 of the Works Plans and ending at the indicative start point of Work No. 1F shown on Sheet 38 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 35 to 38 (inclusive) of the Works Plans.

In the County of Surrey

Work No. 1F —Works to construct a high-pressure aviation fuel pipeline approximately 17 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1E shown on Sheet 38 of the Works Plans and ending at the indicative start point of Work No. 1G shown on Sheet 47 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 38 to 47 (inclusive) of the Works Plans.

Work No. 1G —Works to construct a high-pressure aviation fuel pipeline approximately 4 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1F shown on Sheet 47 of the Works Plans and ending at the indicative start of point of Work No. 1H shown on Sheet 49 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 47 to 49 (inclusive) of the Works Plans.

In the County of Surrey and the London Borough of Hounslow

Work No. 1H —Works to construct a high-pressure aviation fuel pipeline approximately 8 kilometres in length and with a nominal external diameter of 330 millimetres (subject to engineering tolerance), starting at the indicative end point of Work No. 1G shown on Sheet 49 of the Works Plans and ending at the indicative point shown on Sheet 53 of the Works Plans and comprising—

  • (a) construction and installation of the pipeline by trenched and trenchless methods which may include the installation of concrete-lined sleeve tunnels, reception shaft, launch shaft and backfilling of permanent structures; and
  • (b) installation of pipeline marker posts and cathodic protection test posts along the pipeline route,

as shown on Sheets 49 to 53 (inclusive) of the Works Plans.

In the County of Hampshire

Work No. 2A — Works to construct an above ground valve within Work No. 3A, together with associated works, comprising an area of up to 3 metres by 2 metres, at the indicative point shown on Sheet 2 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above.

Work No. 2B —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 4 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2C —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 7 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2D —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 12 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2E —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 16 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2F —Works to construct a partially buried pressure transducer, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 17 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the pressure transducer and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2G —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 20 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2H —Works to construct an above ground valve within Work No. 3B, together with associated works, comprising an area of up to 3 metres by 2 metres, at the indicative point shown on Sheet 23 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above.

Work No. 2I —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 31 and 102 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2J —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 33 and 103 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

In the County of Surrey

Work No. 2K —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 36 and 112 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2L —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 41 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2M —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 43 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2N —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheet 47 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

Work No. 2O —Works to construct a partially buried concrete chamber containing a valve, together with associated works, comprising an area of up to 5 metres by 7 metres, at the indicative point shown on Sheets 51 and 124 of the Works Plans, such associated works to include—

  • (a) fencing;
  • (b) up to two personnel gates;
  • (c) below ground pipework;
  • (d) above ground control boxes and below ground cable ducts; and
  • (e) any other equipment as may be necessary or expedient in connection with the above,

subject to the chamber, valve and associated works not exceeding approximately 2 metres in height in any case.

In the County of Hampshire

Work No. 3A — Works to construct an Above Ground Installation at Boorley Green (“the Boorley Green AGI”), being a secure compound with an approximate area of 23 metres by 30 metres and a maximum height of 3 metres, comprising equipment for the reception and launching of pipeline inspection gauges in connection with pipeline inspection, cleansing and monitoring, at the indicative point shown on Sheet 2 of the Works Plans, to include—

  • (a) fencing (to an approximate height of 3 metres);
  • (b) a double entrance gate;
  • (c) up to two personnel gates;
  • (d) below ground pipework;
  • (e) above ground pipework, vessels, valves and instrumentation;
  • (f) above ground control boxes and below ground cable ducts;
  • (g) an internal access road;
  • (h) changes to ground levels as may be necessary, including the provision of drainage works and the laying of hard standing; and
  • (i) permanent widening of an access track off Netherhill Lane, and an extension of the access track to join the Boorley Green AGI.

Work No. 3B —Works to construct pipework, valves, pumps and any associated equipment, at the existing Alton Pumping Station, at the indicative point shown on Sheet 23 of the Works Plans.

In the London Borough of Hounslow

Work No. 3C — Works to construct pipework, valves, vessels and equipment for the reception and launching of pipeline inspection gauges in connection with pipeline inspection, cleansing and monitoring, together with any associated equipment, at the existing West London Terminal Above Ground Installation, at the indicative point shown on Sheets 53 and 123 of the Works Plans.

In the County of Hampshire

Work No. 4A — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 51 metres, at the indicative point shown on Sheet 1 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4B — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 60 metres by 62 metres, at the indicative point shown on Sheet 2 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) a plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4C — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 75 metres by 32 metres, at the indicative point shown on Sheet 2 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4D — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 69 metres by 44 metres, at the indicative point shown on Sheet 4 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4E — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 49 metres by 56 metres, at the indicative point shown on Sheet 4 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4F — Work No. not used.

Work No. 4G — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 50 metres by 48 metres, at the indicative point shown on Sheet 9 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4H — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 53 metres, at the indicative point shown on Sheet 9 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4I — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 43 metres by 52 metres, at the indicative point shown on Sheet 11 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4J — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 43 metres, at the indicative point shown on Sheet 11 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4K — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 42 metres, at the indicative point shown on Sheet 12 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4L — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 50 metres by 40 metres, at the indicative point shown on Sheet 15 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4M — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 32 metres by 42 metres, at the indicative point shown on Sheet 16 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4N — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 37 metres by 56 metres, at the indicative point shown on Sheet 19 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4O — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 66 metres by 52 metres, at the indicative point shown on Sheet 20 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4P— Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 40 metres by 53 metres, at the indicative point shown on Sheet 21 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4Q — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 51 metres by 38 metres, at the indicative point shown on Sheet 23 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4R — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 107 metres by 80 metres, at the indicative point shown on Sheet 23 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4S — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 34 metres by 52 metres, at the indicative point shown on Sheet 24 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4T — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 66 metres by 52 metres, at the indicative point shown on Sheet 25 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4U — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 53 metres by 41 metres, at the indicative point shown on Sheet 28 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4V — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 68 metres by 50 metres, at the indicative point shown on Sheet 29 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4W— Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 68 metres by 39 metres, at the indicative point shown on Sheet 29 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4X — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 60 metres by 42 metres, at the indicative point shown on Sheet 30 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4Y — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 67 metres by 48 metres, at the indicative point shown on Sheet 30 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4Z — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 42 metres by 59 metres, at the indicative point shown on Sheets 31 and 102 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4AA — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 39 metres by 25 metres, at the indicative point shown on Sheet 32 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4AB — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 52 metres by 24 metres, at the indicative point shown on Sheet 33 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4AC — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 32 metres by 52 metres, at the indicative point shown on Sheet 33 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4AD — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 29 metres by 62 metres, at the indicative point shown on Sheets 34 and 104 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

Work No. 4AE — Works to construct a temporary compound for use during the construction of the authorised development, comprising an area of up to 25 metres by 25 metres, at the indicative point shown on Sheets 34 and 105 of the Works Plans, to include―

  • (a) office, welfare and security facilities;
  • (b) a parking area for staff;
  • (c) power supplies and temporary lighting;
  • (d) pipe equipment and fittings storage;
  • (e) plant storage;
  • (f) a fabrication area;
  • (g) a plant wheel wash area;
  • (h) waste processing and management areas; and
  • (i) fencing and gating (to an approximate height of 2.4 metres).

In the County of Surrey

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.