The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022
- (2) The powers conferred by article 25 (temporary use of land for construction of works) cease at the end of the period referred to in paragraph (1), except that nothing in this paragraph prevents Network Rail remaining in possession of land after the end of that period, if the land was entered and possession was taken before the end of that period.
PART 4 — MISCELLANEOUS AND GENERAL
Powers to transfer undertaking
31
- (1) Network Rail may—
- (a) transfer to another person (the “transferee”) its right to construct, maintain, use or operate the authorised works (or any part of them) and such related statutory rights and powers as may be agreed in writing between Network Rail and the transferee; or
- (b) grant to another person (the “lessee”) for a period agreed in writing between Network Rail and the lessee the right to construct, maintain, use or operate the authorised works (or any part of them) and such related statutory rights and powers as may be so agreed.
- (2) Where an agreement has been made in accordance with paragraph (1) references in this Order to Network Rail, except in paragraph (1), include references to the transferee or lessee.
- (3) The exercise by a person of the rights or powers conferred by any enactment by any person in pursuance of any transfer or grant under paragraph (1) is subject to the same restrictions, liabilities and obligations as would apply under this Order if those rights or powers were exercised by Network Rail.
- (4) The consent of the Secretary of State is required for the exercise of the powers of paragraph (1).
Defence to proceedings in respect of statutory nuisance
32
- (1) Where proceedings are brought under section 82(1) (summary proceedings by person aggrieved by statutory nuisance) of the Environmental Protection Act 1990[^f00051] in relation to a nuisance falling within paragraph (g) of section 79(1)[^f00052] of that Act (noise emitted from premises so as to be prejudicial to health or a nuisance) no order is to be made, and no fine may be imposed, under section 82(2) of that Act if the defendant shows—
- (a) that the nuisance relates to premises used by Network Rail for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to the authorised works and that the nuisance is attributable to the carrying out of the authorised works which are being carried out in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61[^f00053] (prior consent for work on construction sites) or section 65[^f00054] (noise exceeding registered level), of the Control of Pollution Act 1974[^f00055]; or
- (b) that the nuisance is a consequence of the construction, operation or maintenance of the authorised works and that it cannot reasonably be avoided.
- (2) Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 and section 65(8) of that Act (corresponding provision in relation to consent for registered noise level to be exceeded), do not apply where the consent relates to the use of premises by Network Rail for the purposes of or in connection with the exercise of the powers conferred by this Order with respect to works.
- (3) In proceedings for an offence under section 80(4) of the Environmental Protection Act 1990 (offence of contravening abatement notice) in respect of a statutory nuisance falling within section 79(1)(g) or (ga)[^f00056] of that Act where the offence consists of contravening requirements imposed by virtue of section 80(1)(a) or (b)[^f00057] of that Act, it is a defence to show that the nuisance—
- (a) is a consequence of the construction, operation or maintenance of the works authorised by this Order; and
- (b) cannot reasonably be avoided.
- (4) The provisions of this article do not affect the application to the authorised works of section 122 (statutory authority as a defence to actions in nuisance, etc.) of the Railways Act 1993[^f00058] or any rule of common law having similar effect.
Power to lop trees overhanging the authorised works
33
- (1) Network Rail may fell or lop any tree or shrub near any part of the authorised works, or cut back its roots, if it reasonably believes it to be necessary to do so to prevent the tree or shrub—
- (a) from obstructing or interfering with the construction, maintenance or operation of the authorised works or any apparatus used on the authorised works; or
- (b) from constituting a danger to passengers or other persons using the authorised works.
- (2) In exercising the powers conferred by paragraph (1), Network Rail must not cause unnecessary damage to any tree or shrub and must pay compensation to any person for any loss or damage arising from the exercise of those powers.
- (3) Any dispute as to a person’s entitlement to compensation under paragraph (2), or as to the amount of compensation, is to be determined as if it were a dispute under Part 1 of the 1961 Act.
Power to operate and use railway
34
- (1) Network Rail may operate and use the railway and other authorised works as a system, or part of a system, of transport for the carriage of passengers and goods and any connected ancillary purposes.
- (2) Nothing in this Order, or in any enactment incorporated with or applied by this Order, affects the operation of Part 1 (the provision of railway services) of the Railways Act 1993.
Planning permission and supplementary powers
35
- (1) Planning permission which is deemed by a direction under section 90(2A)[^f00059] (development with government authorisation) of the 1990 Act to be granted in relation to the authorised works is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as not being operational land) of that Act.
- (2) In relation to the application of paragraph 3(c) of the Second Schedule of the Form of Tree Preservation Order set out in the Schedule to the Town and Country Planning (Tree Preservation Order) Regulations 1969[^f00060] (including that paragraph as applied by regulation 3(ii) of the Town and Country Planning (Tree Preservation Order) (Amendment) and (Trees in Conservation Areas) (Exempted Cases) Regulations 1975[^f00061], or as incorporated in any tree preservation order) any direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works is to be treated as deeming the permission to have been granted on application made under Part 3 of that Act for the purposes of that Part.
- (3) In relation to the application of article 5(1)(d) of the Form of Tree Preservation Order set out in the Schedule to the Town and Country Planning (Trees) Regulations 1999[^f00062] as incorporated in any tree preservation order or as having effect by virtue of regulation 10(1)(a) of those Regulations, any direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works is not to be treated as an outline planning permission.
- (4) In relation to the application of article 3(1) of the Form of Tree Preservation Order set out in the Schedule to the Town and Country Planning (Tree Preservation) (England) Regulations 2012[^f00063], as incorporated in any tree preservation order or as having effect by virtue of regulation 7 of those Regulations or Section 193 of the Planning Act 2008[^f00064] any direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works is to be treated as deeming permission to have been granted on application under regulation 17(1)(a) of those Regulations.
- (5) The AstraZeneca conditions, University conditions, Countryside condition and CBC/CML conditions have no effect within the Order limits.
- (6) To the extent that the carrying out of any development in accordance with a direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works prevents any development permitted by the AstraZeneca permission (whether or not within the Order limits) from being carried out in accordance with any of the AstraZeneca conditions, then to that extent—
- (a) there is deemed to be no breach of the AstraZeneca conditions concerned; and
- (b) no enforcement action may be taken in respect of the development carried out under the AstraZeneca permission.
- (7) To the extent that the carrying out of any development in accordance with a direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works prevents any development permitted by the University permission (whether or not within the Order limits) from being carried out in accordance with any of the University conditions, then to that extent—
- (a) there is deemed to be no breach of University conditions concerned; and
- (b) no enforcement action may be taken in respect of the development carried out under the University permission.
- (8) To the extent that the carrying out of any development in accordance with a direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works prevents any development permitted by the Countryside permission (within the Order limits) from being carried out in accordance with the Countryside condition, then to that extent—
- (a) there is deemed to be no breach of Countryside condition concerned; and
- (b) no enforcement action may be taken in respect of the development carried out under the Countryside permission.
- (9) To the extent that the carrying out of any development in accordance with a direction under section 90(2A) of the 1990 Act deeming planning permission to be granted in relation to the authorised works prevents any development permitted by the CBC/CML permission 1 and/or the CBC/CML permission 2 (within the Order limits) from being carried out in accordance with the CBC/CML conditions, then to that extent—
- (a) there is deemed to be no breach of CBC/CML conditions concerned; and
- (b) no enforcement action may be taken in respect of the development carried out under the CBC/CML permission1 and/or CBC/CML permission2.
- (10) In this article—
- “the AstraZeneca conditions” mean conditions 42 and 45 of the AstraZeneca permission;
- “the AstraZeneca permission” means the outline planning permission granted by Cambridge City Council on 5 March 2015 and given reference number 14/2094/S73 (amending the outline planning permission granted by Cambridge City Council on 15 October 2009 and given reference number 06/0796/OUT) with reserved matters approved by Cambridge City Council under the reference numbers 14/1633/REM, 19/1070/REM and 20/05027/REM and any subsequent permission under section 73 of the 1990 Act or any non-material amendment to any of those permissions and approvals;
- “the CBC/CML conditions” means conditions 15 to 21 and 42 to 44 of the CBC/CML permission 1 and conditions 32, 38 and 49 of the CBC/CML permission 2;
- “the CBC/CML permission 1” means the outline planning permission granted by Cambridge City Council on 2 April 2015 and given reference number 14/1691/S73;
- “the CBC/CML permission 2” means the outline planning permission granted by Cambridge City Council on 5 September 2017 and given reference number 16/0176/OUT;
- “the Countryside condition” means condition 11 of the Countryside permission;
- “the Countryside permission” means the outline planning permission granted by Cambridge City Council on 6 August 2010 and given reference 07/620 OUT with reserved matters 15/1829/REM and any further permission under section 73 of the 1990 Act or any non-material amendment to those permissions and approvals;
- “the University conditions” means mean conditions 42 to 47 of the University permission; and
- “the University permission” means the outline planning permission granted by Cambridge City Council on 5 March 2015 and given reference number 14/2094/S73 (amending the outline planning permission granted by Cambridge City Council on 15 October 2009 and given reference 06/0796/OUT), together with reserved matters approved by Cambridge City Council under reference number 16/0653/REM and any subsequent permission under section 73 of the 1990 Act or any non-material amendments approved in relation to any of the aforementioned permissions and approvals.
Public open space
36
- (1) Network Rail must not under the powers of this Order vest any part of the existing open space until Network Rail has vested of so much of the replacement land as is equivalent in area to the amount of the existing open space that is required by Network Rail for the authorised works.
- (2) Upon Network Rail vesting so much of the existing open space as is required for the authorised works that land is discharged from all rights, trusts and incidents to which it was previously subject.
- (3) Network Rail must lay out as replacement land (being so much of the replacement land which has been vested under paragraph (1)) before the existing open space has been permanently vested under paragraph (1).
- (4) As soon as Cambridge City Council has certified that the land referred to in paragraph (3) has been laid out to its reasonable satisfaction that land is to vest (or be offered for vesting) in the relevant trustees of the Pemberton Trust and Cambridge City Council subject to the like rights, trusts and incidents attached to so much of the existing open space which has been vested under paragraph (1).
- (5) In this article—
- (a) “the existing open space” means the land described as open space land and delineated orange on the deposited plan titled “Open Space and Exchange Land”;
- (b) “the relevant Trustees of the Pemberton Trust” means the freehold owner or owners (or any successor) of the existing open space as comprised in Plots 003,004a, 004b, 005a, 006b, 007, 014, 084a, 086 as further detailed in the Book of Reference; and
- (c) “the replacement land” means the land described as Exchange Land and delineated green on the deposited plan titled “Open Space and Exchange Land”.
Obstruction of construction of authorised works
37
Any person who, without reasonable excuse—
- (a) obstructs any person acting under the authority of Network Rail in setting out the lines of the scheduled works or in constructing any authorised work; or
- (b) interferes with, moves or removes any apparatus belonging to any person acting under the authority of Network Rail,
is guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale.
Disclosure of confidential information
38
- (1) A person who—
- (a) enters a factory, workshop or workplace under the provisions of article 17 (protective works to buildings) or article 18 (power to survey and investigate land); and
- (b) discloses to any person any information obtained as a result of that entry and relating to any manufacturing process or trade secret,
is guilty of an offence and liable on summary conviction to a fine not exceeding level 3 on the standard scale unless the disclosure is made in the course of that person’s performance of a duty in connection with the purposes for which the person was authorised to enter the land.
Statutory undertakers etc.
39
The provisions of Schedule 11 (provisions relating to statutory undertakers etc. on land acquired) have effect.
Certification of plans etc.
40
Network Rail must, as soon as practicable after the making of this Order, submit copies of the book of reference, the deposited sections and the deposited plans to the Secretary of State for certification that they are, respectively, true copies of the book of reference, the deposited sections and the deposited plans referred to in this Order; and a document so certified is admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Service of notices
41
- (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
- (a) by post; or
- (b) with the consent of the recipient and subject to paragraphs (6) to (8) by electronic transmission.
- (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
- (3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978[^f00065] as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address, and otherwise—
- (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body; and
- (b) in any other case, the last known address of that person at the time of service.
- (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having any interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
- (a) addressing it to that person by name or by the description of “owner”, or as the case may be “occupier”, of the land (describing it); and
- (b) either leaving it in the hands of a person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
- (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is taken to be fulfilled where the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission either in writing or by electronic transmission.
- (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within 7 days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
- (7) Any consent to the use of electronic communication given by a person may be revoked by that person in accordance with paragraph (8).
- (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
- (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
- (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than 7 days after the date on which the notice is given.
- (9) This article does not exclude the employment of any method of service not expressly provided for by it.
Protection of interests
42
Schedule 12 (protective provisions) has effect.
No double recovery
43
Compensation is not payable in respect of the same matter both under this Order and under any other enactment, any contract or any rule of law.
Arbitration
44
Any difference under any provision of this Order, unless otherwise provided for, must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.
SCHEDULE 1 — SCHEDULED WORKS
In the County of Cambridgeshire, City of Cambridgeshire and District of South Cambridgeshire
In the County of Cambridgeshire, City of Cambridge—
Work No. 1 – A railway (Down Cambridge Loop Line) (580 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.
Work No. 2 – A railway (Up Cambridge Loop Line) (586 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing 20 metres north of Long Road (A1134) overbridge and terminating at Work No.3.
Work No. 3 – A new station (Cambridge South) located directly south of the (Guided Busway) overbridge consisting four new platforms and associated railway lines, a station footbridge with stairs and lifts, high level concourse, eastern and western entrance buildings with ticketing and staffing facilities and associated forecourt areas and a secondary means of escape footbridge.
Work No. 4 – A new path (pedestrian and cycling) (378 metres in length) commencing at the Guided Busway route on the west side of Hobson’s Park and terminating at Work No. 3.
Work No. 5 – A new pedestrian path (96 metres in length) including an at grade crossing over the Guided Busway commencing at Work No.4 in Hobson’s Park and terminating 96 metres on the north of its commencement on the north of the Guided Busway route within the Active Recreation Area.
Work No. 6 – A railway (Down Cambridge Loop Line) (448 metres in length) on the western side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 110 metres south of Addenbrookes Road (Nine Wells) overbridge, railway systems compound, drainage works and features.
Work No. 7 – A railway (Up Cambridge Loop Line) (447 metres in length) on the eastern side of the course of the existing railway (Bethnal Green to King’s Lynn line) commencing at Work No.3 and terminating 108 metres south of Addenbrookes Road (Nine Wells) overbridge.
In the County of Cambridgeshire, District of South Cambridgeshire, Parish of Great Shelford—
Work No. 8 – Realignment of the railway (Down Shepreth Branch Line) (1036 metres in length) on the western side of the existing railway commencing 775 metres south of Addenbrookes Road (Nine Wells) overbridge and terminating 25 metres east of Cambridge Road overbridge, works include the relocation of the existing telecommunications mast and associated equipment and the installation of a new equipment building.
Work No. 9 – A crossover (138 metres in length) between the Up and Down railway lines of the existing railway (Bethnal Green to King’s Lynn line) commencing 35 metres south of Dukes No.2 Level Crossing and terminating 138 metres south of its commencement.
Work No. 10 – Realignment of the railway (Up Shepreth Branch Line) (502 metres in length) on the eastern side of the existing railway commencing 200 metres north of Webster Level Crossing and terminating 25 metres east of Cambridge Road overbridge.
In the County of Cambridgeshire, City of Cambridge and District of South Cambridgeshire, Parish of Great Shelford—
Work No. 11 – Agricultural accommodation bridge over the Hobson’s Brook 420m west of the railway, commencing at a point 25 metres south of Addenbrookes Road and terminating at a point 82 metres south of its commencement.
SCHEDULE 2 — ANCILLARY ACQUISITION OF LAND
| (1) Area | (2) Number of land shown on the deposited plan | (3) Purposes for which land may be acquired |
|---|---|---|
| In the County of Cambridgeshire, City of Cambridge | 1a | Maintenance access for railway infrastructure |
| 31 | Sub soil to install soil nails and anchors together with associated ground stabilisation works | |
| The District of South Cambridgeshire | 92 | Replacement land for existing open space |
SCHEDULE 3 — LAND IN WHICH ONLY NEW RIGHTS ETC., MAY BE ACQUIRED
| (1) Area | (2) Number of land shown on the deposited plan | (3) Purposes for which rights may be acquired |
|---|---|---|
| In the County of Cambridgeshire, City of Cambridge | 2, 8 | Access for maintenance of authorised works and placing of equipment/use as worksite in those places marked “c” on the deposited plans. |
| 8a | Right to access the Replacement land for existing open space and to grant permissive right of access to the public and right of access including for authorised users | |
| 18, 19 and 24 | Access for maintenance of authorised works | |
| 20, 21, 22, 29, 30, 37, 38, 44 | To pass and repass over Francis Crick Avenue and Robinson Way for purposes to access the station for Network Rail and its licensees, and access for construction of authorised works including construction of new station access and maintenance of authorised works. | |
| 42, 43, 45a | Emergency egress and safe passage from the station for Network Rail and its licensees | |
| 41a, 45c, 59 and 60 | Access for maintenance of the authorised works. | |
| In the County of Cambridgeshire, District of South Cambridgeshire | 84 | Permanent drainage right/easement |
| 95 | Access for maintenance of authorised works and placing of equipment/use as worksite in those places marked “c” on the deposited plan. | |
| 100 and 101 | Access for maintenance of the authorised works. | |
SCHEDULE 4 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1) Area | (2) Number of land shown on the deposited plans | (3) Purpose for which temporary possession may be taken | (4) Relevant part of the authorised works |
|---|---|---|---|
| In the County of Cambridgeshire, City of Cambridge | 1, 12, 13, 15a, 16, 17, 25, 26 and 28 | Access for construction and works site | Work Nos. 1 and 2 |
| 2 | Access for construction, works site, and construction compound. | Work Nos. 1 and 2 | |
| 4, 5, 4d, 4e, 4f, 4g and 6a | Access for construction and works site, accommodation works, landscaping, drainage works. | Work Nos. 4 and 5 | |
| 6, 8, 8a and 10 | Access for construction, works site, accommodation works, landscaping works, drainage works, environmental mitigation, works compound, temporary storage of materials. | Work Nos. 1, 3, 4, 6, 7 and 11 | |
| 11, 84b (part), 85, 87, 88 (part), 90 and 91 (part) | Access for construction, works site and accommodation works, landscaping and drainage works. | Work Nos. 6, 7 and 11. | |
| 41,41a, 45, 45a, 45b, 45c, 46, 49, 51, 53, 55, 56 and 57 | Access for construction, works site, accommodation works, landscaping works and drainage works. | Work Nos. 3, 6 and 7 | |
| 54a, 59, 60, 61, 62, 63, 64, 65, 66, 67 and 68 | Access for construction, works site, accommodation works, works compound, landscaping works, environmental mitigation, drainage works and works for temporary diversion of National Cycle Network Route 11 and Genome path. | Work Nos. 3, 6 and 7 | |
| In the County of Cambridgeshire, District of South Cambridgeshire | 69, 76, 77, 78, 79, 80, 81, 82 and 83 | Access for construction, works site, accommodation works, works compound, landscaping works, environmental mitigation, drainage works and works for temporary diversion of National Cycle Network Route 11 and Genome path. | Work Nos. 3, 6 and 7 |
| 84, 84b (part), 88 (part), 91 (part), 93 and 94 | Access for construction, works site and accommodation works, landscaping and drainage works. | Work Nos. 6, 7, and 11 | |
| 95 | Access for construction (including protective measures/works for scheduled ancient monument) works site and compound. | Work Nos. 8, 9 and 10 | |
| 99 | Access for construction, works site, accommodation works and drainage works. | Work Nos. 8, 9 and 10 | |
| 97, 100, 101, 105, 106 and 107 | Access for construction, works site and accommodation works | Work Nos. 8 and 10 | |
SCHEDULE 5 — CLOSURE OF LEVEL CROSSINGS
| (1) Area | (2) Level crossings to be discontinued | (3) Alternative |
|---|---|---|
| In the County of Cambridgeshire, District of South Cambridgeshire | Dukes No.2 level crossing at the point marked with a blue line on sheet 4 of the deposited plans | Work No. 11 |
| In the County of Cambridgeshire, District of South Cambridgeshire | Websters level crossing at point marked with a blue line on sheet 5 on the deposited plans | Work No. 11 |
SCHEDULE 6 — STREETS SUBJECT TO ALTERATION OF LAYOUT
| (1) Area | (2) Street subject to alteration of layout | (3) Description of alteration |
|---|---|---|
| In the County of Cambridgeshire, City of Cambridge | Francis Crick Avenue | Traffic signal modifications for station access and widen existing pedestrian/cycle crossing |
SCHEDULE 7 — STREETS SUBJECT TO STREET WORKS
| (1) Area | (2) Streets subject to street works |
|---|---|
| In the County of Cambridgeshire, City of Cambridge | Access road off Long Road within plot 1 |
| Addenbrooke’s Road | |
| Francis Crick Avenue | |
| Robinson Way | |
| In the District of South Cambridgeshire | Granham’s Road |
SCHEDULE 8 — STREETS TO BE TEMPORARILY STOPPED UP OR DIVERTED
| (1) Area | (2) Street to be temporarily stopped up | (3) Extent of temporary stopping up or diversion |
|---|---|---|
| In the County of Cambridgeshire, District of South Cambridgeshire Parish of Great Shelford | Footpath 198/1 | Between points P1 and P2 (on sheet 5 of the deposited plans) |
| National Cycle Network Route 11 | Between points W1 and W2 (on sheet 5 of the deposited plans) | |
| In the County of Cambridgeshire, City of Cambridgeshire | Route known as the Genome Path | Temporarily stopped up between points Y1 and Y2 and temporary diversion over the route delineated between points Z1, Z2 and Z3 (on sheet 3 of the deposited plans.) |
| National Cycle Route 11 | Temporarily stopped up between points X1 and X2 and temporarily diverted between points Z1, Z2 and Z3 (on sheet 3 of the deposited plans). | |
| Long Road access track | Between points L1 and L2 (on Sheet 1 of the deposited plans). | |
SCHEDULE 9 — ACCESS TO WORKS
| (1) Area | (2) Description of Access |
|---|---|
| In the County of Cambridgeshire, City of Cambridge | Improvement and widening of the access off Long Road marked A1 on sheet 1 of the deposited plans |
| Creation of new temporary vehicular access off Francis Crick Avenue marked A2 on sheet 2 the deposited plans | |
| Creation of new vehicular access to Cambridge South station off Francis Crick Avenue marked A3 on sheet 2 the deposited plans | |
| Widening and improvement of access off Addenbrookes Road roundabout with the National Cycle Network marked A4 on sheet 3 of the deposited plans | |
| Widening and improvement of access off Addenbrookes Road roundabout leading to the pumping station at a point marked A5 on sheet 3 of the deposited plans | |
| In the County of Cambridgeshire, District of South Cambridgeshire | Widening and improvement of access and visibility splay works at Granhams Road marked A6 on sheet 5 of the deposited plans |
| Widening and improvement of access at Addenbrookes Road marked A7 on sheet 6 of the deposited plans |
SCHEDULE 10 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply with the necessary modifications as respects compensation in the case of a compulsory acquisition under this Order of a right by the creation of a new right as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation on the scope of paragraph (1), the 1961 Act has effect subject to the following modification set out in sub-paragraph (2).
- (2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—
(5A) If— (a) the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 10 to the Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (“the 2022 Order”); (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 10 to the 2022 Order) to acquire an interest in the land; and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.
3
- (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973[^f00066] has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
- (a) for “land is acquired or taken” substitute “a right over land is purchased”; and
- (b) for “acquired or taken from him” substitute “over which the right is exercisable”.
Application of Part 1 of the 1965 Act
4
Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by article 20 (application of Part 1 of the 1965 Act) to the acquisition of land under article 19 (power to acquire land), applies to the compulsory acquisition of rights under article 22(1) or 22(2) (power to acquire new rights)—
- (a) with the modification specified in paragraph 5; and
- (b) with such other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows.
- (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired; or
- (b) the land over which the right is or is to be exercisable.
- (3) For section 7 (measure of compensation in the case of severance) of the 1965 Act substitute—
(7) In assessing the compensation to be paid by the acquiring authority under this Act regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired is depreciated by the acquisition of the right, but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
- (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land)—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired is vested absolutely in the acquiring authority.
- (5) Section 11[^f00067] (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right, as well as the notice of entry required by subsection (1) of that section (as it applies to a compulsory acquisition under article 20(1)), it has power, exercisable in the equivalent circumstances and subject to the equivalent conditions, to enter for the purpose of exercising that right; and sections 11A[^f00068] (powers of entry: further notices of entry), 11B[^f00069] (counter-notice requiring possession to be taken on specified date), 12[^f00070] (unauthorised entry) and 13[^f00071] (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly.
- (6) Section 20[^f00072] (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act (as modified by article 20(7)) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
- (8) For Schedule 2A to the 1965 Act substitute—
SCHEDULE 2A (1) (1) This Schedule applies where an acquiring authority serves a notice to treat in respect of a right over the whole or part of a house, building or factory. (2) But see article 23 (power to acquire subsoil or airspace only) of the Network Rail (Cambridge South Infrastructure Enhancements) Order 2022, which excludes the acquisition of subsoil or airspace only from this Schedule. (2) In this Schedule “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The authority must serve notice of its decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the authority decides to refer the counter-notice to the Upper Tribunal it must do so within the decision period. (8) If the authority does not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the authority serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right, (b) the proposed use of the right to be acquired, and (c) if the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 11 — PROVISIONS RELATING TO STATUTORY UNDERTAKERS ETC. ON LAND ACQUIRED
Apparatus of statutory undertakers etc. on land acquired
1
- (1) Sections 271 to 274[^f00073] (power to extinguish rights of statutory undertakers etc., and power of statutory undertakers etc. to remove or re-site apparatus) of the 1990 Act apply in relation to any land acquired or appropriated by Network Rail under this Order subject to the following provisions of this paragraph; and all such other provisions of that Act as apply for the purposes of those provisions (including sections 275 to 278, which contain provisions consequential on the extinguishment of any rights under sections 271 and 272, and sections 279(2) to (4), 280 and 282[^f00074], which provide for the payment of compensation) have effect accordingly.
- (2) In the provisions of the 1990 Act, as applied by sub-paragraph (1), references to the appropriate Minister are references to the Secretary of State.
- (3) Where any apparatus of public utility undertakers or of a public communications provider is removed in pursuance of a notice or order given or made under section 271, 272 or 273 of the 1990 Act, as applied by sub-paragraph (1), any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
- (4) Sub-paragraph (3) does not apply in the case of the removal of a public sewer but where such a sewer is removed in pursuance of such a notice or order as is mentioned in that sub-paragraph, any person who is—
- (a) the owner or occupier of premises the drains of which communicated with that sewer; or
- (b) the owner of a private sewer which communicated with that sewer,
is entitled to recover from Network Rail compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
- (5) The provisions of the 1990 Act mentioned in sub-paragraph (1), as applied by that sub-paragraph, do not have effect in relation to apparatus as respects which paragraph 2, or Part 3 of the 1991 Act, applies.
- (6) In this paragraph—
- “public communications provider” has the same meaning as in section 151(1) of the 2003 Act; and
- “public utility undertakers” has the same meaning as in the 1980 Act[^f00075].
SCHEDULE 12 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
Application
1
For the protection of the undertakers referred to in this Part of this Schedule the following provisions have effect unless otherwise agreed in writing between Network Rail and the undertaker concerned.
2
The provisions of paragraph 1 of Schedule 11 (provisions relating to statutory undertakers etc. on land acquired), in so far as they relate to the removal of apparatus, do not apply in relation to apparatus to which this Part of this Schedule applies.
3
This Part of this Schedule does not apply to apparatus in respect of which the relations between Network Rail and the undertaker are regulated by the provisions of Part 3 of the 1991 Act.
Interpretation
4
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means— in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989[^f00076]) belonging to or maintained by that undertaker; in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply; in the case of a water undertaker, mains, pipes or other apparatus belonging to or maintained by that undertaker for the purposes of water supply; and in the case of a sewerage undertaker— any drain or works vested in the undertaker under the Water Industry Act 1991; and any sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) of that Act or an agreement to adopt made under section 104 of that Act, and includes a sludge main, disposal main (within the meaning of section 219 of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plans” includes sections, drawings, specifications and method statements; and
- “undertaker” means— any licence holder within the meaning of Part 1 of the Electricity Act 1989; a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00077]; a water undertaker within the meaning of the Water Industry Act 1991; and a sewerage undertaker within the meaning of Part 1 of the Water Industry Act 1991,
for the area of the authorised works, and in relation to any apparatus, means the undertaker to whom it belongs or by whom it is maintained.
Acquisition of apparatus
5
Regardless of any provision in this Order or anything shown on the deposited plans, Network Rail must not acquire any apparatus otherwise than by agreement.
Alternative apparatus
6
- (1) If, in the exercise of the powers conferred by this Order, Network Rail acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of an undertaker to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed and is in operation to the reasonable satisfaction of the undertaker in question.
- (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, Network Rail requires the removal of any apparatus placed in that land, it must give to the undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed.
- (3) Any alternative apparatus to be constructed in land of Network Rail under this Part of this Schedule is to be constructed in such manner and in such line or situation as may be agreed between the undertaker in question and Network Rail within 21 days of the service of a notice under sub-paragraph (2), or in default of such agreement settled by arbitration in accordance with article 44 (arbitration).
- (4) In any case where alternative apparatus is to be provided or constructed under sub-paragraph (2), or if in consequence of the exercise of any of the powers conferred by this Order an undertaker reasonably needs to remove any of its apparatus, Network Rail must, subject to sub-paragraph (5), afford to the undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of Network Rail and subsequently for the maintenance of that apparatus.
- (5) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of Network Rail, or Network Rail is unable to afford such facilities and rights as are mentioned in sub-paragraph (4), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the undertaker in question must, on receipt of a written notice to that effect from Network Rail, as soon as reasonably possible use its best endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (6) The undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 44, and after the grant to the undertaker of any such facilities and rights as are referred to in sub-paragraph (4) or (5), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by Network Rail to be removed under the provisions of this Part of this Schedule.
- (7) Regardless of anything in sub-paragraph (6), if Network Rail gives notice in writing to the undertaker in question that it desires itself to execute any work, or part of any work in connection with the construction or removal of apparatus in any land of Network Rail, that work, instead of being executed by the undertaker, must be executed by Network Rail without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the undertaker.
- (8) Nothing in sub-paragraph (7) authorises Network Rail to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
7
- (1) Where, in accordance with the provisions of this Part of this Schedule, Network Rail affords to an undertaker facilities and rights for the construction and maintenance in land of Network Rail of alternative apparatus in substitution for apparatus to be removed, those facilities and rights are to be granted upon such terms and conditions as may be agreed between Network Rail and the undertaker in question or in default of agreement settled by arbitration in accordance with article 44 (arbitration).
- (2) In settling those terms and conditions in respect of alternative apparatus to be constructed in or along any railway of Network Rail, the arbitrator must—
- (a) give effect to all reasonable requirements of Network Rail for ensuring the safety and efficient operation of the railway and for securing any subsequent alterations or adaptations of the alternative apparatus which may be required to prevent interference with any proposed works of Network Rail or the traffic on the railway; and
- (b) so far as it may be reasonable and practicable to do so in the circumstances of the particular case, give effect to the terms and conditions, if any, applicable to the apparatus constructed in or along the railway for which the alternative apparatus is to be substituted.
- (3) If the facilities and rights to be afforded by Network Rail in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by Network Rail to that undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Existing apparatus: protection and access
8
- (1) Not less than 28 days before starting the execution of any of the authorised works that are near to, or will or may affect, any apparatus the removal of which has not been required by Network Rail under paragraph 6(2), Network Rail must submit to the undertaker in question a plan, section and description of the works to be executed.
- (2) Those works are to be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and an officer of the undertaker is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by an undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
- (4) If an undertaker in accordance with sub-paragraph (3) and in consequence of the works proposed by Network Rail, reasonably requires the removal of any apparatus and gives written notice to Network Rail of that requirement, paragraphs 1 to 7 apply as if the removal of the apparatus had been required by Network Rail under paragraph 6(2).
- (5) Nothing in this paragraph precludes Network Rail from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
- (6) Network Rail is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
Expenses
9
- (1) Subject to the following provisions of this paragraph, Network Rail must repay to an undertaker the reasonable expenses incurred by that undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus (including costs or compensation payable in connection with the acquisition of land for that purpose) which may be required in consequence of the execution of any of the authorised works.
- (2) The value of any apparatus removed under the provisions of this Part of this Schedule (other than apparatus that is re-used as alternative apparatus) is to be deducted from any sum payable under sub-paragraph (1), that value being calculated after removal.
- (3) If in accordance with the provisions of this Part of this Schedule—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions except where this has been solely due to using the nearest currently available type; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by Network Rail or, in default of agreement, is not determined by arbitration in accordance with article 44 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this paragraph would be payable to the undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus must not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole must be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to an undertaker in respect of works under sub-paragraph (1) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
- (6) Any dispute as to whether a financial benefit is conferred in accordance with sub-paragraph (5) or as to the amount of such financial benefit which cannot be agreed is to be determined in accordance with article 44 (arbitration).
Damage to apparatus: costs, losses, etc.
10
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the authorised works any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of an undertaker or there is any interruption in any service provided or in the supply of any goods, by any undertaker Network Rail must—
- (a) bear and pay the cost reasonably incurred by that undertaker in making good such damage or restoring the supply; and
- (b) make reasonable compensation to that undertaker for any other expenses, loss, damages, penalty or costs incurred by the undertaker, by reason or in consequence of any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on Network Rail with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an undertaker, its officers, servants, contractors or agents.
- (3) An undertaker must give Network Rail reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of Network Rail which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
Enactments and agreements
11
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between Network Rail and an undertaker in respect of any apparatus laid or erected in land belonging to Network Rail on the date on which this Order is made.
PART 2 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
12
- (1) For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between Network Rail and the operator.
- (2) In this Part of this Schedule—
- “electronic communications apparatus” has the same meaning as in the electronic communications code;
- “the electronic communications code” has the same meaning as in Chapter 1 of Part 2 of the 2003 Act[^f00078];
- “electronic communications code network” means— so much of an electronic communications network or infrastructure system provided by an electronic communications code operator as is not excluded from the application of the electronic communications code by a direction under section 106 of the 2003 Act; and an electronic communications network which the Secretary of State is providing or proposing to provide;
- “electronic communications code operator” means a person in whose case the electronic communications code is applied by a direction under section 106 of the 2003 Act;
- “infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7(2) of that code; and
- “operator” means the operator of an electronic communications code network.
13
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised works or their construction, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
- (b) there is any interruption in the supply of the service provided by an operator,
Network Rail must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and must—
- (a) make reasonable compensation to the operator for loss sustained by it; and
- (b) indemnify the operator against claims, demands, proceedings, costs, damages and expenses which may be made or taken against, or recovered from, or incurred by, the operator by reason, or in consequence, of any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on Network Rail with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator must give Network Rail reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand may be made without the consent of Network Rail which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between Network Rail and the operator under this paragraph is to be referred to and settled by arbitration under article 44 (arbitration).
14
This Part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between Network Rail and an operator are regulated by the provisions of Part 3 of the 1991 Act; or
- (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised works.
15
Nothing in this Part of this Schedule affects the provisions of any enactment or agreement regulating the relations between Network Rail and an operator in respect of any apparatus laid or erected in land belonging to Network Rail on the date on which this Order is made.
PART 3 — FOR THE PROTECTION OF DRAINAGE AUTHORITIES AND THE ENVIRONMENT AGENCY
16
- (1) The following provisions of this Part of this Schedule apply for the protection of the drainage authority unless otherwise agreed in writing between Network Rail and the drainage authority.
- (2) In this Part of this Schedule—
- “the Agency” means the Environment Agency;
- “a category 1 specified work” means so much of any permanent or temporary work or operation authorised by this Order (which includes any dredging and any geotechnical investigations that may be undertaken) as consists of— erecting any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect any drainage work which is or includes a main river or the volumetric rate of flow of water in or flowing to or from any main river; the carrying out of any work or alteration or repair of any structure (whether temporary or permanent) in, over or under a main river if the work is likely to affect the flow of water in the main river or to affect any drainage work; or any work or operation that is in, on, under, over or within 16 metres of a drainage work which is or includes a main river or is otherwise likely to affect any such drainage work or the volumetric rate of flow of water in or flowing to or from any drainage work;
- “a category 2 specified work” means any of the following— erecting any mill dam, weir or other like obstruction to the flow of any ordinary watercourse, or raising or otherwise altering any such obstruction; erecting a culvert in any ordinary watercourse; altering a culvert in a manner that would be likely to affect the flow of any ordinary watercourse; or altering, removing or replacing a structure or feature designated by a local drainage authority under Schedule 1 to the Flood and Water Management Act 2010[^f00079];
- “construction” includes execution, placing, altering, replacing, relaying, removal and carrying out excavations in relation to a work, and “construct” and “constructed” are construed accordingly;
- “the drainage authority” means— in relation to a category 1 specified work, the Agency; in relation to a category 2 specified work, the drainage board concerned within the meaning of section 23 of the Land Drainage Act 1991[^f00080];
- “drainage work” means any watercourse and includes any land which provides or is expected to provide flood storage capacity for any watercourse and any bank, wall, embankment or other structure, or any appliance, constructed or used for land drainage, flood defence or tidal monitoring;
- “the fishery” means any waters containing fish and fish in, such waters and the spawn, habitat or food of such fish;
- “a main river” and “ordinary watercourse” have the meanings given by respectively the Water Resources Act 1991 and the Land Drainage Act 1991;
- “plans” includes sections, drawings, specifications and method statements; and
- “specified work” means a category 1 specified work or a category 2 specified work.
17
- (1) Before beginning to construct any specified work, Network Rail must submit to the drainage authority plans of the specified work and such further particulars available to it as the drainage authority may within 28 days of the receipt of the plans reasonably require.
- (2) Any such specified work must not be constructed except in accordance with such plans as may be approved in writing by the drainage authority, or determined under article 44 (arbitration).
- (3) Any approval of the drainage authority required under this paragraph—
- (a) must not be unreasonably withheld;
- (b) is deemed to have been given if it is neither given nor refused within 2 months of the receipt of the plans for approval or where further particulars are submitted under paragraph (1) within 2 months of the submission of those particulars, and, in the case of a refusal, accompanied by a statement of the grounds of refusal; and
- (c) may be given subject to such reasonable requirements as the drainage authority may make for the protection of any drainage work, fishery, water resources, or for the prevention of flooding or pollution or in the discharge of its environmental duties.
- (4) The drainage authority must use its reasonable endeavours to respond to the submission of any plans before the expiration of the period mentioned in sub-paragraph (3)(b).
18
Without limitation on the scope of paragraph 17, the requirements which the drainage authority may make under that paragraph include conditions requiring Network Rail at its own expense to construct such protective works, whether temporary or permanent, before or during the construction of the specified works (including the provision of flood banks, walls or embankments or other new works and the strengthening, repair or renewal of existing banks, walls or embankments) as are reasonably necessary—
- (a) to safeguard any drainage work against damage; or
- (b) to secure that its efficiency for flood defence purposes is not impaired and that the risk of flooding is not otherwise increased,
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.