The Norfolk Vanguard Offshore Wind Farm Order 2022
- (5) The undertaker must pay compensation to the owners and occupiers of land which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of any power conferred by this article.
- (6) Any dispute as to a person’s entitlement to compensation under paragraph (5), or as to the amount of the compensation, must be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (7) Nothing in this article affects any liability to pay compensation under section 152 of the 2008 Act (compensation in case where no right to claim in nuisance) or under any other enactment in respect of loss or damage arising from the carrying out of the authorised project, other than loss or damage for which compensation is payable under paragraph (5).
- (8) The undertaker may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i) except that the undertaker is not precluded from—
- (a) acquiring new rights or imposing restrictive covenants over any part of that land under article 20 (compulsory acquisition of rights) to the extent that such land is listed in column (1) of Schedule 6 (land in which only new rights etc., may be acquired); or
- (b) acquiring any part of the subsoil (or rights in the subsoil) of that land under article 24 (acquisition of subsoil or airspace only).
- (9) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
- (10) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
Temporary use of land for maintaining authorised project
27
- (1) Subject to paragraph (2), at any time during the maintenance period relating to any part of the authorised project, the undertaker may—
- (a) enter on and take temporary possession of any land within the Order limits if such possession is reasonably required for the purpose of maintaining the authorised project; and
- (b) construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.
- (2) Paragraph (1) does not authorise the undertaker to take temporary possession of—
- (a) any house or garden belonging to a house; or
- (b) any building (other than a house) if it is for the time being occupied.
- (3) Not less than 28 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
- (4) The undertaker is not required to comply with paragraph (3) in a case of emergency and if an emergency exists they must—
- (a) give to the owners and occupiers of the land in question notice of its intended entry or (as the case may be) of its having entered onto the land as soon as is reasonably practicable; and
- (b) comply with paragraph (1) so far as is reasonably possible in the circumstances.
- (5) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised project for which possession of the land was taken.
- (6) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.
- (7) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.
- (8) Any dispute as to a person’s entitlement to compensation under paragraph (7), or as to the amount of the compensation, must be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (9) Nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the maintenance of the authorised project, other than loss or damage for which compensation is payable under paragraph (7).
- (10) Where the undertaker takes possession of land under this article, the undertaker is not required to acquire the land or any interest in it.
- (11) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 of the 2008 Act (application of compulsory acquisition provisions).
- (12) In this article “the maintenance period” means—
- (a) in relation to the maintenance of any tree, hedge or shrub planted as part of an approved landscaping management scheme with the intention of screening the onshore project substation, the period referred to in requirement 19(2);
- (b) for the district of North Norfolk, the period referred to in requirement 19(2) in relation to the maintenance of landscaping; and
- (c) in relation to any other part of the authorised project, the period of 5 years beginning with the date on which the authorised project first exports electricity to the national electricity transmission network.
Extinguishment of private rights and restrictive covenants relating to apparatus removed from land subject to temporary possession
28
- (1) This article applies to any Order land of which the undertaker takes temporary possession under article 26 (temporary use of land for carrying out the authorised project).
- (2) Subject to paragraph (3), all private rights or restrictive covenants in relation to apparatus belonging to National Grid removed from any land to which this article applies will remain intact from the date on which the undertaker gives up temporary possession of that land.
- (3) If the undertaker, in agreement with National Grid, gives notice before the date that the undertaker gives up temporary possession of the land that any or all of the private rights or restrictive covenants in relation to apparatus belonging to National Grid removed from the land to which this article applies will be extinguished, such rights will be extinguished.
- (4) Any extinguishment of rights by paragraph (3) does not give rise to any cause of action relating to the presence on or in the land of any foundations and the undertaker is not required to remove foundations when giving up temporary possession).
Statutory undertakers
29
Subject to the provisions of Schedule 16 (protective provisions) the undertaker may—
- (a) acquire compulsorily, or acquire new rights or impose restrictive covenants over, the land belonging to statutory undertakers shown on the land plan within the Order land; and
- (b) extinguish the rights of, remove, relocate the rights of or reposition the apparatus belonging to statutory undertakers over or within the Order land.
Recovery of costs of new connections
30
- (1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 29 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
- (2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 29, any person who is—
- (a) the owner or occupier of premises the drains of which communicated with that sewer; or
- (b) the owner of a private sewer which communicated with that sewer,
is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
- (3) This article does not have effect in relation to apparatus to which Part 3 (street works in England and Wales) of the 1991 Act applies.
- (4) In this paragraph—
- “public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003; and
- “public utility undertaker” means a gas, water, electricity or sewerage undertaker.
PART 6 — Operations
Operation of generating station
31
- (1) The undertaker is hereby authorised to operate the generating station comprised in the authorised project.
- (2) This article does not relieve the undertaker of any requirement to obtain any permit or licence under any other legislation that may be required from time to time to authorise the operation of an electricity generating station.
Deemed marine licences under the 2009 Act
32
The marine licences set out in Schedules 9, 10, 11 and 12 are deemed to have been granted to the undertaker under Part 4 (marine licensing) of the 2009 Act for the licensed marine activities set out in Part 3, and subject to the conditions set out in Part 4, of each of those Schedules.
PART 7 — Miscellaneous and General
Application of landlord and tenant law
33
- (1) This article applies to—
- (a) any agreement for leasing to any person the whole or any part of the authorised project or the right to operate the same; and
- (b) any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised project, or any part of it,
so far as any such agreement relates to the terms on which any land which is the subject of a lease granted by or under that agreement is to be provided for that person’s use.
- (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
- (3) Accordingly, no such enactment or rule of law applies in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
- (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
- (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
- (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease).
Operational land for purposes of the 1990 Act
34
Development consent granted by this Order is treated as specific planning permission for the purposes of section 264(3)(a) of the 1990 Act (cases in which land is to be treated as operational land).
Felling or lopping of trees and removal of hedgerows
35
- (1) Subject to article 36 (trees subject to tree preservation orders), the undertaker may fell or lop or cut back any roots of any tree or shrub near any part of the authorised project, if it reasonably believes it to be necessary to do so to prevent the tree or shrub from obstructing or interfering with the construction, maintenance or operation of the authorised project or any apparatus used in connection with the authorised project.
- (2) In carrying out any activity authorised by paragraph (1), the undertaker must do no unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from such activity.
- (3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, must be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (4) The undertaker may, for the purposes of the authorised project—
- (a) remove any hedgerows within the Order limits and specified in Schedule 13, Part 3 (removal of hedgerows) and those hedgerows that, after assessment, are not classed as important hedgerows specified in Schedule 13, Part 1 (removal of potentially important hedgerows); and
- (b) remove the important hedgerows as are within the Order limits and specified in Schedule 13, Part 1 (removal of potentially important hedgerows) and Part 2 (removal of important hedgerows).
- (5) In this article “hedgerow” and “important hedgerow” have the same meaning as in the Hedgerows Regulations 1997[^f00042].
Trees subject to tree preservation orders
36
- (1) Subject to paragraph (2), the undertaker must not fell or lop or cut back the roots of any tree within or overhanging land within the Order limits which is the subject of a tree preservation order.
- (2) The undertaker may fell or lop any tree within or overhanging land within the Order limits subject to a tree preservation order which was made after 28 February 2017 or cut back its roots, if it reasonably believes it to be necessary to do so in order to prevent the tree from obstructing or interfering with the construction, maintenance or operation of the authorised project or any apparatus used in connection with the authorised project.
- (3) In carrying out any activity authorised by paragraph (2)—
- (a) the undertaker must do no unnecessary damage to any tree and must pay compensation to any person for any loss or damage arising from such activity; and
- (b) the duty contained in section 206(1) (replacement of trees) of the 1990 Act does not apply.
- (4) The authority given by paragraph (2) constitutes a deemed consent under the relevant tree preservation order.
- (5) Any dispute as to a person’s entitlement to compensation under paragraph (3), or as to the amount of compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
Certification of plans etc
37
- (1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of the following for certification that they are true copies of the documents referred to in this Order—
- (a) the environmental statement (document reference 6.1);
- (b) the land plan (document reference 2.2);
- (c) the works plan (document reference 2.4);
- (d) the access to works plan (document reference 2.5);
- (e) the temporary stopping up of public rights of way plan (document reference 2.6);
- (f) the streets to be temporarily stopped up plan (document reference 2.7);
- (g) the important hedgerows plan (document reference 2.11);
- (h) the book of reference (4.3);
- (i) the outline code of construction practice (8.1);
- (j) the design and access statement (8.3);
- (k) the outline written scheme of investigation (onshore) (8.5);
- (l) the outline written scheme of investigation (offshore) (8.6);
- (m) the outline landscape and ecological management strategy (8.7);
- (n) the outline traffic management plan (8.8);
- (o) the outline travel plan (8.9);
- (p) the outline access management plan (8.10);
- (q) the outline offshore operations and maintenance plan (8.11);
- (r) the offshore in principle monitoring plan (8.12);
- (s) the draft marine mammal mitigation protocol (8.13);
- (t) the outline project environmental management plan (document reference 8.14);
- (u) the outline scour protection and cable protection plan (document reference 8.16);
- (v) the in principle Norfolk Vanguard Southern North Sea Special Area of Conservation site integrity plan (8.17);
- (w) the outline marine traffic monitoring strategy (8.18);
- (x) the outline fisheries liaison and co-existence plan (8.19);
- (y) the outline Norfolk Vanguard Haisborough, Hammond and Winterton Special Area of Conservation site integrity plan (8.20);
- (z) the outline operational drainage plan (8.21);
- (aa) the outline skills and employment strategy (8.22);
- (bb) the Development Principles (8.23);
- (cc) the Onshore Project Substation Masterplan (8.27); the Alde-Ore Estuary Special Protection Area (SPA) – In Principle Compensation (8.24);
- (dd) the Haisborough, Hammond and Winterton Special Area of Conservation (SAC) – In Principle Compensation (8.25); and
- (ee) the Flamborough and Filey Coast Special Protection Area (SPA) – In Principle Compensation (8.26).
- (2) The outline landscape and ecological management strategy referred to at paragraph (1)(m) shall include the mitigations that were agreed during the examination of the Norfolk Boreas Development Consent Order in order to avoid a net loss of trees in relation to the proposed trenched crossing at Colby Road.
- (3) The outline traffic management plan referred to at paragraph (1)(n) shall include the Highway Intervention and Highway Mitigation schemes that were agreed during the examination of the Norfolk Boreas Development Consent Order in order to reduce the residual traffic impacts on Cawston and the adverse effects of construction traffic on Link 68 at Oulton.
- (4) Any other mitigations agreed during the examination of the Norfolk Boreas Development Consent Order in relation to Work Nos. 4B-12 shall be included in the relevant plan listed in paragraph (1) before submission to the Secretary of State for certification.
- (5) A plan or document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
- (6) Where a plan or document certified under paragraph (1)—
- (a) refers to a provision of this Order (including any specified requirement) when it was in draft form; and
- (b) identifies that provision by a number, or combination of numbers and letters, which is different from the number, or combination of numbers and letters by which the corresponding provision of this Order is identified in the Order as made,
the reference in the plan or document concerned must be construed for the purposes of this Order as referring to the provision (if any) corresponding to that provision in the Order as made.
Arbitration
38
- (1) Subject to article 41 (saving provisions for Trinity House), any difference under any provision of this Order, unless otherwise provided for, must be referred to and settled in arbitration in accordance with the rules at Schedule 14 (arbitration rules) of this Order, by a single arbitrator to be agreed upon by the parties, within 14 days of receipt of the notice of arbitration, or if the parties fail to agree within the time period stipulated, to be appointed on application of either party (after giving written notice to the other) by the Secretary of State.
- (2) Any matter for which the consent or approval of the Secretary of State or the Marine Management Organisation is required under any provision of this Order shall not be subject to arbitration.
Procedure in relation to certain approvals etc
39
- (1) Where an application is made to or request is made of the relevant planning authority, a highway authority, a street authority or the owner of a watercourse, sewer or drain for any agreement or approval required or contemplated by any of the provisions of the Order, such agreement or approval must, if given, be given in writing and may not be unreasonably withheld.
- (2) Schedule 15 (procedure for discharge of requirements) has effect in relation to all agreements or approvals granted, refused or withheld in relation to requirements 13, 14, 16, 17, 18, 20, 21, 22, 23, 24, 25, 26, 27, 28, 29, 32, 33 and 34 in Part 3 of Schedule 1 (requirements).
Abatement of works abandoned or decayed
40
Where Work No. 1(a) to (e) or Work No. 2 or any part of those works is abandoned or allowed to fall into decay the Secretary of State may, following consultation with the undertaker, issue a written notice requiring the undertaker at its own expense to repair and restore or remove Work Nos. 1(a) to (e) or Work No. 2 or any relevant part of those works and, without prejudice to any notice served under section 105(2) of the 2004 Act[^f00043], to restore the site of the relevant part(s) of Work Nos. 1(a) to (e) or Work No. 2 to a safe and proper condition within an area and to such an extent as may be specified in the notice.
Saving provisions for Trinity House
41
Nothing in this Order prejudices or derogates from any of the rights, duties or privileges of Trinity House.
Crown rights
42
- (1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker or any licensee to take, use, enter on or in any manner interfere with any land or rights of any description (including any portion of the shore or bed of the sea or any river, channel, creek, bay or estuary)—
- (a) belonging to Her Majesty in right of the Crown and forming part of The Crown Estate without the consent in writing of the Crown Estate Commissioners;
- (b) belonging to Her Majesty in right of the Crown and not forming part of The Crown Estate without the consent in writing of the government department having the management of that land; or
- (c) belonging to a government department or held in trust for Her Majesty for the purposes of a government department without the consent in writing of that government department.
- (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of an interest in any Crown land (as defined in the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.
- (3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions; and is deemed to have been given in writing where it is sent electronically.
Service of Notices
43
- (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
- (a) by post; or
- (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
- (c) with the consent of the recipient and subject to paragraphs (6) to (9), by electronic transmission.
- (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
- (3) For the purposes of section 7 of the Interpretation Act 1978( ) (references to service by post) as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
- (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
- (b) in any other case, the last known address of that person at the time of service.
- (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having an interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
- (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
- (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
- (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where—
- (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
- (b) the notice or document is capable of being accessed by the recipient;
- (c) the notice or document is legible in all material respects; and
- (d) in a form sufficiently permanent to be used for subsequent reference.
- (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within seven days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
- (7) Any consent to the use of an electronic transmission by a person may be revoked by that person in accordance with paragraph (8).
- (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
- (a) that person must give notice in writing or by electronic transmission revoking any consent given that person for that purpose; and
- (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than seven days after the date on which the notice is given.
- (9) This article does not exclude the employment of any method of service not expressly provided for by it.
Protective provisions
44
Schedule 16 (protective provisions) has effect.
Compensation to protect the coherence of the national site network
45
Schedule 17 (compensation to protect the coherence of the national site network) has effect.
SCHEDULE 1 — Authorised Project
PART 1 — Authorised Development
1
A nationally significant infrastructure project as defined in sections 14 and 15 of the 2008 Act which is located in the North Sea approximately 47km from the Norfolk coast, comprising—
Offshore
Work No. 1
- (a) an offshore wind turbine generating station with a gross electrical output of over 100 MW comprising up to 145 wind turbine generators each fixed to the seabed by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson), or gravity base fitted with rotating blades and situated within the area shown on the works plan and further comprising (b) to (e) below;
- (b) up to two accommodation platforms fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;
- (c) up to two meteorological masts fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled or suction caisson), jacket (piled or suction caisson) or gravity base;
- (d) up to two LIDAR measurement buoys fixed to the seabed within the area shown on the works plan by one of the following foundation types: monopile (piled) or floating, and up to two wave measurement buoys fixed to the seabed within the area shown on the works plan by one foundation type (floating); and
- (e) a network of subsea array cables and fibre optic cables within the area shown on the works plan between the wind turbine generators, and between the wind turbine generators and Work No.2 including one or more offshore cable crossings;
and associated development within the meaning of section 115(2) (development for which development consent may be granted) of the 2008 Act comprising—
Work No. 2 – up to two offshore electrical platforms fixed to the seabed within the area shown on the works plan by one of the following foundation types: jacket (piled or suction caisson) or gravity base;
Work No. 3 – a network of subsea cables and fibre optic cables within the area shown on the works plans comprising Work No. 2 for the transmission of electricity and electronic communications between the offshore electrical platforms and including one or more offshore cable crossings;
Work No. 4A – up to four subsea export cables and fibre optic cables between Work No. 2 and Work No. 4B consisting of subsea cables and fibre optic cables along routes within the Order limits seaward of MLWS including one or more offshore cable crossings;
Intertidal area
Work No. 4B – up to four subsea export cables and fibre optic cables between Work No. 4A and Work No. 4C consisting of subsea cables and fibre optic cables along routes within the Order limits between MLWS and MHWS at Happisburgh South, North Norfolk;
In the county of Norfolk, district of North Norfolk
Work No. 4C – the onshore transmission works at the landfall consisting of up to two transition jointing pits and up to four cables to be laid in ducts underground and associated fibre optic cables laid within cable ducts underground from MHWS at Work No. 4B to Work No. 5;
In the county of Norfolk, district of Broadland
Work No. 6 – onshore transmission works consisting of up to four cables to be laid in ducts and up to four additional cable ducts for the wind farm authorised by the Norfolk Boreas Development Consent Order laid underground and associated fibre optic cables laid underground within cable ducts from Work No. 5 to Work No. 7;
In the county of Norfolk, district of Breckland
Work No. 7 – onshore transmission works consisting of up to four cables to be laid in ducts and up to four additional cable ducts for the wind farm authorised by the Norfolk Boreas Development Consent Order laid underground and associated fibre optic cables laid underground within cable ducts from Work No. 6 to Work No. 8A;
Work No. 10A – an extension to the existing National Grid substation at Necton;
Work No. 10B – additional surface water management for the extended National Grid substation at Necton in connection with Work No. 10A;
Work No. 10C – bunding, embankments, boundary treatments and landscaping in connection with Work No. 10A;
Work No. 11 – the removal of one existing pylon and construction of two new permanent pylons, as shown marked by (W) and (E) on the works plans, and the installation of conductors, insulators and fittings on to the pylons;
Work No. 11A – the overhead line modification;
Work No. 12 – permanent accesses connecting the A47 to Work No.8A, Work No. 10A and Work No. 10B including highway widening works on the A47 to create a new junction;
and in connection with Work Nos. 1 to 4B and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project and which fall within the scope of the work assessed by the environmental statement including—
- (a) scour protection around the foundations of the offshore structures;
- (b) cable protection measures such as the placement of rock and/or concrete mattresses, with or without frond devices;
- (c) the removal of material from the seabed required for the construction of Work Nos. 1 to 4B and the disposal of up to 49,211,390 cubic metres of inert material of natural origin within the Order limits produced during construction drilling, seabed preparation for foundation works, cable installation preparation such as sandwave clearance, boulder clearance and pre-trenching and excavation of horizontal directional drilling exit pits;
- (d) removal of static fishing equipment; and
- (e) disposal of drill arisings in connection with any foundation drilling up to a total of 414,761 cubic metres;
and in connection with Work Nos. 4C to 12 and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the work assessed by the environmental statement, including—
- (a) works to secure vehicular and/or pedestrian means of access including the creation of new tracks, footpaths, and/or widening, creation of passing places, upgrades, creation of bell mouths, creation of temporary slip roads and improvements of existing tracks, footpaths and roads;
- (b) temporary access tracks and running tracks both alongside and used for the purpose of constructing Work Nos. 5, 6, 7, and 9;
- (c) car parking areas, welfare facilities, temporary offices and workshops;
- (d) bunds, embankments, swales, landscaping, boundary treatments and works to mitigate any effects of the construction, operation or maintenance of the authorised project;
- (e) spoil and equipment storage;
- (f) jointing pits, manholes, kiosks, marker posts, link boxes and other works associated with laying ducts and/or cables and fibre optic cables and/or pulling cables and fibre optic cables through cable ducts;
- (g) water supply works, foul drainage provision, surface water management systems, temporary drainage during installation of ducts and/or cables and fibre optic cables and at the onshore project substation and culverting;
- (h) works of restoration;
- (i) fencing or other means of enclosure;
- (j) works to alter the course of, or otherwise interfere with, non-navigable rivers, streams or watercourses;
- (k) working sites and mobilisation areas in connection with the construction of the authorised development;
- (l) bowsers, septic tanks, generators and standby generators;
- (m) ramps and temporary bridges used for the purpose of constructing Work Nos. 5, 6 7, and 9;
- (n) works for the provision of apparatus including cabling, water and electricity supply works;
- (o) habitat creation and archaeological works; and
- (p) such other works, apparatus, plant and machinery of whatever nature as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised project;
and in connection with Work No. 11 and Work No. 11A and to the extent that they do not otherwise form part of any such work, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope the work assessed by the environmental statement, including—
- (a) the construction of a temporary overhead electric line comprising three temporary pylons, conductors, insulators and fittings between pylons 4VV123 and 4VV127; and
- (b) the temporary diversion of the overhead line onto the temporary pylons.
PART 2 — Ancillary Works
1
Works within the Order limits which have been subject to an environmental impact assessment recorded in the environmental statement comprising—
- (a) temporary landing places, moorings or other means of accommodating vessels in the construction and/ or maintenance of the authorised development;
- (b) marking buoys, beacons, fenders and other navigational warning or ship impact protection works; and
- (c) temporary works for the benefit or protection of land or structures affected by the authorised development.
PART 3 — Requirements
Time limits
1
The authorised project must commence no later than the expiration of five years beginning with the date this Order comes into force.
Detailed offshore design parameters
2
- (1) Subject to paragraph (2), any wind turbine generator forming part of the authorised project must not—
- (a) exceed a height of 350 metres when measured from HAT to the tip of the vertical blade;
- (b) exceed a height of 198.5 metres to the height of the centreline of the generator shaft forming part of the hub when measured from HAT;
- (c) exceed a rotor diameter of 303 metres;
- (d) be less than 800 metres from the nearest wind turbine generator in either direction perpendicular to the approximate prevailing wind direction (crosswind) or be less than 800 metres from the nearest wind turbine generator in either direction which is in line with the approximate prevailing wind direction (downwind); or
- (e) have a draught height which is less than the minimum draught height specified for the relevant wind turbine generator capacity in the table below—
| Wind Turbine Generator Capacity | Minimum draught height |
|---|---|
| Up to and including14.6MW | 35m from MHWS |
| 14.7 MW and above | 30m from MHWS |
- (2) References to the location of a wind turbine generator in paragraph (2) above are references to the centre point of that turbine.
3
- (1) The total number of wind turbine generators forming part of the authorised project must not exceed 145 and must be configured such that at any time—
- (a) no more than two-thirds of the total number of wind turbine generators (rounded to the nearest whole number) must be located in Norfolk Vanguard West; and
- (b) no more than one-half of the total number of wind turbine generators (rounded to the nearest whole number) must be located in Norfolk Vanguard East.
- (2) The total number of offshore electrical platforms forming part of the authorised project must not exceed two.
- (3) The total number of accommodation platforms must not exceed two.
- (4) The total number of meteorological masts must not exceed two.
- (5) The total number of LIDAR measurement buoys must not exceed two and the total number of wave measurement buoys must not exceed two.
4
- (1) The dimensions of any offshore electrical platforms forming part of the authorised project (excluding towers, helipads, masts and cranes) must not exceed 100 metres in height when measured from HAT, 120 metres in length and 80 metres in width.
- (2) The dimensions of any accommodation platform forming part of the authorised project (excluding helipads) must not exceed 100 metres in height when measured from HAT, 90 metres in length and 60 metres in width.
- (3) Each meteorological mast must not exceed a height of 200 metres above HAT.
- (4) Each meteorological mast must not have more than one supporting foundation.
5
The total length of the cables and the volume and area of their cable protection must not exceed the following—
| Work | Length | Cable protection (m² and m³) |
|---|---|---|
| Work No. 1(e) (array) | 600 kilometres | 389,000m² 198,500m³ |
| Work No. 3 (interconnector link) | 150 kilometres | 76,000m² 38,000m³ |
| Work No. 4A and 4B (export cable) | 400 kilometres | 102,086m² 59,836m³ |
6
- (1) In relation to a wind turbine generator, each foundation using piles must not have—
- (a) more than four driven piles;
- (b) in the case of single pile structures, a pile diameter which is more than 15 metres; or
- (c) in the case of two or more pile structures, have a pile diameter which is more than five metres.
- (2) In relation to a wind turbine generator, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 1,963 m².
7
- (1) In relation to a meteorological mast, each foundation using piles must not have—
- (a) more than four driven piles;
- (b) in the case of single pile structures, a pile diameter which is more than 10 metres; or
- (c) in the case of two or more pile structures, have a pile diameter which is more than three metres.
- (2) In relation to a meteorological mast, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 314 m².
8
- (1) In relation to an offshore electrical platform, each foundation using piles must not have—
- (a) more than 18 driven piles; or
- (b) in the case of two or more pile structures, have a pile diameter which is more than five metres.
- (2) In relation to the offshore electrical platform(s), the foundations must not have a combined seabed footprint area (excluding scour protection) of greater than 15,000 m².
9
- (1) In relation to any accommodation platform, each foundation using piles must not have—
- (a) more than six driven piles; or
- (b) in the case of two or more pile structures, have a pile diameter which is more than three metres.
- (2) In relation to an accommodation platform, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 7,500 m².
10
- (1) In relation to any LIDAR measurement buoys, each foundation using piles must not have a pile diameter of greater than 10 metres.
- (2) In relation to any LIDAR measurement buoys, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 79 m²per buoy and 157m² in total.
- (3) In relation to any wave measurement buoys, each foundation must not have a seabed footprint area (excluding scour protection) of greater than 150m² per buoy and 300 m² in total.
11
The total amount of scour protection for the wind turbine generators, accommodation platform, meteorological masts, offshore electrical platforms and LIDAR measurement buoys forming part of the authorised project must not exceed 5,196,703m² and 25,983,515m³.
Aviation safety
12
- (1) The undertaker must exhibit such lights, with such shape, colour and character and at such times as are required in writing by Air Navigation Order 2016[^f00044] and/or determined necessary for aviation safety in consultation with the Defence Infrastructure Organisation Safeguarding and as directed by the CAA. Lighting installed specifically to meet Ministry of Defence aviation safety requirements must remain operational for the life of the authorised development unless otherwise agreed in writing with the Ministry of Defence.
- (2) The undertaker must notify the Defence Infrastructure Organisation Safeguarding, at least 14 days prior to the commencement of the offshore works, in writing of the following information—
- (a) the date of the commencement of construction of the offshore works;
- (b) the date any wind turbine generators are brought into use;
- (c) the maximum height of any construction equipment to be used;
- (d) the maximum heights of any wind turbine generator, meteorological mast, offshore electrical platform and accommodation platform to be constructed; and
- (e) the latitude and longitude of each wind turbine generator, meteorological mast, offshore electrical platform and accommodation platform to be constructed,
and the Defence Infrastructure Organisation Safeguarding must be notified of any changes to the information supplied under this paragraph and of the completion of the construction of the offshore works.
Ministry of Defence surveillance operations
13
- (1) No wind turbine generator forming part of the authorised development is permitted to rotate its rotor blades on its horizontal axis until the Secretary of State having consulted with the Ministry of Defence confirms satisfaction in writing that appropriate mitigation will be implemented and maintained for the life of the authorised development and that arrangements have been put in place with the Ministry of Defence to ensure that the approved mitigation is implemented.
- (2) For the purposes of this requirement—
- (a) “appropriate mitigation” means measures to prevent or remove any adverse effects which the authorised development will have on the air defence radar at Remote Radar Head (RRH) Neatishead and the Ministry of Defence’s air surveillance and control operations;
- (b) “approved mitigation” means the detailed Radar Mitigation Scheme (RMS) that will set out the appropriate measures and timescales for implementation as agreed with the Ministry of Defence at the time the Secretary of State confirms satisfaction in writing in accordance with paragraph (1); and
- (c) “Ministry of Defence” means the Ministry of Defence as represented by Defence Infrastructure Organisation – Safeguarding, St George’s House, DIO Head Office, DMS Whittington, Lichfield, Staffordshire WS14 9PY or any successor body.
- (3) The undertaker must thereafter comply with all other obligations contained within the approved mitigation for the life of the authorised development.
Offshore decommissioning
14
- (1) No offshore works may commence until a written decommissioning programme in compliance with any notice served upon the undertaker by the Secretary of State pursuant to section 105(2) (Requirement to prepare decommissioning programmes) of the 2004 Act has been submitted to the Secretary of State for approval.
- (2) The obligations under paragraphs (3) and (4) shall only apply in respect of cable protection, apart from at cable crossing locations with existing cables and pipelines, which is installed as part of the authorised project within the Haisborough, Hammond and Winterton Special Area of Conservation as at the date of the grant of the Order.
- (3) No later than 4 months prior to each deployment of cable protection in the Haisborough, Hammond and Winterton Special Area of Conservation, except where otherwise stated or unless otherwise agreed in writing by the Secretary of State, the undertaker must submit the following documents for approval by the Secretary of State:
- (a) a decommissioning feasibility study on the proposed cable protection to be updated at intervals of not more than every ten years throughout the operational phase of the project;
- (b) a method statement for recovery of cable protection; and
- (c) a monitoring plan to include appropriate surveys following decommissioning to monitor the recovery of the area of the Haisborough, Hammond and Winterton Special Area of Conservation impacted by cable protection.
- (4) No cable protection can be deployed in the Haisborough, Hammond and Winterton Special Area of Conservation until the Secretary of State, in consultation with the MMO and the Statutory Nature Conservation Body approves in writing the documents pursuant to paragraph (3) above.
Stages of authorised development onshore
15
- (1) The onshore transmission works must not be commence, nor powers of compulsory acquisition under Part 5 of this Order be exercised, until notification has been submitted to the relevant planning authority detailing whether the onshore works will be constructed:
- (a) in a single onshore phase; or
- (b) in two onshore phases.
- (2) The onshore transmission works may not be commenced until a written scheme setting out the stages of the onshore transmission works for the relevant onshore phase has been submitted to the relevant planning authority.
- (3) The written scheme must be implemented as notified under paragraph (2).
Detailed design parameters onshore
16
- (1) The total number of converter buildings for the onshore project substation must not exceed two.
- (2) Construction works for the converter buildings referred to in paragraph (1) above must not commence until details of the layout, scale and external appearance of the same have been submitted to and approved by the relevant planning authority.
- (3) The onshore project substation must be carried out in accordance with the approved details.
- (4) Any details provided by the undertaker pursuant to paragraph (2) must:
- (a) accord with the design and access statement;
- (b) be supported by a statement illustrating how the details submitted accord with the principles of the OPS Masterplan and have been informed by a strategic approach to mitigate cumulative impacts arising from the onshore project substation and the Norfolk Boreas onshore project substation;
- (c) have been subject to an early independent design review which must consider whether the requirements of sub-paragraphs (a) and (b) have been satisfied and make recommendations for design improvements if not; and
- (d) be within the Order limits.
- (5) Buildings (including the converter buildings) comprised in Work No. 8A must not exceed a height of 19 metres above existing ground level and external electrical equipment comprised in Work No. 8A must not exceed a height of 25 metres above existing ground level.
- (6) The total footprint of each converter building must not exceed 110 metres by 70 metres.
- (7) The fenced compound area (excluding its accesses) for the onshore project substation comprised in Work No. 8A must not exceed 250 metres by 300 metres.
- (8) For the purposes of subparagraph (5) of this requirement ‘existing ground level’ means 71 metres above ordnance datum.
- (9) The external electrical equipment comprised in Work No. 10A must not exceed a height of 15 metres above existing ground level.
- (10) For the purposes of subparagraph (9) of this requirement ‘existing ground level’ means 69 metres above ordnance datum.
- (11) The fenced compound area (excluding its accesses) for the extension to the Necton National Grid substation comprised in Work No. 10A must not exceed 200 metres by 150 metres.
- (12) Construction works for the permanent replacement overhead pylons comprised in Work No. 11 must not commence until details of the same have been submitted to and approved by the relevant planning authority.
- (13) The permanent replacement overhead line pylon works comprised in Work No. 11 must be carried out in accordance with the approved details.
- (14) The permanent replacement overhead line pylons comprised in Work No. 11 must not exceed a height of 55 metres above existing ground level.
- (15) The total footprint of each permanent replacement overhead line pylon comprised in Work No. 11 must not exceed 25 metres by 25 metres.
- (16) For the purposes of subparagraph (14) of this requirement ‘existing ground level’ means between 66 and 69 metres above ordnance datum in respect of the eastern pylon identified on work plan 41 of 42 with the letter ‘E’ and between 68 and 70 metres above ordnance datum in respect of the eastern pylon identified on work plan 41 of 42 with the letter ‘W’.
- (17) Trenchless installation techniques must be used for the purposes of passing under—
- (a) the River Wensum (Work No. 7);
- (b) King’s Beck (Work No. 5);
- (c) Wendling Beck (Work No. 7);
- (d) River Bure (Work No. 6);
- (e) North Walsham and Dilham Canal (Work No. 5);
- (f) the Witton Hall Plantation along Old Hall Road (Work No. 5);
- (g) the Wendling Carr County Wildlife Site (Work No. 7);
- (h) Little Wood County Wildlife Site (Work No. 7);
- (i) land south of the Dillington Carr County Wildlife Site (Work No. 7);
- (j) Kerdiston proposed County Wildlife Site (Work No. 6);
- (k) Marriott’s Way County Wildlife Site/ Public Right of Way (Work No. 6);
- (l) Paston Way and Knapton Cutting County Wildlife Site (Work No. 5);
- (m) Norfolk Coast Path (Work No. 4C);
- (n) Norwich to Cromer railway line at north Walsham (Work No. 5);
- (o) Wymondham to North Elmham Railway line at Dereham (Work No. 7);
- (p) A47 Road (Work No. 7);
- (q) A140 Road (Work No. 6);
- (r) A149 Road (Work No. 5);
- (s) A1067 Road (Work No. 7); and
- (t) ... B1149 (Work No. 6).
- (18) The number of underground cable ducts to be installed at the landfall must not exceed four.
Landfall method statement
17
- (1) No part of Work Nos. 4A, 4B or 4C may commence until a method statement for the construction of Work Nos. 4A, 4B and 4C has been submitted to and approved in writing by North Norfolk District Council in consultation with Natural England.
- (2) The method statement referred to in paragraph (1) must include measures for long horizontal directional drilling below the coastal shore platform and cliff base at the landfall as well as measures for ongoing inspection of Work No. 4C and reporting of results to North Norfolk District Council during the operation of the authorised project.
- (3) In the event that inspections indicate that as a result of the rate and extent of landfall erosion Work No. 4C could become exposed during the operation of the authorised project the undertaker must, as soon as practicable, submit proposals in writing for remedial measures to protect Work No. 4C, together with a timetable for their implementation, to North Norfolk District Council for their approval, in consultation with Natural England.
- (4) The method statement and any proposals for remedial measures must be implemented as approved.
Provision of landscaping
18
- (1) No stage of the onshore transmission works may commence until for that stage a written landscaping management scheme and associated work programme (which accords with the outline landscape and ecological management strategy) has been submitted to and approved by the relevant planning authority in consultation with Natural England.
- (2) The landscaping management scheme must include details of proposed hard and soft landscaping works appropriate for the relevant stage, including—
- (a) location, number, species, size and planting density of any proposed planting, including any trees;
- (b) cultivation, importing of materials and other operations to ensure plant establishment;
- (c) hard surfacing materials;
- (d) details of existing trees to be removed, and details of existing trees and hedgerows to be retained with measures for their protection during the construction period;
- (e) retained historic landscape features and proposals for restoration, where relevant;
- (f) implementation timetables for all landscaping works;
- (g) proposed finished heights, form and gradient of earthworks; and
- (h) maintenance of the landscaping.
- (3) The landscaping management scheme must be implemented as approved.
Implementation and maintenance of landscaping
19
- (1) All landscaping works must be carried out in accordance with the landscaping management schemes approved under requirement 18 (provision of landscaping), and in accordance with the relevant recommendations of appropriate British Standards.
- (2) Any tree, hedge or shrub planted as part of an approved landscaping management scheme with the intention of screening the onshore project substation (and/or the Norfolk Boreas onshore project substation) that, within a period of twenty-five years after planting, is removed, dies or becomes in the opinion of the relevant planning authority, seriously damaged or diseased must be replaced in the first available planting season with a specimen of the same species and size as that originally planted unless a different species is otherwise approved by the relevant planning authority.
- (3) Any tree, hedge, or shrub planted within the district of North Norfolk as part of an approved landscaping management scheme that, within a period of ten years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased must be replaced in the first available planting season with a specimen of the same species and size as that originally planted unless a different species is otherwise approved by the relevant planning authority.
- (4) Any other tree or shrub planted as part of an approved landscaping management scheme that, within a period of five years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased must be replaced in the first available planting season with a specimen of the same species and size as that originally planted unless a different species is otherwise agreed in writing with the relevant planning authority.
Code of construction practice
20
- (1) No stage of the onshore transmission works may commence until for that stage a code of construction practice has been submitted to and approved by the relevant planning authority, in consultation with Norfolk County Council, the Environment Agency, and Natural England.
- (2) The code of construction practice must accord with the outline code of construction practice and include details, as appropriate to the relevant stage, on—
- (a) relevant health, safety and environmental legislation and compliance;
- (b) local community liaison responsibilities;
- (c) artificial light emissions;
- (d) contaminated land and groundwater;
- (e) construction noise and vibration;
- (f) soil management;
- (g) construction method statements;
- (h) site and excavated waste management;
- (i) construction surface water and drainage;
- (j) materials management;
- (k) screening, fencing and site security;
- (l) air quality;
- (m) invasive species management; and
- (n) proposals for managing public rights of way.
- (3) The code of construction practice approved in relation to the relevant stage of the onshore transmission works must be followed in relation to that stage of the onshore transmission works.
- (4) Pre-commencement screening, fencing and site security works must only take place in accordance with a specific plan for such pre-commencement works which must accord with the relevant details for screening, fencing and site security set out in the outline code of construction practice, and which has been submitted to and approved by the relevant local authority.
Traffic
21
- (1) No stage of the onshore transmission works may commence until for that stage the following plans, as appropriate for the relevant stage, have for that stage been submitted to and approved by the relevant planning authority in consultation with the highway authority—
- (a) a traffic management plan which must be in accordance with the outline traffic management plan;
- (b) a travel plan which must be in accordance with the outline travel plan; and
- (c) an access management plan which must be in accordance with the outline access management plan.
- (2) The plans approved under paragraph (1) must be implemented upon commencement of the relevant stage of the onshore transmission works.
- (3) If any of the accesses identified in the outline access management plan are required for pre-commencement archaeological investigations, a specific plan for such accesses which must accord with the relevant details set out in the outline access management plan must be submitted to and approved by the relevant planning authority, in consultation with the highway authority, prior to the construction and use of such accesses. The accesses identified must be constructed and used in accordance with the details contained in the specific plan so approved.
- (4) Following the making of the Hornsea Three Offshore Wind Farm Development Consent Order, and notwithstanding the requirement of sub-paragraph (a) of paragraph (1) above, the traffic management plan shall include, in respect of Link 34 as referred to in the Environmental Statement, revised details of a scheme of traffic mitigation which shall be submitted to, and approved in writing by, the relevant planning authority, in consultation with the highway authority.
- (5) Following the making of the Norfolk Boreas Development Consent Order if, in respect of Link 34, the Norfolk Boreas Outline Traffic Management Plan materially differs from the outline traffic management plan, the traffic management plan must include, in respect of Link 34, traffic mitigation which is consistent with the Norfolk Boreas Outline Traffic Management Plan but only to the extent that such mitigation is capable of being accommodated within the Order limits and does not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
Highway accesses
22
- (1) The access management plan submitted for approval under Requirement 21(1)(c) must include details of the siting, design, layout and any access management measures for any new, permanent or temporary means of access (including, where relevant, details of reinstatement measures) to a highway to be used by vehicular traffic, or any alteration to an existing means of access to a highway used by vehicular traffic.
- (2) The highway accesses for each stage of the onshore transmission works must be constructed or altered and the works described in paragraph (1) above in relation to access management measures must be carried out, as the case may be, in accordance with the approved details before they are brought into use for the purposes of the authorised project.
Archaeological written scheme of investigation
23
- (1) No stage of the onshore transmission works may commence until for that stage an archaeological written scheme of investigation (which accords with the outline written scheme of investigation (onshore)) has, after consultation with Norfolk County Council and Historic England, been submitted to and approved by the relevant planning authority.
- (2) In the event that archaeological site investigation is required, the scheme must include details of the following—
- (a) an assessment of significance and research questions; ...
- (b) the programme and methodology of site investigation and recording;
- (c) the programme for post investigation assessment;
- (d) provision to be made for analysis of the site investigation and recording;
- (e) provision to be made for publication and dissemination of the analysis and records of the site investigation;
- (f) provision to be made for archive deposition of the analysis and records of the site investigation; and
- (g) nomination of a competent person or persons/organisation to undertake the works set out within the written scheme of investigation.
- (3) Any archaeological site investigation, archaeological works or watching brief must be carried out in accordance with the approved scheme.
- (4) Pre-commencement surveys, site preparation works and archaeological investigations must only take place in accordance with a specific written scheme of investigation which is in accordance with the details set out in the outline written scheme of investigation (onshore), and which has been submitted to and approved by the relevant local authority.
Ecological management plan
24
- (1) No stage of the onshore transmission works may commence until for that stage a written ecological management plan (which accords with the outline landscape and ecological management strategy as appropriate for the relevant stage) has been submitted to and approved by the relevant planning authority in consultation with Natural England. The ecological management plan must be informed by post consent ecological surveying of previously un-surveyed areas for the relevant stage.
- (2) The ecological management plan must include an implementation timetable and must be carried out as approved.
- (3) Pre-commencement site clearance works must only take place in accordance with a specific ecological management plan for site clearance works which is in accordance with the relevant details for site clearance works set out in the outline landscape and ecological management strategy, and which has been submitted to and approved by the relevant local authority. The plan for site clearance works must be informed by post consent ecological surveying of previously un-surveyed areas for the relevant stage referred to in the plan.
- (4) Construction works within 5km of the Broadland Special Protection Area and Ramsar site must be carried out in accordance with the mitigation relating to onshore ornithology contained in paragraphs 227 to 230 of the outline landscape and ecological management strategy, which must be incorporated into the ecological management plan.
Watercourse crossings
25
- (1) No stage of the onshore transmission works involving the crossing, diversion and subsequent reinstatement of any designated main river or ordinary watercourse may commence until a scheme and programme for any such crossing, diversion and reinstatement in that stage has been submitted to and, approved by the relevant planning authority in consultation with Norfolk County Council, the Environment Agency, relevant drainage authorities and Natural England.
- (2) The designated main river or ordinary watercourse must be crossed, diverted and subsequently reinstated in accordance with the approved scheme and programme.
- (3) Unless otherwise permitted under paragraph (1), throughout the period of construction of the onshore transmission works, all ditches, watercourses, field drainage systems and culverts must be maintained such that the flow of water is not impaired or the drainage onto and from adjoining land rendered less effective.
Construction hours
26
- (1) Construction work for the onshore transmission works must only take place between 0700 hours and 1900 hours Monday to Friday, and 0700 hours to 1300 hours on Saturdays, with no activity on Sundays or bank holidays, except as specified in paragraphs (2) to (4).
- (2) Outside the hours specified in paragraph (1), construction work may be undertaken for essential activities including but not limited to—
- (a) continuous periods of operation that are required as assessed in the environmental statement, such as concrete pouring, drilling, and pulling cables (including fibre optic cables) through ducts;
- (b) delivery to the onshore transmission works of abnormal loads that may otherwise cause congestion on the local road network;
- (c) works required that may necessitate the temporary closure of roads;
- (d) onshore transmission works requiring trenchless installation techniques;
- (e) onshore transmission works at the landfall;
- (f) commissioning or outage works associated with the extension to the Necton National Grid substation comprised within Work No. 10A;
- (g) commissioning or outage works associated with the overhead line modification works comprised within Work No. 11 and Work No. 11A;
- (h) electrical installation; and
- (i) emergency works.
- (3) Outside the hours specified in paragraph (1), construction work may be undertaken for non-intrusive activities including but not limited to—
- (a) fitting out works within the onshore project substation buildings comprised within Work No. 8A; and
- (b) daily start up or shut down;
- (4) Save for emergency works, full details, including but not limited to type of activity, vehicle movements and type, timing and duration and any proposed mitigation, of all essential construction activities under paragraph (2) and undertaken outside the hours specified in paragraph (1) must be agreed with the relevant planning authority in writing in advance, and must be carried out within the agreed time.
- (5) No crushing or screening works must take place at any time on any of the mobilisation areas, without the prior written consent of the relevant planning authority.
Control of noise during operational phase and during maintenance
27
- (1) The noise rating level for the use of Work No. 8A and during maintenance must not exceed 35dB LAeq, (5 minutes) at any time at a free field location immediately adjacent to any noise sensitive location.
- (2) The noise rating level for the use of Work No. 8A and during maintenance must not exceed 32 dB LLeq (15 minutes) in the 100Hz third octave band at any time at a free field location immediately adjacent to any noise sensitive location.
- (3) Work No. 8A must not commence operation until a scheme for monitoring compliance with the noise rating levels set out in paragraphs (1) and (2) above has been submitted to and approved by the relevant planning authority. The scheme must include identification of suitable monitoring locations (and alternative surrogate locations if appropriate) and times when the monitoring is to take place to demonstrate that the noise levels have been achieved after both initial commencement of operations and six months after Work No. 8A is at full operational capacity. Such measurements must be submitted to the relevant planning authority no later than 28 days following completion to confirm the rating level of operational noise emissions do not exceed the levels specified in sub-paragraphs (1) and (2), including details of any remedial works and a programme of implementation should the emissions exceed the stated levels.
- (4) The monitoring scheme must be implemented as approved.
European protected species onshore
28
- (1) No stage of the onshore transmission works may commence until final pre-construction survey work has been carried out to establish whether a European protected species is present on any of the land affected, or likely to be affected, by that stage of the onshore transmission works or in any of the trees to be lopped or felled as part of that stage of the onshore transmission works.
- (2) Where a European protected species is shown to be present, the relevant part(s) of the onshore transmission works must not begin until, after consultation with Natural England and the relevant planning authority, a scheme of protection and mitigation measures has been submitted to and approved by the relevant planning authority. The onshore transmission works must be carried out in accordance with the approved scheme.
- (3) “European protected species” has the same meaning as in regulations 42 and 46 of the Conservation of Habitats and Species Regulations 2017[^f00045].
Onshore decommissioning
29
- (1) Within six months of the permanent cessation of commercial operation of the onshore transmission works an onshore decommissioning plan must be submitted to the relevant planning authority for approval.
- (2) The onshore decommissioning plan must be implemented as approved.
- (3) The undertaker must notify the relevant planning authority in writing of the permanent cessation of commercial operation of the onshore transmission works within 28 days of such permanent cessation.
Requirement for written approval
30
Where under any of the above requirements the approval or agreement of the Secretary of State, the relevant planning authority or another person is required, that approval or agreement must be given in writing.
Amendments to approved details
31
- (1) With respect to any requirement which requires the authorised project to be carried out in accordance with the details approved by the relevant planning authority or another person, the approved details must be carried out as approved unless an amendment or variation is previously agreed in writing by the relevant planning authority or that other person in accordance with paragraph (2).
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.