  • (5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the Agency must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined in accordance with paragraph 29.
21
  • (1) Subject to sub-paragraph (5) Network Rail must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation and on land held by Network Rail for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
  • (2) If any such drainage work which Network Rail is liable to maintain is not maintained to the reasonable satisfaction of the Agency, the Agency may by notice in writing require Network Rail to repair and restore the work, or any part of such work, or (if Network Rail so elects and the Agency in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the Agency reasonably requires.
  • (3) Subject to paragraph 24, if, within a reasonable period being not less than 28 days beginning with the date on which a notice in respect of any drainage work is served under sub-paragraph (2) on Network Rail, Network Rail has failed to begin taking steps to comply with the reasonable requirements of the notice and has not subsequently made reasonably expeditious progress towards their implementation, the Agency may do what is necessary for such compliance and may recover any expenditure incurred by it in so doing from Network Rail.
  • (4) In the event of any dispute as to the reasonableness of any requirement of a notice served under sub-paragraph (2), the Agency must not except in a case of an emergency exercise the powers conferred by sub-paragraph (3) until the dispute has been finally determined in accordance with paragraph 29.
  • (5) This paragraph does not apply to—
  • (a) drainage works which are vested in the Agency, or which the Agency or another person is liable to maintain and is not precluded by the powers of the Order from doing so; or
  • (b) any obstruction of a drainage work for the purpose of a work or operation authorised by this Order and carried out in accordance with the provision of this Part of this Schedule.
22

Subject to paragraph 24, if by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by Network Rail to the reasonable satisfaction of the Agency and if Network Rail fails to do so, the Agency may make good the same and recover from Network Rail the expense reasonably incurred by it in so doing.

23
  • (1) Network Rail must take all such measures as may be reasonably practicable to prevent any interruption of the free passage of fish in the fishery during the construction of any specified work.
  • (2) If by reason of—
  • (a) the construction of any specified work; or
  • (b) the failure of any such work,

damage to the fishery is caused, or the Agency has reason to expect that such damage may be caused, the Agency may serve notice on Network Rail requiring it to take such steps as may be reasonably practicable to make good the damage, or, as the case may be, to protect the fishery against such damage.

  • (3) Subject to paragraph 24, if within such time as may be reasonably practicable for that purpose after the receipt of written notice from the Agency of any damage or expected damage to a fishery, Network Rail fails to take such steps as are described in sub-paragraph (2), the Agency may take those steps and may recover from Network Rail the expense reasonably incurred by it in doing so.
  • (4) Subject to paragraph 24, in any case where immediate action by the Agency is reasonably required in order to secure that the risk of damage to the fishery is avoided or reduced, the Agency may take such steps as are reasonable for the purpose, and may recover from Network Rail the reasonable cost of so doing provided that notice specifying those steps is served on Network Rail as soon as reasonably practicable after the Agency has taken, or commenced to take, the steps specified in the notice.
24

Nothing in paragraphs 20(4), 21(3), 22, 23(3) and 23(4) authorises the Agency to execute works on or affecting an operational railway forming part of Network Rail’s network without the prior consent in writing of Network Rail, such consent not to be unreasonably withheld or delayed.

25

If by reason of the construction of any specified work the Agency’s access to flood defences or equipment maintained by the Agency for flood defence purposes is materially obstructed, Network Rail must as soon as reasonably practicable provide such alternative means of access as will (so far as reasonably practicable) allow the Agency to maintain the flood defence or use the equipment no less effectively than was possible before the obstruction.

26

Network Rail must indemnify the Agency in respect of all costs, charges and expenses which the Agency may reasonably incur or have to pay or which it may sustain—

  • (a) in the examination or approval of plans under this Part of this Schedule; and
  • (b) in the inspection of the construction of the specified works or any protective works required by the Agency under this Part of this Schedule.
27
  • (1) Without affecting the other provisions of this Part of this Schedule, Network Rail must indemnify the Agency from all claims, demands, proceedings, costs, damages, expenses or loss, which may be made or taken against, recovered from, or incurred by, the Agency by reason of—
  • (a) any damage to any drainage work so as to impair its efficiency for the purposes of flood defence;
  • (b) any damage to the fishery;
  • (c) any raising or lowering of the water table in land adjoining the authorised works or any sewers, drains and watercourses;
  • (d) any flooding or increased flooding of any such lands; or
  • (e) inadequate water quality in any watercourse or other surface waters or in any groundwater,

which is caused by the construction of any of the specified works or any act or omission of Network Rail, its contractors, agents or employees whilst engaged upon the work.

  • (2) The Agency must give to Network Rail reasonable notice of any such claim or demand and no settlement or compromise may be made without the agreement of Network Rail which agreement must not be unreasonably withheld or delayed.
28

The fact that any work or thing has been executed or done by Network Rail in accordance with a plan approved or deemed to be approved by the Agency, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve Network Rail from any liability under the provisions of this Part of this Schedule.

29

Any dispute arising between Network Rail and the Agency under this Part of this Schedule, if the parties agree, is to be determined by arbitration under article 57 (arbitration), but otherwise is to be determined by the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport acting jointly on a reference to them by Network Rail or the Agency, after notice in writing by one to the other.

PART 4 — FOR THE PROTECTION OF LEAD LOCAL FLOOD AUTHORITIES

30
  • (1) The following provisions of this Part of this Schedule apply for the protection of the lead local flood authority unless otherwise agreed in writing between Network Rail and the lead local flood authority.
  • (2) In this Part of this Schedule—
  • “construction” includes execution, placing, altering, replacing, relaying and removal and “construct” and “constructed” are to be construed accordingly;
  • “drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any ordinary watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage or flood defence;
  • “lead local flood authority” means in relation to an ordinary watercourse the lead local flood authority concerned within the meaning of section 23 (prohibition on obstructions etc. in watercourses) of the Land Drainage Act 1991;
  • “ordinary watercourse” has the meaning given by the Land Drainage Act 1991;
  • “plans” includes sections, drawings, specifications and method statements; and
  • “specified work” means so much of any work or operation authorised by this Order as is in, on, under, over or within 16 metres of a drainage work or is otherwise likely to affect any drainage work.
31
  • (1) Before beginning to construct any specified work, Network Rail must submit to the lead local flood authority plans of the specified work and such further particulars available to it as the lead local flood authority may within 28 days of the submission of the plans reasonably require.
  • (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the lead local flood authority, or determined under paragraph 38.
  • (3) Any approval of the lead local flood authority required under this paragraph—
  • (a) must not be unreasonably withheld or delayed;
  • (b) is deemed to have been given if it is neither given nor refused within 2 months of the submission of the plans for approval and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and
  • (c) may be given subject to such reasonable requirements as the lead local flood authority may make for the protection of any drainage work.
  • (4) The lead local flood authority must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).
32

Without limitation on the scope of paragraph 31, the requirements which the lead local flood authority may make under that paragraph include conditions requiring Network Rail at its own expense to construct such protective works, whether temporary or permanent, during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—

  • (a) to safeguard any drainage work against damage; or
  • (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,

by reason of any specified work.

33
  • (1) Subject to sub-paragraph (2), any specified work, and all protective works required by the lead local flood authority under paragraph 32, must be constructed—
  • (a) without unreasonable delay in accordance with the plans approved or deemed to have been approved or settled under this Part of this Schedule; and
  • (b) to the reasonable satisfaction of the lead local flood authority,

and an officer of the lead local flood authority is entitled to watch and inspect the construction of such works.

  • (2) Network Rail must give to the lead local flood authority not less than 14 days’ notice in writing of its intention to commence construction of any specified work and notice in writing of its completion not later than 7 days after the date on which it is brought into use.
  • (3) If any part of a specified work or any protective work required by the lead local flood authority is constructed otherwise than in accordance with the requirements of this Part of this Schedule, the lead local flood authority may by notice in writing require Network Rail at Network Rail’s own expense to comply with the requirements of this Part of this Schedule.
  • (4) Subject to sub-paragraph (5), if within a reasonable period, being not less than 28 days from the date when a notice under sub-paragraph (3) is served upon Network Rail, it has failed to begin taking steps to comply with the requirements of the notice and subsequently to make reasonably expeditious progress towards their implementation, the lead local flood authority may execute the works specified in the notice and any expenditure incurred by it in so doing is recoverable from Network Rail.
  • (5) In the event of any dispute as to whether sub-paragraph (3) is properly applicable to any work in respect of which notice has been served under that sub-paragraph, or as to the reasonableness of any requirement of such a notice, the lead local flood authority must not except in emergency exercise the powers conferred by sub-paragraph (4) until the dispute has been finally determined.
34
  • (1) Subject to sub-paragraph (3) Network Rail must from the commencement of the construction of the specified works maintain in good repair and condition and free from obstruction any drainage work which is situated within the limits of deviation or on land held by Network Rail for the purposes of or in connection with the specified works, whether or not the drainage work is constructed under the powers conferred by this Order or is already in existence.
  • (2) If any such drainage work which Network Rail is liable to maintain is not maintained to the reasonable satisfaction of the lead local flood authority, the lead local flood authority may by notice in writing require Network Rail to repair and restore the work, or any part of such work, or (if Network Rail so elects and the lead local flood authority in writing consents, such consent not to be unreasonably withheld or delayed), to remove the work and restore the site to its former condition, to such extent and within such limits as the lead local flood authority reasonably requires.
  • (3) This paragraph does not apply to—
  • (a) drainage works which are vested in the lead local flood authority, or which the lead local flood authority or another person is liable to maintain and is not precluded by the powers of the Order from doing so; or
  • (b) any obstruction of a drainage work for the purposes of a work or operation authorised by this Order and carried out in accordance with the provisions of this Part of this Schedule.
35

If by reason of the construction of any specified work or of the failure of any such work the efficiency of any drainage work for flood defence purposes is impaired, or that drainage work is otherwise damaged, such impairment or damage must be made good by Network Rail to the reasonable satisfaction of the lead local flood authority and if Network Rail fails to do so, the lead local flood authority may make good the impairment or damage and recover from Network Rail the expense reasonably incurred by it in so doing.

36

Network Rail must pay all costs, charges and expenses which the lead local flood authority may reasonably incur or have to pay—

  • (a) in the examination or approval of plans under this Part of this Schedule; and
  • (b) in the inspection of the construction of the specified works or any protective works required by the lead local flood authority under this Part of this Schedule.
37

The fact that any work or thing has been executed or done by Network Rail in accordance with a plan approved or deemed to be approved by the lead local flood authority, or to its satisfaction, or in accordance with any directions or award of an arbitrator, does not relieve Network Rail from any liability under the provisions of this Part of this Schedule.

38

Any dispute arising between Network Rail and the lead local flood authority under this Part of this Schedule, if the parties agree, is to be determined by arbitration under article 57 (arbitration).

PART 5 — FOR THE PROTECTION OF THE TRUST

39
  • (1) The following provisions of this Schedule, unless otherwise agreed in writing between Network Rail and the Trust, have effect.
  • (2) In this Schedule—
  • “construction”, in relation to any specified work or protective work, includes— the execution and placing of that work; and any replacing, relaying, removal, alteration, renewal, maintenance, repair or reconstruction of that work as may be carried out during the period of 12 months from the completion of the work; and “construct” and “constructed” have corresponding meanings;
  • “detriment” means any damage to the waterways or any other property of the Trust and, without limitation on the scope of that meaning, includes— the erosion of the bed or banks of the waterways, or the impairment of the stability of any works, lands or premises forming part of the waterways; the silting of the waterways or the deposit of materials in the waterways so as to permanently damage the waterways; the pollution of the waterways; any permanent alteration in the water level of the waterways, or permanent interference with the supply of water to the waterways, or drainage of water from it; and any permanent harm to the ecology of the waterways (including any permanent adverse impact on any site of special scientific interest comprised in the waterways);
  • “the engineer” means an engineer appointed by the Trust for the purpose in question;
  • “plans” includes sections, designs, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction) and programmes;
  • “protective work” means a work which is reasonably necessary to be carried out before the commencement of construction of any specified work to prevent detriment;
  • “specified work” means so much of any of the authorised works as is situated upon, a cross under, over or within 15 metres of, or may directly and physically affect, the waterways; and
  • “the waterways” means the Huddersfield Broad Canal and the Calder and Hebble Navigation, and includes any works, lands or premises belonging to the Trust, or under its management or control, that are held and used by the Trust in connection with the waterways.
40

Network Rail must not under the powers conferred by this Order acquire compulsorily any land of the Trust or any easement or other right over such land, other than such land or easements or other rights over such land, as is reasonably necessary for, or in connection with, the construction, maintenance or operation of the authorised works.

41
  • (1) Network Rail must not in the exercise of the powers conferred by this Order permanently obstruct or interfere with pedestrian or vehicular access to the waterways unless such permanent obstruction or interference with such access is with the consent of the Trust.
  • (2) Nothing in article 22 (discharge of water) authorises Network Rail—
  • (a) to discharge any water directly or indirectly into the relevant part of the waterway; or
  • (b) to carry out any works to, or make any opening in, or otherwise interfere with, the relevant part of the waterway (including the banks and bed thereof),

except with the consent of the Trust and in accordance with plans approved by, and under the supervision (if given) of, the engineer.

  • (3) Network Rail must not exercise the powers conferred by article 23 (protective works to buildings, roads and apparatus of a statutory undertaker) in relation to any building forming part of the waterways, or situated on land or property of the Trust forming part of the waterways, except with the consent of the Trust.
  • (4) Network Rail must not exercise the powers conferred by article 24 (power to survey and investigate land) or the powers conferred by section 11(3) of the 1965 Act in relation to the waterways except with the consent of the Trust.
  • (5) Network Rail must not exercise the powers conferred by section 271 or 272 of the 1990 Act, as applied by Schedule 18 to this Order, so as to permanently divert any right of access to the waterways, but any such right of access may be permanently diverted with the consent of the Trust.
  • (6) The consent of the Trust under any of sub-paragraphs (1), (3), (4) and (5) and the approval of plans under sub-paragraph (2) must not be unreasonably withheld or delayed but may be given subject to reasonable conditions which in the case of article 22 (discharge of water) may include conditions—
  • (a) specifying the maximum volume of water which may be discharged in any period; and
  • (b) authorising the Trust on giving reasonable notice (except in an emergency, when the Trust may require immediate suspension) to Network Rail to require Network Rail to suspend the discharge of water or reduce the flow of water where this is necessary by reason of any operational requirement of the Trust and where a reasonable alternative is available to enable Network Rail to discharge the water in question during the period of the suspension.
42

Network Rail must not use any land or property of the Trust forming part of the waterways for the passage or siting of vehicles, plant or machinery employed in the construction of the specified work other than—

  • (a) with the consent in writing of the engineer whose consent must not be unreasonably withheld; and
  • (b) subject to compliance with such reasonable requirements as the engineer may from time to time specify—
  • (i) for the prevention of detriment; or
  • (ii) in order to avoid or reduce any inconvenience to the Trust, its officers and agents and all other persons lawfully on such land or property.
43

If in consequence of or in connection with the exercise of the powers conferred by this Order any part of a way over land forming part of the waterways or any public right of way giving access to the waterways (“the closed section”) is temporarily closed to persons on foot or on cycles and there is no way which provides a reasonable alternative, Network Rail must to the reasonable satisfaction of the Trust, provide in substitution as sufficient and convenient a way as is reasonably practicable between the points of commencement and termination of the closed section for such time as the closure continues.

44

Where so required by the engineer Network Rail must, to the reasonable satisfaction of the engineer, fence off any specified work or protective work or take such other steps as the engineer may require to be taken for the purpose of separating a specified work or a protective work from the waterways, whether on a temporary or permanent basis or both.

45
  • (1) Before the commencement of the initial construction of any part of the specified works and again following completion of the specified works Network Rail must bear the reasonable costs of the carrying out, by a qualified surveyor or engineer (“the surveyor”) to be approved by the Trust and Network Rail, of surveys (“the surveys”) of so much of the waterways and of any land and existing works of Network Rail which may provide support for the waterways as will or may be affected by the specified works.
  • (2) For the purposes of the surveys Network Rail must—
  • (a) on being given reasonable notice (save in case of emergency, when immediate access must be afforded) afford reasonable facilities to the surveyor for access to the site of the specified works and to any land and existing works of Network Rail which may provide support for the waterways as will or may be affected by the specified works; and
  • (b) supply the surveyor as soon as reasonably practicable with all such information as the surveyor may reasonably require with regard to such land and existing works of Network Rail and to the specified works or the method of their construction.
  • (3) The reasonable costs of the surveys must include the costs of any dewatering or reduction of the water level of any part of the waterways (where reasonably required) which may be effected to facilitate the carrying out of the surveys and the provisions of this Part of the Schedule apply with all necessary modifications to any such dewatering or reduction in the water level as though the same were specified works.
  • (4) Copies of the reports of the surveys must be provided to both the Trust and Network Rail.
46
  • (1) Network Rail must, before commencing construction of any specified work, including any temporary works, supply to the Trust proper and sufficient plans of that work and such further particulars available to it as the Trust may within 14 days of the submission of the plans reasonably require for the approval of the engineer and must not commence such construction of any specified work until plans of that work have been approved in writing by the engineer or settled by arbitration.
  • (2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld or delayed, if and within 56 days after such plans (including any other particulars reasonably required under sub-paragraph (1)) have been supplied to the Trust the engineer has not intimated disapproval of those plans and the grounds of disapproval the engineer is deemed to have approved the plans as submitted.
  • (3) When signifying his approval of the plans the engineer may specify—
  • (a) any protective work (whether temporary or permanent); and
  • (b) such other requirements as may be reasonably necessary to prevent detriment,

and such protective work must be constructed by the Trust or (if the Trust so desires) by Network Rail with all reasonable dispatch and Network Rail must not commence the construction of any specified work until the engineer has notified Network Rail that the protective work has been completed to the engineer’s reasonable satisfaction.

47

Without affecting its obligations under the provisions of this Part of this Schedule Network Rail must consult the Trust on―

  • (a) the design and appearance of the specified works, including the materials to be used for their construction; and
  • (b) the environmental effects of the specified works;

and must have regard to such views as may be expressed by the Trust, to the extent that these accord with the requirements of the local planning authority in response to such consultation pursuant, in particular, to the requirements imposed on the Trust by section 22 (general environmental and recreational duties) of the British Waterways Act 1995[^f00095] and to the interest of the Trust in preserving and enhancing the environment of the relevant part of the waterway.

48

Network Rail must give to the engineer 56 days’ notice of its intention to commence the construction of any of the specified works or protective works, or, in the case of repair carried out in an emergency, such notice as may be reasonably practicable so that, in particular, the Trust may where appropriate arrange for the publication of notices bringing those works to the attention of users of the waterways.

49

Network Rail must provide and maintain at its own expense in the vicinity of any specified works or protective work such temporary lighting and such signal lights for the control of navigation as the engineer may reasonably require during the construction or failure of the specified work or protective work.

50

Any specified works must, when commenced, be constructed―

  • (a) without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled in accordance with this Schedule and with any requirements made under paragraph 46(3)(b);
  • (b) under the supervision (if given) and, in the case of any specified work which directly and physically affects the relevant part of the waterway, to the reasonable satisfaction of the engineer;
  • (c) in such manner as to cause as little detriment as is reasonably practicable; and
  • (d) in such manner as to cause as little inconvenience as is reasonably practicable to the Trust, its officers and agents and all other persons lawfully using the waterways.
51
  • (1) Any pile, stump or other obstruction which becomes exposed in consequence of the construction of a specified work must be removed by Network Rail or, if it is not reasonably practicable to remove it, must be cut off at such level below the bed of the waterways as the Trust may direct.
  • (2) If Network Rail fails to remove any such pile, stump or other obstruction within 28 days after receipt of written notice from the Trust requiring the removal, the Trust may carry out the removal and recover its costs from Network Rail.
52

Network Rail must not in the course of constructing any specified work or protective work or otherwise in connection with the works do or permit anything which may result in the pollution of the waterways or the deposit of materials in the waterways and must take such steps as the engineer may reasonably require to avoid or make good any breach of its obligations under this paragraph; but this provision does not prevent Network Rail from carrying out works within the waterways.

53
  • (1) Network Rail must at all times on being given reasonable notice allow reasonable facilities to the engineer for access to any specified work during its construction; but such facilities for access are subject to Network Rail’s reasonable requirements for ensuring the safety of the railway and of the engineer and other persons working on the railway.
  • (2) Network Rail must supply the engineer with all such information as the engineer may reasonably require with regard to any specified work or the method of constructing it.
54
  • (1) If during the construction of a specified work or during a period of 24 months after the completion of a specified work any alterations or additions, either permanent or temporary, to the waterways are reasonably necessary in consequence of the construction of the specified work in order to avoid detriment, and the Trust gives to Network Rail reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), Network Rail must pay to the Trust the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by the Trust in maintaining, working and, when necessary, renewing any such alterations or additions.
  • (2) If the cost of maintaining, working or renewing the waterways is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by Network Rail to the Trust under this paragraph.
55
  • (1) Network Rail must, upon completion of any part of any permanent specified work, remove as soon as practicable any temporary works constructed and materials for temporary works placed in, on, over or under the waterways in connection with that part of the specified work.
  • (2) All temporary works must be removed to the reasonable satisfaction of the engineer, and in the construction, maintenance and removal of such works Network Rail must not cause unavoidable detriment.
56

If at any time after the completion of a specified work, not being a work vested in the Trust, the Trust gives notice to Network Rail informing it that the state of maintenance of the work appears to be such that the work is causing, or is likely to cause, detriment, Network Rail must, on receipt of such notice, take such steps as may be reasonably necessary to put the work in such state of maintenance as not to cause such detriment.

57

Any additional expenses which the Trust may reasonably incur in maintaining the waterways under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such maintenance has been given to Network Rail, be repaid by Network Rail to the Trust.

58

Network Rail must repay to the Trust all fees, costs, charges and expenses reasonably incurred by the Trust―

  • (a) in constructing any protective works under the provisions of paragraph 46(3)(a) including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
  • (b) in respect of the approval by the engineer of plans submitted by Network Rail and the supervision by the engineer of the construction or repair of any specified work and any protective work;
  • (c) in respect of the employment during the period of the initial construction of any specified work or protective work of any inspectors, watchkeepers and other persons whom it is reasonably necessary to appoint for inspecting, watching and lighting any part of the waterways and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of the specified work or any protective work; and
  • (d) in bringing the specified work or any protective work to the notice of users of the waterways.
59
  • (1) If any detriment is caused by the construction or failure of any specified work or protective work, Network Rail (if so required by the Trust) must make good such detriment and must pay to the Trust all reasonable expenses to which the Trust may be put, and compensation for any loss which the Trust may sustain, in making good or otherwise by reason of the detriment.
  • (2) Network Rail is responsible for and must make good to the Trust all costs, charges, damages, expenses and losses not otherwise provided for in this Part of this Schedule which may be occasioned to or reasonably incurred by the Trust―
  • (a) by reason of the construction of any specified work or a protective work or the failure of such a work; or
  • (b) by reason of any act or omission of Network Rail or of any person in its employ or of its contractors or others whilst engaged upon the construction of any specified work or of a protective work,

and subject to sub-paragraph (4) Network Rail must effectively indemnify and hold harmless the Trust from and against all claims and demands arising out of any of the matters referred to in paragraphs(a) and (b).

  • (3) The fact that any act or thing may have been done by the Trust on behalf of Network Rail or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision or in accordance with any directions or awards of an arbitrator does not (if it was done without negligence on the part of the Trust or of any person in its employ or of its contractors or agents) excuse Network Rail from any liability under the provisions of this paragraph.
  • (4) The Trust must give Network Rail reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of Network Rail.
60

Where under any provision of this Part of this Schedule the Trust or Network Rail (as the case may be) is entitled to a capitalised sum, it must provide such details of the formula by which the sum is calculated as may reasonably be requested by the party required to pay the sum.

61

Except as provided by this Order, nothing in this Order is to prejudice or derogate from the estates, rights, interests, privileges, liberties or franchises of the Trust or alter or diminish any power, authority or jurisdiction vested in the Trust at the making of this Order.

62

Any difference arising between Network Rail and the Trust under this Schedule (other than a difference as to the meaning or construction of this Schedule) is to be referred to and settled by arbitration in accordance with article 57 (arbitration).

63

Nothing in this Part of the Schedule affects the provision of any enactment or agreement regulating the relations between Network Rail and the Trust in respect of the waterways or any land and existing works of Network Rail adjacent to, under or over the waterways which have effect on the date on which this Order is made.

Signed

Signed by authority of the Secretary of State for Transport

Natasha Kopala — Head of the Transport and Works Act Orders Unit — Department for Transport — 13th October 2022

Explanatory note

(This note is not part of the Order)

EXPLANATORY NOTE

This Order authorises Network Rail Infrastructure Limited to construct a new railway, including the upgrade and reconstruction of the existing railway, railway electrification works and associated works between Huddersfield and Westtown (Dewsbury) together with station improvement works at Huddersfield and the construction or reconstruction of stations at Deighton, Mirfield and Ravensthorpe. The Order authorises the acquisition of land and rights in land, and the use of land, for the purposes of the works and confers powers in connection with the construction and operation of the railway.

A copy of the deposited plans, the deposited sections and the book of reference referred to in the Order may be inspected, on request, at the offices of Network Rail Infrastructure Limited at Network Rail National Records Centre, Unit 5, Audax Road, Clifton Moor, York, YO30 4US.

Footnotes

[^f00001]: S.I. 2006/1466 was amended by S.I. 2010/439, S.I. 2011/556, S.I. 2011/2085, S.I. 2012/147, S.I. 2012/1658, S.I. 2012/2590, S.I. 2013/755, S.I. 2014/469, S.I. 2015/627, S.I. 2017/979 and S.I. 2017/1070 and S.I. 2019/211.

[^f00002]: 1992 c. 42. Section 1 was amended by paragraphs 51 and 52 of Schedule 2 to the Planning Act 2008 (c. 29) Section 5 was amended by S.I. 2012/1659.

[^f00003]: 1961 c. 33.

[^f00004]: 1965 c. 56.

[^f00005]: 1980 c. 66.

[^f00006]: 1981 c. 67.

[^f00007]: 1984 c. 27.

[^f00008]: 1990 c. 8.

[^f00009]: 1991 c. 22.

[^f00010]: 2003 c. 21.

[^f00011]: S.I. 2016/1154.

[^f00012]: 2003 c. 21. Section 32(1) was amended by S.I. 2011/1210.

[^f00013]: 1981 c. 67. The definition of “owner” was amended by paragraph 9 of Schedule 15 to the Planning and Compensation Act 1991 (c. 34). There are other amendments to section 7 which are not relevant to this Order.

[^f00014]: 1845 c. 20.

[^f00015]: Section 58 was amended by Section 46 of, and part 3 of Schedule 7 to, the Justices of the Peace Act 1949 (c. 101).

[^f00016]: Section 75 was amended by section 49 of the Transport and Works Act 1992 (c. 42).

[^f00017]: Section 84, as substituted, was amended by part 3 of Schedule 7 to the Justices of the Peace Act 1949 (c. 101) and section 46 of the Criminal Justice Act 1982 (c. 48). Section 85C, as substituted, was amended by virtue of section 17(2)(a) of the Interpretation Act 1978 (c. 30).

[^f00018]: 1923 c. 20.

[^f00019]: Section 103 was amended by the Statute Law Revision Act 1892 (c. 19), Part 3 of Schedule 7 to the Justices of the Peace Act 1949 (c. 101) and section 46 of the Criminal Justice Act 1982 (c. 48).

[^f00020]: Section 105 was amended by Part 3 of Schedule 7 to the Justices of the Peace Act 1949 (c. 101) and section 46 of the Criminal Justice Act 1983 (c. 48).

[^f00021]: Section 145 was amended by the Statute Law Revision Act 1892 (c. 19) and part 2 of Schedule 12 to the Transport Act 1962 (c. 46).

[^f00022]: 1863 c. 92.

[^f00023]: Section 64 was amended by section 102 of, and Schedule 17 to, the Local Government Act 1985 (c. 51) and section 168(2) of, and Schedule 9 to, the New Roads and Street Works Act 1991 (c. 22).

[^f00024]: As amended by Sections 40 and 43 of the Traffic Management Act 2004 (c. 18).

[^f00025]: Section 56A was inserted by section 44 of the Traffic Management Act 2004 (c. 18).

[^f00026]: As amended by Sections 40 and 51 of the Traffic Management Act 2004 (c. 18).

[^f00027]: Schedule 3A was inserted by section 52(2) of, and Schedule 4 to, the Traffic Management Act 2004 (c. 18).

[^f00028]: Sections 54, 55, 57, 60, 68 and 69 were amended by section 40(1) and (2) of, and Schedule 1 to, the Traffic Management Act 2004 (c. 18).

[^f00029]: As amended by section 49(1) of the Traffic Management Act 2004.

[^f00030]: As amended by section 49(2) and 51(9) of the Traffic Management Act 2004.

[^f00031]: As amended by section 52(3) of the Traffic Management Act 2004.

[^f00032]: As amended by section 42 of the Traffic Management Act 2004.

[^f00033]: 1991 c. 59.

[^f00034]: 2010 c. 29.

[^f00035]: 1984 c. 55.

[^f00036]: 1836 (6 & 7 Will. 4) c. cxi

[^f00037]: 1837 (6 & 7 Will. 4) c. xxiv.

[^f00038]: 1845 (8 & 9 Vict.) c. xxxvi.

[^f00039]: 1846 (9 & 10 Vict.) c. cclxii.

[^f00040]: 1885 (48 & 49 Vict.) c. lxxxviii.

[^f00041]: 1878 (41 Vict.) c. ci.

[^f00042]: 1888 (51 & 52 Vict.) c. clxxvi.

[^f00043]: 1845 (8 & 9 Vict.) c.cv.

[^f00044]: 1846 (9 & 10 Vict.) c. cclix.

[^f00045]: 1878 (41 Vict.) c. ci.

[^f00046]: 1991 c. 56. Section 106 was amended by sections 35(1), 35(8) and 43(2) of, and Schedule 2 to, the Competition and Service (Utilities) Act 1992 (c. 43), sections 36(2) and 99 of the Water Act 2003 (c. 37) and paragraph 16(1) of Schedule 3 to the Flood and Water Management Act 2010 (c. 29).

[^f00047]: 1991 c. 57.

[^f00048]: Section 10 was amended by section 4 of, and paragraph 13(2) of Schedule 2 to, the Planning (Consequential Provisions) Act 1990 (c. 11) and S.I. 2009/1307.

[^f00049]: O.J. No. L 26, 28.1.2012, p.1. Council Directive 2014/52/EU (O.J. No L 124, 25.4.2014, p.1.

[^f00050]: O.J. No. L 206, 22.7.1992, p.7. Council Directive 2013/17/EU (O.J. No. L 158, 10.6.2013, p.193).

[^f00051]: 1979 c. 46.

[^f00052]: Section 182(1) of the Housing and Planning Act 2016 (c. 22).

[^f00053]: Section 4A was inserted by section 202(1) of the Housing and Planning Act 2016 (c. 22).

[^f00054]: Subsection 11(1B) was inserted by section 186(1) and (2)(b) of the Housing and Planning Act 2016 (c. 22).

[^f00055]: Section 11A was inserted by section 186(3) of the Housing and Planning Act 2016 (c. 22).

[^f00056]: Schedule 2A was inserted by paragraph 3 of Schedule 17 to the Housing and Planning Act 2016 (c. 22).

[^f00057]: 1981 c. 66.

[^f00058]: Section 5A was inserted by section 182(2) of the Housing and Planning Act 2016 (c. 22).

[^f00059]: Section 5B was inserted by section 202(2) of the Housing and Planning Act 2016 (c. 22).

[^f00060]: Section 6 was amended by paragraph 52(2) of Schedule 2 to the Planning (Consequential Provisions) Act 1990 (c. 11) and paragraph 7 of Schedule 15 to the Housing and Planning Act 2016 (c. 22).

[^f00061]: Section 7 was amended by paragraph 3 of Schedule 18 to the Housing and Planning Act 2016 (c. 22).

[^f00062]: Schedule A1 was inserted by paragraph 6 of Schedule 18 to the Housing and Planning Act 2016 (c. 22).

[^f00063]: Schedule 2A was inserted by paragraph 3 of Schedule 17 to the Housing and Planning Act 2016 (c. 22).

[^f00064]: Schedule 1A was inserted by paragraph 6 of Schedule 18 to the Housing and Planning Act 2016.

[^f00065]: Section 153(4A) was inserted by section 200(2) of the Housing and Planning Act 2016.

[^f00066]: Section 11 was amended by section 34(1) of, and Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), section 3 of, and Part 1 of Schedule 1 to, the Housing (Consequential Provisions) Act 1985 (c. 71), section 14 of, and paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measure 2006 (No. 1), sections 186(2), 187(2) and 188 of, and paragraph 6 of Schedule 14 and paragraph 3 of Schedule 16 to, the Housing and Planning Act 2016 (c. 22) and paragraph 64 of Schedule 1 to S.I. 2009/1307.

[^f00067]: Section 4 was amended by sections 184 and 185 of, and paragraphs 1 and 2 of Schedule 18 to, the Housing and Planning Act 2016 (c. 22).

[^f00068]: Section 13 was amended by sections 62(3) and 139(4) to (9) and 146, and paragraphs 27 and 28 of Schedule 13, and part 3 of Schedule 23, to the Tribunals Courts and Enforcement Act 2007 (c. 15).

[^f00069]: Paragraph 14(3) of Schedule 4 to, the Acquisition of Land Act 1981 (c. 67), paragraph 12(1) of Schedule 5 to, the Church of England (Miscellaneous Provisions) Measures 2006 (No. 1), sections 186(2) of the Housing and Planning Act 2016 (c. 22).

[^f00070]: Section 272 was amended by paragraph 103(1) of Schedule 17 to the Communications Act 2003 (c. 21).

[^f00071]: 1990 c. 43. Paragraph 6 of Schedule 17 to the Environment Act 1995 (c. 25).

[^f00072]: Section 51(1) and (2) of the Noise and Statutory Nuisance Act 1993 (c. 40). There are other amendments to this subsection which are not relevant to this Order.

[^f00073]: Section 61 was amended by Schedule 7 to the Building Act 1984 (c. 55), paragraph 15(3) of Schedule 15 to the Environmental Protection Act 1990 (c. 43), Schedule 24 to the Environment Act 1995 and paragraph 10 of Schedule 6 to the Building (Scotland) Act 2003 (asp. 8).

[^f00074]: Section 79(1)(ga) was inserted by subsection 2(2)(b) of the Noise and Statutory Nuisance Act 1993.

[^f00075]: Section 80(1) was amended by section 86 of the Clean Neighbourhoods and Environment Act 2005.

[^f00076]: 1993 c. 43.

[^f00077]: Section 90(2A) was inserted by section 16(1) of the Transport and Works Act (c. 42).

[^f00078]: Section 8 was substituted by paragraph 4 of Schedule 18 to the Housing and Planning Act 2016 (c. 22).

[^f00079]: Section 32 was amended by Schedule 17 to the Local Government Act 1985 (c. 51).

[^f00080]: 2004 c. 18.

[^f00081]: Section 65 was amended by section 153 of the Local Government and Housing Act 1989 (c. 42) and section 168(1) of, and paragraph 48 of Part 2 of Schedule 8 to, the New Roads and Street Works Act 1991 (c. 22) and section 48 of, and paragraph 29 of Schedule 4 to, the Road Traffic Act 1991 (c. 40) and section 1(6) of, and paragraphs 70 and 82 of Schedule 1 to, the Infrastructure Act 2015 (c. 7).

[^f00082]: 1978 c. 30.

[^f00083]: Inserted by paragraph 4(2) of Schedule 17 to the Housing and Planning Act 2016 (c. 22).

[^f00084]: 1973 c. 26.

[^f00085]: Paragraph 4 of Schedule 16 to the Housing and Planning Act 2016 (c. 22).

[^f00086]: Paragraph 4 of Schedule 15 of, the Planning and Compensation Act 1991 (c. 34) and S.I. 2009/1307.

[^f00087]: Paragraphs 103(1) and (2) of Schedule 17 to the Communications Act 2003 (c. 21).

[^f00088]: Section 279(3) was amended by paragraphs 103(1) and (2), and section 280 was amended by paragraph 104, of Schedule 17 to the Communications Act 2003 (c. 21). Sections 280 and 282 were amended by S.I. 2009/1307.

[^f00089]: The definition of “public utility undertakers” was amended by section 190(3) of, and part 1 of Schedule 27 to, the Water Act 1989 (c. 15) and section 112(4) of, and Schedule 18 to, the Electricity Act 1989 (c. 29).

[^f00090]: 1989 c. 29.

[^f00091]: Inserted by section 96(1) of, and paragraph 90 of Schedule 7 to, the Water Act 2003 (c. 37).

[^f00092]: Section 96(4) of, and Part 3 of Schedule 9 to, the Water Act 2003 and section 11(2) of the Water Act 2014 (c. 21) and section 42(3) of the Flood and Water Management Act 2010 (c. 29).

[^f00093]: 1986 c. 44.

[^f00094]: Section 4 of the Digital Economy Act 2017 (c. 30).

[^f00095]: 1995 c. i.

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.