The Boston Alternative Energy Facility Order 2023
- (d) construct any works on that land as are mentioned in Schedule 1 (authorised development).
- (2) Not less than 14 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
- (3) The undertaker is not required to serve notice under paragraph (2) where the undertaker has identified a potential risk to the safety of—
- (a) the authorised development or any of its parts;
- (b) the public; and/or
- (c) the surrounding environment,
and in such circumstances, the undertaker may enter the land under paragraph (1) subject to giving such period of notice as is reasonably practical in the circumstances.
- (4) The undertaker may not, without the agreement of the owners of the land, remain in possession of any land under this article—
- (a) in the case of land specified in paragraph (1)(a)(i), after the end of the period of one year beginning with the date of final commissioning of the authorised development; or
- (b) in the case of land referred to in paragraph (1)(a)(ii), after the end of the period of one year beginning with the date of final commissioning of the authorised development unless the undertaker has, before the end of that period, served notice of entry under section 11 of the 1965 Act or made a declaration under section 4 of the 1981 Act or has otherwise acquired the land subject to temporary possession.
- (5) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land unless otherwise agreed but the undertaker is not required to—
- (a) replace a building removed under this article;
- (b) restore the land on which any permanent works have been constructed under paragraph (1)(d);
- (c) remove any ground strengthening works which have been placed on the land to facilitate construction of the authorised development; or
- (d) remove any measures installed over or around statutory undertakers’ apparatus to protect that apparatus from the authorised development.
- (6) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the provisions of this article.
- (7) Any dispute as to a person’s entitlement to compensation under paragraph (6), or as to the amount of compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (8) Any dispute as to the satisfactory removal of temporary works and restoration of land under paragraph (5) does not prevent the undertaker giving up possession of the land.
- (9) Subject to article 51 (no double recovery) nothing in this article affects any liability to pay compensation under section 152 (compensation in case where no right to claim in nuisance) of the 2008 Act or under any other enactment in respect of loss or damage arising from the carrying out of the authorised development, other than loss or damage for which compensation is payable under paragraph (6).
- (10) The undertaker may not compulsorily acquire under this Order the land referred to in paragraph (1)(a)(i) except that the undertaker is not precluded from acquiring any part of the subsoil of or airspace over (or rights in the subsoil of or airspace over) under article 32 (acquisition of subsoil or air-space only).
- (11) Where the undertaker takes possession of land under this article, the undertaker is not to be required to acquire the land or any interest in it.
- (12) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
- (13) Nothing in this article prevents the taking of temporary possession more than once in relation to any land under paragraph (1).
Temporary use of land for maintaining the authorised development
34
- (1) Subject to paragraph (2), at any time during the maintenance period (as defined in paragraph (11)) relating to any part of the authorised development, the undertaker may—
- (a) enter on and take temporary possession of any land within the Order land if possession is reasonably required for the purpose of maintaining the authorised development;
- (b) enter on any land within the Order land for the purpose of gaining such access as is reasonably required for the purpose of maintaining the authorised development; and
- (c) construct such temporary works (including the provision of means of access) and buildings on the land as may be reasonably necessary for that purpose.
- (2) Paragraph (1) does not authorise the undertaker to take temporary possession of—
- (a) any house or garden belonging to a house; or
- (b) any building (other than a house) if it is for the time being occupied.
- (3) Not less than 28 days before entering on and taking temporary possession of land under this article the undertaker must serve notice of the intended entry on the owners and occupiers of the land.
- (4) The undertaker is not required to serve notice under paragraph (3) where the undertaker has identified a potential risk to the safety of—
- (a) the authorised development or any of its parts;
- (b) the public; and/or
- (c) the surrounding environment,
and in such circumstances, the undertaker may enter the land under paragraph (1) subject to giving such period of notice as is reasonably practical in the circumstances.
- (5) The undertaker may only remain in possession of land under this article for so long as may be reasonably necessary to carry out the maintenance of the part of the authorised development for which possession of the land was taken.
- (6) Before giving up possession of land of which temporary possession has been taken under this article, the undertaker must remove all temporary works and restore the land to the reasonable satisfaction of the owners of the land.
- (7) The undertaker must pay compensation to the owners and occupiers of land of which temporary possession is taken under this article for any loss or damage arising from the exercise in relation to the land of the powers conferred by this article.
- (8) Any dispute as to a person’s entitlement to compensation under paragraph (7), or as to the amount of the compensation, is to be determined under Part 1 (determination of questions of disputed compensation) of the 1961 Act.
- (9) Nothing in this article affects any liability to pay compensation under section 10(2) (further provisions as to compensation for injurious affection) of the 1965 Act or under any other enactment in respect of loss or damage arising from the maintenance of the authorised development, other than loss or damage for which compensation is payable under paragraph (7).
- (10) Where the undertaker takes possession of land under this article, the undertaker is not to be required to acquire the land or any interest in it.
- (11) Section 13 (refusal to give possession to acquiring authority) of the 1965 Act applies to the temporary use of land pursuant to this article to the same extent as it applies to the compulsory acquisition of land under this Order by virtue of section 125 (application of compulsory acquisition provisions) of the 2008 Act.
- (12) In this article “the maintenance period” means the period of 5 years beginning with the date of final commissioning.
Statutory undertakers
35
- (1) Subject to the provisions of Schedule 8 (protective provisions), the undertaker may—
- (a) exercise the powers conferred by article 25 (compulsory acquisition of land) in relation to so much of the Order land belonging to statutory undertakers;
- (b) extinguish or suspend the rights of or restrictive covenants for the benefit of, and remove or reposition the apparatus belonging to, statutory undertakers on, under, over or within the Order land.
- (2) Paragraph (1)(b) has no effect in relation to apparatus in respect of which article 36 (apparatus and rights of statutory undertakers in stopped up streets) of this Order applies.
Apparatus and rights of statutory undertakers in stopped up streets
36
- (1) Where a street is stopped up under article 14 (permanent stopping up of streets), any statutory utility whose apparatus is under, in, on, along or across the street has the same powers and rights in respect of that apparatus, subject to the provisions of this article, as if this Order had not been made.
- (2) Where a street is stopped up under article 13 (temporary closure, alteration, diversion and restriction of use of streets) any statutory utility whose apparatus is under, in, on over, along or across the street may, and if reasonably requested to do so by the undertaker must—
- (a) remove the apparatus and place it or other apparatus provided in substitution for it in such other position as the statutory utility may reasonably determine and have power to place it; or
- (b) provide other apparatus in substitution for the existing apparatus and place it in such position as described in sub-paragraph (a).
- (3) Subject to the following provisions of this article, the undertaker must pay to any statutory utility an amount equal to the cost reasonably incurred by the statutory utility in or in connection with—
- (a) the execution of the relocation works required in consequence of the stopping up of the street; and
- (b) the doing of any other work or thing rendered necessary by the execution of the relocation works.
- (4) If in the course of the execution of relocation works under paragraph (2)—
- (a) apparatus of a better type, or greater capacity or of greater dimensions is placed in substitution for existing apparatus; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker, or, in default of agreement, is not determined by arbitration to be necessary, then, if it involves cost in the execution of the relocation works exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which, apart from this paragraph, would be payable to the statutory utility by virtue of paragraph (3) is to be reduced by the amount of that excess.
- (5) For the purposes of paragraph (4)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
- (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (6) An amount which, apart from this paragraph, would be payable to a statutory utility in respect of works by virtue of paragraph (3) (and having regard, where relevant, to paragraph (4)) must, if the works include the placing of apparatus provided in substitution for apparatus placed more than 7 years and 6 months earlier so as to confer on the statutory utility any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, be reduced by the amount which represents that benefit.
- (7) Paragraphs (3) to (6) do not apply where the authorised development constitutes major highway works, major bridge works or major transport works for the purposes of Part 3 of the 1991 Act, but instead—
- (a) the allowable costs of the relocation works are to be determined in accordance with section 85 (sharing of cost of necessary measures) of that Act and any regulations for the time being having effect under that section; and
- (b) the allowable costs are to be borne by the undertaker and the statutory utility in such proportions as may be prescribed by any such regulations.
- (8) In this article—
- “relocation works” means work executed, or apparatus provided, under paragraph (2); and
- “statutory utility” means a statutory undertaker for the purposes of the 1980 Act or a public communications provider as defined in this section 151(1) (interpretation) of the Communications Act 2003[^f00052].
Recovery of costs of new connections
37
- (1) Where any apparatus of a public utility undertaker or of a public communications provider is removed under article 35 (statutory undertakers) any person who is the owner or occupier of premises to which a supply was given from that apparatus is entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of effecting a connection between the premises and any other apparatus from which a supply is given.
- (2) Paragraph (1) does not apply in the case of the removal of a public sewer but where such a sewer is removed under article 35 (statutory undertakers) any person who is—
- (a) the owner or occupier of premises the drains of which communicated with the sewer; or
- (b) the owner of a private sewer which communicated with that sewer,
is to be entitled to recover from the undertaker compensation in respect of expenditure reasonably incurred by that person, in consequence of the removal, for the purpose of making the drain or sewer belonging to that person communicate with any other public sewer or with a private sewerage disposal plant.
- (3) This article does not have effect in relation to apparatus to which article 36 (apparatus and rights of statutory undertakers in stopped up streets) or Part 3 (street works in England and Wales) of the 1991 Act applies.
- (4) In this article—
- “public communications provider” has the same meaning as in section 151(1) of the Communications Act 2003[^f00053]; and
- “public utility undertaker” has the same meaning as in the 1980 Act.
Disregard of certain improvements, etc.
38
- (1) In assessing the compensation payable to any person on the acquisition from that person of any land or right over any land under this Order, the tribunal must not take into account—
- (a) any interest in land; or
- (b) any enhancement of the value of any interest in land by reason of any building erected, works carried out or improvement or alteration made on the relevant land,
if the tribunal is satisfied that the creation of the interest, the erection of the building, the carrying out of the works or the making of the improvement or alteration as part of the authorised development was not reasonably necessary and was undertaken with a view to obtaining compensation or increased compensation.
- (2) In paragraph (1) “relevant land” means the land acquired from the person concerned or any other land with which that person is, or was at the time when the building was erected, the works constructed or the improvement or alteration made as part of the authorised development, directly or indirectly concerned.
Set-off for enhancement in value of retained land
39
- (1) In assessing the compensation payable to any person in respect of the acquisition from that person under this Order of any land (including the subsoil) the tribunal must set off against the value of the land so acquired any increase in value of any contiguous or adjacent land belonging to that person in the same capacity which will accrue to that person by reason of the construction of the authorised development.
- (2) The 1961 Act has effect, subject to paragraph (1) as if this Order were a local enactment for the purposes of that Act.
PART 6 — MISCELLANEOUS AND GENERAL
Disapplication of legislative provisions, etc.
40
- (1) The following provisions do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction, operation or maintenance of the authorised development—
- (a) sections 23 (prohibition of obstructions, etc. in watercourses), 30 (authorisation of drainage works in connection with a ditch) and 32 (variation of awards) of the Land Drainage Act 1991[^f00054];
- (b) the provisions of any byelaws made under section 66 (powers to make byelaws) of the Land Drainage Act 1991;
- (c) the provisions of any byelaws made under, or having effect as if made under, paragraphs 5, 6 or 6A of Schedule 25 (byelaw making powers of the appropriate agency) to the Water Resources Act 1991[^f00055]; and
- (d) regulation 12 (requirement for environmental permit) of the Environmental Permitting (England and Wales) Regulations 2016[^f00056] in respect of a flood risk activity only.
- (2) The provisions of the Neighbourhood Planning Act 2017[^f00057], insofar as they relate to temporary possession of land under this Order, do not apply in relation to the construction of any work or the carrying out of any operation required for the purpose of, or in connection with, the construction of the authorised development and, within the maintenance period defined in article 34(12) (temporary use of land for maintaining the authorised development) of this Order, any maintenance of any part of the authorised development.
- (3) Section 25 of the Burial Act 1857[^f00058] (bodies not to be removed from burial grounds, save under faculty, without licence of Secretary of State) does not apply to a removal carried out in accordance with article 24 (removal of human remains) of this Order.
- (4) Despite the provisions of section 208 (liability) of the 2008 Act, for the purposes of regulation 6 of the Community Infrastructure Levy Regulations 2010[^f00059] any building comprised in the authorised development is deemed to be—
- (a) a building into which people do not normally go; or
- (b) a building into which people go only intermittently for the purpose of inspecting or maintaining fixed plant or machinery.
Amendment of local legislation
41
- (1) The following local enactments and local byelaws, and any byelaws or other provisions made under any of those enactments or byelaws, are hereby excluded and do not apply insofar as inconsistent with a provision, of or a power conferred by, this Order—
- (a) Boston Port and Harbour Act 1812[^f00060];
- (b) Witham Navigation and Drainage Act 1812[^f00061];
- (c) River Witham Outfall Improvement Act 1880[^f00062];
- (d) Boston Dock Act 1881[^f00063];
- (e) Land Drainage (Black Sluice) Provisional Order Confirmation Act 1925[^f00064];
- (f) The Boston Barrier Order 2017[^f00065];
- (g) Boston Dock Byelaws 1947; and
- (h) Black Sluice Internal Drainage Board Complete Land Drainage Byelaws 1988.
- (2) For the purpose of paragraph (1) a provision is inconsistent with the exercise of a power conferred by this Order if and insofar as (in particular)—
- (a) it would make it an offence to take action, or not to take action, in pursuance of a power conferred by this Order;
- (b) action taken in pursuance of a power conferred by this Order would cause the provision to apply so as to enable a person to require the taking of remedial or other action or so as to enable remedial or other action to be taken; or
- (c) action taken in pursuance of a power or duty under the provisions would or might interfere with the exercise of any work authorised by this Order.
- (3) Where any person notifies the undertaker in writing that anything done or proposed to be done by the undertaker or by virtue of this Order would amount to a contravention of a statutory provision of local application, the undertaker must as soon as reasonably practicable, and at any rate within 14 days of receipt of the notice, respond in writing setting out—
- (a) whether the undertaker agrees that the action taken or proposed does or would contravene the provision of local application;
- (b) if the undertaker does agree, the grounds (if any) on which the undertaker believes that the provision is excluded by this article; and
- (c) the extent of that exclusion.
Planning permission, etc.
42
- (1) If planning permission is granted under the powers conferred by the 1990 Act for development any part of which is within the Order limits following the coming into force of this Order that is—
- (a) not itself a nationally significant infrastructure project under the 2008 Act or part of such a project; or
- (b) required to complete or enable the use or operation of any part of the development authorised by this Order,
then the construction, maintenance, use or operation of that development under the terms of the planning permission does not constitute a breach of the terms of this Order.
- (2) Development consent granted by this Order is to be deemed as specific planning permission for the purposes of section 264(3) (cases in which land is to be treated as operational land for the purposes of that Act) of the 1990 Act.
- (3) Development consent granted by this Order is to be treated as planning permission in accordance with Part 3 (control over development) of the 1990 Act for the purposes of regulation 14 of the Town and Country Planning (Tree Preservation) (England) Regulations 2012[^f00066] and the Forestry Act 1967[^f00067].
Application of landlord and tenant law
43
- (1) This article applies to—
- (a) any agreement for leasing to any person the whole or any part of the authorised development or the right to operate the same; and
- (b) any agreement entered into by the undertaker with any person for the construction, maintenance, use or operation of the authorised development, or any part of it,
so far as any such agreement relates to the terms on which any land is the subject of a lease granted by or under that agreement is to be provided for that person’s use.
- (2) No enactment or rule of law regulating the rights and obligations of landlords and tenants prejudices the operation of any agreement to which this article applies.
- (3) No enactment or rule of law to which paragraph (2) applies is to apply in relation to the rights and obligations of the parties to any lease granted by or under any such agreement so as to—
- (a) exclude or in any respect modify any of the rights and obligations of those parties under the terms of the lease, whether with respect to the termination of the tenancy or any other matter;
- (b) confer or impose on any such party any right or obligation arising out of or connected with anything done or omitted on or in relation to land which is the subject of the lease, in addition to any such right or obligation provided for by the terms of the lease; or
- (c) restrict the enforcement (whether by action for damages or otherwise) by any party to the lease of any obligation of any other party under the lease.
Defence to proceedings in respect of statutory nuisance
44
- (1) Where proceedings are brought under section 82(1) (summary proceedings by persons aggrieved by statutory nuisances) of the Environmental Protection Act 1990[^f00068] in relation to a nuisance falling within paragraphs (c), (d), (e), (fb), (g) or (h) of section 79(1) (statutory nuisances and inspections therefor) of that Act no order is to be made, and no fine may be imposed, under section 82(2) of that Act if—
- (a) the defendant shows that the nuisance—
- (i) relates to premises used by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development and that the nuisance is attributable to the construction of the authorised development in accordance with a notice served under section 60 (control of noise on construction sites), or a consent given under section 61 (prior consent for work on construction sites), of the Control of Pollution Act 1974[^f00069]; or
- (ii) is a consequence of the construction or maintenance of the authorised development and that it cannot reasonably be avoided; or
- (b) the defendant shows that the nuisance is a consequence of the use of the authorised development and that it cannot reasonably be avoided.
- (2) For the purposes of paragraph (1), compliance with the controls and measures described in the Code of Construction Practice approved under paragraph 11 of Schedule 2 to this Order will be sufficient, but not necessary, to show that an alleged nuisance could not reasonably be avoided.
- (3) Section 61(9) (consent for work on construction site to include statement that it does not of itself constitute a defence to proceedings under section 82 of the Environmental Protection Act 1990) of the Control of Pollution Act 1974 does not apply where the consent relates to the use of premises by the undertaker for the purposes of or in connection with the construction or maintenance of the authorised development.
Protective provisions
45
Schedule 8 (protective provisions) to the Order has effect.
Deemed marine licence
46
The marine licence set out in Schedule 9 (deemed marine licence) is deemed to have been issued under Part 4 of the Marine and Coastal Access Act 2009 for the licensed activities set out in Part 2, and subject to the licence conditions set out in Parts 3 and 4, of that licence.
Certification of documents, etc.
47
- (1) The undertaker must, as soon as practicable after the making of this Order, submit to the Secretary of State copies of all documents and plans referred to in Schedule 10 (documents and plans to be certified) to this Order for certification that they are true copies of those documents.
- (2) Where any plan or document set out in Schedule 10 requires to be amended to reflect the terms of the Secretary of State’s decision to make the Order, that plan or document in the form amended to the Secretary of State’s satisfaction is the version of the plan or document required to be certified under paragraph (1).
- (3) A plan or document so certified is to be admissible in any proceedings as evidence of the contents of the document of which it is a copy.
Service of notices
48
- (1) A notice or other document required or authorised to be served for the purposes of this Order may be served—
- (a) by post;
- (b) by delivering it to the person on whom it is to be served or to whom it is to be given or supplied; or
- (c) with the consent of the recipient and subject to paragraphs (5) to (8), by electronic transmission.
- (2) Where the person on whom a notice or other document to be served for the purposes of this Order is a body corporate, the notice or document is duly served if it is served on the secretary or clerk of that body.
- (3) For the purposes of section 7 (references to service by post) of the Interpretation Act 1978[^f00070] as it applies for the purposes of this article, the proper address of any person in relation to the service on that person of a notice or document under paragraph (1) is, if that person has given an address for service, that address and otherwise—
- (a) in the case of the secretary or clerk of a body corporate, the registered or principal office of that body, and,
- (b) in any other case, the last known address of that person at that time of service.
- (4) Where for the purposes of this Order a notice or other document is required or authorised to be served on a person as having an interest in, or as the occupier of, land and the name or address of that person cannot be ascertained after reasonable enquiry, the notice may be served by—
- (a) addressing it to that person by the description of “owner”, or as the case may be “occupier” of the land (describing it); and
- (b) either leaving it in the hands of the person who is or appears to be resident or employed on the land or leaving it conspicuously affixed to some building or object on or near the land.
- (5) Where a notice or other document required to be served or sent for the purposes of this Order is served or sent by electronic transmission the requirement is to be taken to be fulfilled only where—
- (a) the recipient of the notice or other document to be transmitted has given consent to the use of electronic transmission in writing or by electronic transmission;
- (b) the notice or document is capable of being accessed by the recipient;
- (c) the notice or document is legible in all material respects; and
- (d) in a form sufficiently permanent to be used for subsequent reference.
- (6) Where the recipient of a notice or other document served or sent by electronic transmission notifies the sender within seven days of receipt that the recipient requires a paper copy of all or any part of that notice or other document the sender must provide such a copy as soon as reasonably practicable.
- (7) Any consent to the use of an electronic transmission by a person may be revoked by that person in accordance with paragraph (8).
- (8) Where a person is no longer willing to accept the use of electronic transmission for any of the purposes of this Order—
- (a) that person must give notice in writing or by electronic transmission revoking any consent given by that person for that purpose; and
- (b) such revocation is final and takes effect on a date specified by the person in the notice but that date must not be less than seven days after the date on which the notice is given.
- (9) This article does not exclude the employment of any method of service not expressly provided for by it.
- (10) In this article “legible in all material respects” means that the information contained in the notice or document is available to that person to no lesser extent than it would be if served, given or supplied by means of a notice or document in printed form.
Arbitration
49
- (1) Except where otherwise expressly provided for in this Order and unless otherwise agreed in writing between the parties, any difference under any provision of this Order (other than a difference which falls to be determined by the tribunal) must be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by the President of the Institution of Civil Engineers.
- (2) For the avoidance of doubt, any matter for which the consent or approval of the Secretary of State or the MMO is required under any provision of this Order will not be subject to arbitration.
Procedures in relation to approvals, etc., under Schedule 2
50
- (1) Where an application or request is submitted to the relevant planning authority, a highway authority, a street authority or the owner of a watercourse, sewer or drain for any consent, agreement or approval required or contemplated by any other the provisions of the Order such consent, agreement or approval, if given, must be given in writing, such agreement not to be unreasonably withheld.
- (2) Part 2 of Schedule 2 (procedure for discharge of requirements) has effect in relation to all consents, agreements or approvals granted, refused or withheld in relation to the requirements set out in Part 1 of Schedule 2, and any document referred to in any requirement in that Part 1.
- (3) The procedure set out in Part 2 of Schedule 2 has effect in relation to any other consent, agreement or approval required under this Order where such consent, agreement or approval is granted subject to any condition to which the undertaker objects or is refused or is withheld.
No double recovery
51
Compensation will not be payable in respect of the same matter both under this Order and under any enactment, any contract or any rule of law.
Guarantees in respect of payment of compensation
52
- (1) The undertaker must not begin to exercise the powers conferred by the provisions referred to in paragraph (2) in relation to any Order land unless it has first put in place either—
- (a) a guarantee and the amount of that guarantee approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2); or
- (b) an alternative form of security and the amount of that security approved by the Secretary of State in respect of the liabilities of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2).
- (2) The provisions are—
- (a) article 25 (compulsory acquisition of land);
- (b) article 28 (private rights);
- (c) article 33 (temporary use of land for carrying out the authorised development);
- (d) article 34 (temporary use of land for maintaining the authorised development); and
- (e) article 35 (statutory undertakers).
- (3) A guarantee or alternative form of security given in respect of any liability of the undertaker to pay compensation pursuant to the provisions referred to in paragraph (2) is to be treated as enforceable against the guarantor or person providing the alternative form of security by any person to whom such compensation is payable and must be in such a form as to be capable of enforcement by such a person.
- (4) Nothing in this article requires a guarantee or alternative form of security to be in place for more than 15 years after the date on which the relevant power is exercised.
Crown rights
53
- (1) Nothing in this Order affects prejudicially any estate, right, power, privilege, authority or exemption of the Crown and in particular, nothing in this Order authorises the undertaker or any lessee or licensee to take, use, enter upon or in any manner interfere with any land or rights of any description (including any portion of the shore or bed of the sea or any river, channel, creek, bay or estuary)—
- (a) belonging to His Majesty in right of the Crown and forming part of The Crown Estate without the consent in writing of the Crown Estate Commissioners;
- (b) belonging to His Majesty in right of the Crown and not forming part of The Crown Estate without the consent in writing of the government department having the management of that land; or
- (c) belonging to a government department or held in trust for His Majesty for the purposes of a government department without the consent in writing of that government department.
- (2) Paragraph (1) does not apply to the exercise of any right under this Order for the compulsory acquisition of an interest in any Crown land (as defined in section 227 of the 2008 Act) which is for the time being held otherwise than by or on behalf of the Crown.
- (3) A consent under paragraph (1) may be given unconditionally or subject to terms and conditions and is deemed to have been given in writing where it is sent electronically.
Offshore ornithology compensation provisions
54
Schedule 11 (ornithology compensation measures) to the Order has effect.
Harbour seal compensation measures
55
Schedule 12 (harbour seal compensation measures) to the Order has effect.
SCHEDULE 1 — AUTHORISED DEVELOPMENT
A nationally significant infrastructure project as defined in section 14(1)(a) (nationally significant infrastructure projects: general) and section 15 (generating stations) of the 2008 Act being a generating station with a capacity of over 50 megawatts but below 300 megawatts and associated development under sections 115(1) and (2) (development for which development consent may be granted) of the 2008 Act comprising all or part of—
In the Borough of Boston, Lincolnshire
Work No 1 — Works to construct a power generation facility—
- (a) Work No. 1A — an energy recovery facility with a capacity to process up to 1,200,000 tonnes of waste refuse derived fuel per calendar year including—
- (i) fuel reception and storage facilities consisting of a bale shredding facility, solid fuel storage bunker, cranes and handling equipment;
- (ii) up to three waste processing lines, each line including a feed hopper, ram feed, air cooled moving grates, a boiler and steam systems, combustion air systems and flue gas treatment facilities including air pollution control residues and reagent storage silos and tanks;
- (iii) associated induced fans and emissions control monitoring systems per line;
- (iv) one emission stack per line;
- (v) dedicated steam turbine connected to each line;
- (vi) integrated protection system and uninterruptable power supplies;
- (vii) air cooled condenser array;
- (viii) connection from exhaust stacks from lines one and three to Work No. 1C for capture of carbon dioxide and return connection for waste exhaust gases; and
- (ix) conveyors to transfer bottom ash and boiler ash to ash processing facility (Work No. 1B).
- (b) Work No. 1B — an ash processing building with a capacity to process up to 200,000 tonnes of bottom ash and boiler ash per calendar year including—
- (i) ash storage facilities to receive ash from Work No. 1A;
- (ii) ash processing facilities to prepare ash for transfer to the lightweight aggregates facility (Work No. 2);
- (iii) ferrous magnet system and storage for separated ferrous material;
- (iv) solar photovoltaic panels on all or part of Work No.1B building roof including switchgear, inverters, transformers and permanent equipment for maintenance to deliver power to the authorised development; and
- (v) conveyor system for transfer of processed ash and air pollution control residues to Work No. 2.
- (c) Work No. 1C — two carbon dioxide processing units, consisting of a carbon dioxide processing unit, storage tanks, vehicle connection points, return connection to stack for lines one and three.
Work No. 2 — Works to construct a lightweight aggregate manufacturing facility with a capacity to process up to 300,000 tonnes of aggregate per calendar year including—
- (a) storage silo facilities for lightweight aggregate processing lines;
- (b) four processing lines; each line including a feed hopper, mixer units, trefoil kiln, and flue gas treatment facilities including air pollution control residues and reagent storage silos and tanks;
- (c) associated induced fans and emissions control monitoring systems per line;
- (d) two filter banks and two emission stacks;
- (e) storage silos for storing manufactured lightweight aggregate pellets; and
- (f) sealed storage pits, drainage and sump facilities for storing up to 190,000 tonnes of imported clay per calendar year, and up to 10,000 tonnes of sediment dredged from The Haven during maintenance dredging activities per calendar year for use in the lightweight aggregates manufacturing process.
Work No. 3 — Works to construct an electrical substation—
- (a) Work No. 3A — on-site below ground trenches, ducting and jointing pits; and above ground structures including switchgear, and transformer, busbar sections, integrated protection scheme and uninterruptable power supplies; connection from power generation turbine facility (Work No 1A); and
- (b) Work No. 3B — construction of a new pylon; and connection to 132kV pylon for export of power from the power generation facility (Work No. 1A); and incoming connection point from the grid.
Work No. 4 — Works to construct a wharf facility with a capacity to receive up to 1,200,000 tonnes of waste refuse derived fuel and imported clay and sediment, and export up to 300,000 tonnes lightweight aggregates per calendar year including—
- (a) 400m long wharf structure forming 7.2m AOD. flood defence line containing up to three berthing points and scour protection;
- (b) cranes and refuse derived fuel bale handling equipment;
- (c) two conveyor lines (both partially open for loading, then covered sections) to transfer waste refuse derived fuel bales to Works No. 1A, including thermal cameras;
- (d) wharf ramp structure;
- (e) bale contingency storage area;
- (f) re-baling facility;
- (g) bale quarantine area;
- (h) conveyor and handling equipment for loading ships with manufactured aggregate;
- (i) shore to ship power facility; and
- (j) storage areas for mobile plant equipment, including mobile cranes and forklift trucks.
Work No. 5 — Works to construct or install supporting buildings and facilities, including—
- (a) diesel storage tanks;
- (b) process effluent storage tank;
- (c) demineralised water treatment plant;
- (d) fire water tank(s), pump room(s) and fire protection facilities;
- (e) control rooms;
- (f) administration block(s) including welfare facilities;
- (g) distributed control system;
- (h) workshop(s) and associated stores;
- (i) machinery storage facilities;
- (j) security gatehouses and barriers;
- (k) weighbridges;
- (l) heavy goods vehicle holding area;
- (m) storage for on-site mobile equipment;
- (n) external fuel container storage area;
- (o) visitor centre;
- (p) 33kv transformers to distribute power from Work No. 3; and
- (q) emergency stand-by generator(s).
Work No. 6 — Works to construct and install supporting infrastructure, including—
- (a) pipework (including flow/return pipework), cables, telecommunications, other services and associated infrastructure;
- (b) site drainage, waste management, water, wastewater, other services and associated infrastructure;
- (c) new or alteration to accesses, a vehicular access road and internal vehicular access road, vehicle turning, waiting and parking areas and site pedestrian access routes;
- (d) a footbridge on Boston Public Footpath 14 between OSGR TF3374542872 to OSGR TF3400742238 and OSGR TF3400742238 to OSGR TF3417242188 to allow safe pedestrian passage over certain site roads; and
- (e) operational vehicle parking.
Work No. 7 — Works to construct temporary construction compounds including—
- (a) hard standing;
- (b) vehicle parking;
- (c) office accommodation block(s) and welfare facilities;
- (d) new or alteration to accesses;
- (e) concrete batching plant, generators, aggregates storage area and temporary aggregates conveyor from the wharf to the concrete batching plant; and
- (f) construction areas.
In connection with and in addition to Work Nos. 1, 2, 3, 4, 5, 6 and 7 to the extent that it does not otherwise form part of those Work Nos., further associated development within the Order limits including—
- (a) lighting infrastructure, including perimeter lighting columns;
- (b) fencing, boundary treatment and other means of enclosure;
- (c) signage;
- (d) CCTV and other security apparatus;
- (e) surface and foul water drainage facilities;
- (f) potable water supply;
- (g) new telecommunications and utilities apparatus and connections;
- (h) hard and soft landscaping;
- (i) biodiversity enhancement measures and environmental mitigation measures;
- (j) works permanently to alter the position of existing telecommunications and utilities apparatus and connections;
- (k) works for the protection of buildings and land; and
- (l) site establishment and preparation works, including site clearance (including temporary fencing and vegetation removal), earthworks (including soil stripping and storage and site levelling) and excavations, the creation of temporary construction access points and the temporary alteration of the position of services and utilities apparatus and connections,
and such other buildings, structures, works or operations, and modifications to, or demolition of, any existing buildings, structures or works as may be necessary or expedient for the purposes of or in connection with the construction, operation and maintenance of the works in this Schedule 1, but only within the Order limits and insofar as they are unlikely to give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
SCHEDULE 2 — REQUIREMENTS
PART 1 — REQUIREMENTS
Interpretation
1
- (1) In this Schedule—
- “biodiversity units” means the product of the size of an area, and the distinctiveness and condition of the habitat it comprises to provide a measure of ecological value (as assessed using the Defra biodiversity off–setting metric);
- “biodiversity off-setting scheme” means a scheme which will deliver biodiversity enhancements which must not be less than the off–setting value;
- “Defra” means the Department for Environment, Food and Rural Affairs;
- “Defra biodiversity off–setting metric” means the mechanism published by Defra to quantify impacts on biodiversity, which allows biodiversity losses and gains affecting different habitats to be compared and ensures offsets are sufficient to compensate for residual losses of biodiversity;
- “heavy commercial vehicle” has the meaning given by section 138 (meaning of “heavy commercial vehicle”) of the 1984 Act[^f00071];
- “mean high water springs” or “MHWS” means the highest level which spring tides reach on average over a period of time;
- “off-setting value” means the net biodiversity impact of the authorised development, calculated using the Defra biodiversity off–setting metric, measured in biodiversity units; and
- “wharf outage” means circumstances caused by factors beyond the undertaker’s control in which waste, clay or sediment has not or could not be received at Work No. 4 for a period in excess of four consecutive days.
- (2) References in this Schedule to part of the authorised development are to be construed as references to stages, phases or elements of the authorised development in respect of which an application is made by the undertaker under this Schedule, and references to commencement of part of the authorised development in this Schedule are to be construed accordingly.
- (3) References to details or schemes approved under this Schedule are to be construed as references to details or schemes approved in relation to a specified part of the authorised development, as the case may be.
Time limits
2
- (1) The authorised development must commence within 5 years of the date on which this Order is made.
- (2) The authorised development must not commence unless the undertaker has given the relevant planning authorities one month’s notice of its intention to commence the authorised development.
Detailed design approval
3
- (1) The authorised development must be designed in detail and carried out in accordance with the design principles contained in the design and access statement and the preliminary scheme design shown on the indicative generating station plans and indicative wharf plans, unless otherwise agreed in writing by the relevant planning authority, following consultation with the Environment Agency to the extent that it relates to matters relevant to its function, provided that the relevant planning authority is satisfied that any amendments to those documents showing departures from the preliminary scheme design would not give rise to any materially new or materially different environmental effects in comparison with those reported in the environmental statement.
- (2) Where amended details are approved by the relevant planning authority under sub-paragraph (1), those details are deemed to be substituted for the corresponding indicative generating station plans and indicative wharf plans the undertaker must make those amended details available in electronic form for inspection by members of the public. The amended details must be implemented as approved.
Detailed design (appearance)
4
- (1) In relation to any part of the authorised development comprised in Work Nos. 1, 2, 3, 4 and 5 no development of that part may commence until details of the external appearance, including the colour, materials and surface finishes, of all new permanent buildings and structures have been submitted to and approved by the relevant planning authority.
- (2) The authorised development must be carried out in accordance with the approved details.
Parameters of authorised development
5
The elements of the authorised development listed in column (1) of the table below (design parameters) must not exceed the maximum dimensions and levels and, where applicable, the minimum dimensions, set out in relation to that element in columns (3) to (6) of that table.
| (1) Element of authorised development | (2) Work No. | (3) Maximum length (metres) | (4) Maximum width (metres) | (5) Maximum height (metres) from ground level unless stated | (6) Minimum height (metres) from ground level unless stated |
|---|---|---|---|---|---|
| Main energy recovery facility buildings (3 No. units, dimensions per unit) | 1A | 105 | 35 | 44 | – |
| Energy recovery stacks (3 No.) | 1A(a)(iv) | – | – | 80 | 80 |
| Turbine building | 1A(a)(v) | 53 | 40 | 20 | – |
| Air cooled condenser array | 1A(a)(vii) | 65 | 45 | 30 | – |
| Ash processing building | 1B | 70 | 30 | 32 | – |
| Carbon dioxide recovery building | 1C | 30 | 20 | 12 | – |
| Lightweight aggregates main building | 2 | 75 | 40 | 44 | – |
| Lightweight aggregates storage silos | 2(a), 2(e) | 6 | 6 | 25 | – |
| Lightweight aggregates stacks (2 No.) | 2(d) | – | – | 80 | 80 |
| Electrical substation | 3 | 95 | 35 | – | – |
| Wharf structure | 4(a) | 400 | – | – | 7.2 (AOD) |
| Supporting buildings and facilities (control room, visitor centre, workshops) | 5 | 40 | 20 | 15 | – |
Landscape and ecological mitigation strategy
6
- (1) No part of the authorised development may commence until a landscape and ecological mitigation strategy for that part has been submitted to and approved by the relevant planning authority, following consultation with the Environment Agency, the relevant statutory nature conservation body, Lincolnshire Wildlife Trust and the Royal Society for the Protection of Birds.
- (2) The relevant planning authority’s approval of the landscape and ecological mitigation strategy is restricted to those parts of the strategy that relate to the parts of the authorised development that are above MHWS, with the remainder the strategy approved by the MMO under condition 18 of Schedule 9 (deemed marine licence).
- (3) The landscape and ecological mitigation strategy approved under sub-paragraph (1) must be substantially in accordance with the outline landscape and ecological mitigation strategy.
- (4) The landscape and ecological mitigation strategy approved under sub-paragraph (1) must include details of—
- (a) mitigation measures required to protect protected habitats and species, non–statutory designated sites and other habitats and species of principal importance during the construction of the authorised development;
- (b) mitigation measures required to protect protected habitats and species, non–statutory designated sites and other habitats and species of principal importance during the operation of the authorised development;
- (c) the results of the Defra biodiversity off-setting metric together with the off-setting value required, the nature of such off-setting and evidence that the off–setting value provides for the required biodiversity compensation, risk factors (including temporal lag) and long term management and monitoring;
- (d) the site or sites on which the compensation off–setting required pursuant to (c) will be provided together with evidence demonstrating that the site or sites has/have been chosen in accordance with the prioritisation set out in the outline landscape and ecological mitigation strategy;
- (e) certified copies of the completed legal agreements securing the site or sites identified in (d) to enable enactment of the biodiversity off-setting scheme and the biodiversity off–setting management and monitoring plan as approved in the landscape and ecological mitigation strategy;
- (f) any hard and soft landscaping to be incorporated within Work Nos. 1, 2, 3, 4, 5 and 6 including location, number, species, size of any planting and the management and maintenance regime for such landscaping; and
- (g) an air quality deposition monitoring plan that must be substantially in accordance with the outline air quality deposition monitoring plan and must include the final numbers and locations of deposition monitoring locations, as agreed with the relevant statutory nature conservation body and the Environment Agency.
- (5) The landscape and ecological mitigation strategy must be implemented as approved under sub-paragraph (1).
Archaeology
7
- (1) No part of Work Nos. 1, 2, 3, 4, 5 and 6 may commence until for that part a written scheme of investigation, reflecting the relevant mitigation measures set out in the outline written scheme of investigation has been submitted to and approved by the relevant planning authority, following consultation with Historic England.
- (2) The scheme approved under sub-paragraph (1) must—
- (a) identify areas where field work or a watching brief are required and the measures to be taken to protect, record or preserve any significant archaeological remains that may be found; and
- (b) detail the measures for post-field work processing, assessment analysis and reporting of the results of archaeological work and the deposition of the archive.
- (3) Works Nos. 1, 2, 3, 4, 5 and 6 must be carried out in accordance with the scheme referred to in sub-paragraph (1), unless otherwise agreed by the relevant planning authority.
Highway access
8
- (1) No part of Work No. 7 may commence until written details of the siting, design and layout of any new temporary means of access to a highway in that part, or any alteration to an existing means of access to a highway in that part has been submitted to and approved by the relevant planning authority, following consultation with the relevant highway authority.
- (2) The highway accesses must be constructed or altered as approved under sub-paragraph (1).
- (3) The undertaker must not exercise the power in article 14(1) (permanent stopping up of streets) unless and until a plan showing the layout for the termination of the street (as specified in columns (1) and (2) of Schedule 6) has been submitted to and approved by the relevant planning authority.
Surface and foul water drainage
9
- (1) No part of the authorised development may commence until for that part a surface and foul water drainage strategy has been submitted to and approved by the relevant planning authority, following consultation with the Environment Agency, lead local flood authority, Anglian Water Services Limited and relevant internal drainage board to the extent that it relates to matters relevant to their functions.
- (2) The strategy submitted for approval under sub-paragraph (1) must be substantially in accordance with the outline surface and foul water drainage strategy.
- (3) The surface and foul water drainage strategy must be implemented as approved under sub-paragraph (1) and maintained throughout the operation of the authorised development unless otherwise agreed with the relevant planning authority.
Contamination
10
- (1) No part of the authorised development may commence until—
- (a) intrusive ground investigations have been carried out for the purpose of assessing ground conditions; and
- (b) a scheme to deal with the contamination of land, including groundwater, and ground gases which are likely to cause significant harm to persons or pollution of controlled waters or the environment, has, for that part, been submitted to and approved by the relevant planning authority.
- (2) The scheme must include a risk assessment, supported by site investigation data, to identify the extent of any contamination and the remedial measures to be taken to render the land fit for its intended purpose.
- (3) With respect to ground gases, the risk assessment required under sub-paragraph (2) must adopt the source-pathway-receptor principle to identify plausible contaminant linkages and take into account potential migration of off-site ground gases.
- (4) The authorised development, including any remediation, must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority.
- (5) Should any remediation be required a verification report demonstrating the completion of works set out in the approved scheme and the effectiveness of the remediation must be submitted to, and approved, by the relevant planning authority prior to the date of final commissioning.
- (6) The verification report submitted for approval under sub-paragraph (5) must include results of sampling and monitoring carried out in accordance with the remediation strategy to demonstrate that the site remediation criteria have been met along with any long-term post-remediation monitoring requirements.
Code of construction practice
11
- (1) No part of the authorised development may commence until a code of construction practice for that part has been submitted to and approved by the relevant planning authority, following consultation with the Environment Agency and the relevant statutory nature conservation body to the extent that it relates to matters relevant to their functions.
- (2) The code of construction practice submitted for approval must be substantially in accordance with the outline code of construction practice to the extent that it is applicable to that part and must reflect the mitigation measures set out in the register of environmental actions and commitments.
- (3) The code of construction practice submitted under sub-paragraph (1) must include the following—
- (a) the construction and phasing programme;
- (b) liaison procedures;
- (c) complaints procedures;
- (d) an air quality and dust management plan detailing air quality and dust monitoring and management measures during construction that must be substantially in accordance with the outline air quality and dust management plan;
- (e) construction noise and vibration monitoring and management plan;
- (f) a site waste management plan detailing sustainable site waste management measures;
- (g) a soil management plan detailing measures to ensure the temporary storage of soils and other material of value will be in accordance with best practice;
- (h) details of screening and fencing to be installed during construction;
- (i) a materials management plan detailing measures to ensure the safe storage of excavated materials during construction;
- (j) a pollution prevention and incident response plan detailing measures to prevent and control the spillage of oil, chemicals and other potentially harmful liquids;
- (k) a health and safety plan, including details of how health and safety risks are to be identified and managed during construction;
- (l) a surface and foul water drainage plan including measures for the protection of surface and groundwater during construction;
- (m) an artificial light emissions management plan;
- (n) measures to ensure the restoration of site following completion of construction; and
- (o) appropriate procedures to address any unexploded ordnance that may be encountered.
- (4) All construction works must be undertaken in accordance with the approved code of construction practice.
Construction hours
12
- (1) Construction works relating to the authorised development must not take place on Sundays, bank holidays nor otherwise outside the hours of 0800 to 2000 hours on Monday to Saturday (with the option of 0700 to 1900).
- (2) The restrictions in sub-paragraph (1) do not apply to construction works where these—
- (a) are carried out within existing buildings or buildings constructed as part of the authorised development;
- (b) are carried out with the prior approval of the relevant planning authority;
- (c) are associated with an emergency; or
- (d) are associated with slip form working.
- (3) In this requirement “emergency” means a situation where, if the relevant action is not taken, there will be adverse health, safety, security or environmental consequences that in the reasonable opinion of the undertaker would outweigh the adverse effects to the public (whether individual classes or generally as the case may be) of taking that action.
Construction traffic management plan
13
- (1) No part of the authorised development may commence until a construction traffic management plan for that part has been submitted to and approved by the relevant planning authority, following consultation with the relevant highway authority, Boston Borough Council and the relevant statutory nature conservation body in relation to any proposals under sub-paragraph (2)(d) only.
- (2) A construction traffic management plan must be substantially in accordance with the outline construction traffic management plan and must include the following (as applicable for the part of the authorised development to which the construction traffic management plan relates)—
- (a) construction vehicle routing plans in respect of both workers and deliveries;
- (b) proposals for the scheduling and timing of movements of delivery vehicles including details of abnormal indivisible loads;
- (c) site access plans;
- (d) where practicable, proposals for temporary diversions of any public rights of way;
- (e) measures to ensure the protection of users of any footpath within the Order limits which may be affected by the construction of the authorised development;
- (f) proposals for the management of junctions to and crossings of highways and other public rights of way;
- (g) a construction logistics plan;
- (h) a procedure for reviewing and updating the construction traffic management plan;
- (i) a construction worker travel plan, including details of the likely number of worker vehicle movements and the management of workforce parking; and
- (j) appropriate procedures to provide for a vehicle booking management system.
- (3) The construction traffic management plan submitted pursuant to sub–paragraphs (1) and (2) must be accompanied by a statement and associated junction appraisals (as defined in the outline construction traffic management plan) demonstrating how the likely construction traffic impacts identified in the environmental statement are addressed through the measures contained in the construction traffic management plan.
- (4) The construction traffic management plan submitted pursuant to sub–paragraphs (1) and (2) that relates to Work Nos. 1, 2, 3, 4, 5, 6 and 7 must be accompanied by a pre-condition highway survey (as defined in the outline construction traffic management plan).
- (5) The construction traffic management plan and any updated construction traffic management plan submitted following any review under sub-paragraph (2)(h) must be implemented as approved by the relevant planning authority.
Flood risk emergency plan
14
- (1) No part of the authorised development may commence until a flood risk emergency plan has been submitted to and approved by the relevant planning authority, following consultation with the Environment Agency, Black Sluice Internal Drainage Board and the Lead Local Flood Authority.
- (2) The flood risk emergency plan must include—
- (a) procedures to receive flood warnings (including communication lines to cover shift patterns and / or staff leave), and closure of or evacuation of the authorised development with sufficient lead time to ensure no personnel or vehicles are left within the Order limits during times of a flood warning; and
- (b) identification of areas of emergency refuge to be located above the modelled breach flood depths.
- (3) The flood risk emergency plan must be implemented as approved by the relevant planning authority.
Phasing of construction and commissioning of Work Nos. 1 and 2
15
- (1) Subject to sub–paragraph (2), no part of the authorised development may commence until a phasing programme setting out the commencement of construction and the anticipated start of commissioning and the anticipated date of final commissioning for each of Work Nos. 1 and 2 has been submitted to and approved by the relevant planning authority.
- (2) The phasing programme must provide for the anticipated date of final commissioning of Work Nos. 1 and 2 as soon as reasonably practicable. The phasing programme must be implemented as approved by the relevant planning authority.
Operational lighting scheme
16
- (1) Prior to the commissioning of any part of Work Nos. 1, 2, 3, 4 and 5 a written scheme for the management and mitigation of operational external artificial light emissions for that part must be submitted to and approved by the relevant planning authority.
- (2) The written scheme must be substantially in accordance with the outline lighting strategy.
- (3) The scheme for the management and mitigation of operational external artificial light emissions must be implemented as approved under sub-paragraph (1).
Operational vehicle movements
17
- (1) Except in the event of a wharf outage, the number of two-way heavy commercial vehicle movements must not exceed a maximum of 30 two-way vehicle movements per day except in circumstances where, following consultation with the relevant highway authority and Boston Borough Council, the relevant planning authority is satisfied that additional vehicle movements would not give rise to any materially new or materially different highway safety impacts or environmental effects in comparison with those reported in the environmental statement.
- (2) Waste must not be delivered by road to Work No. 1A except in the event of a wharf outage or in circumstances where, following consultation with the relevant highway authority and Boston Borough Council, the relevant planning authority is satisfied that such delivery of waste by road would not give rise to any materially new or materially different highway safety impacts or environmental effects in comparison with those reported in the environmental statement.
- (3) Clay and sediment must not be delivered by road to Work No. 2 or lightweight aggregates exported by road from Work No. 2 except in the event of a wharf outage or in circumstances where, following consultation with the relevant highway authority and Boston Borough Council, the relevant planning authority is satisfied that such delivery or export by road would not give rise to any materially new or materially different highway safety impacts or environmental effects in comparison with those reported in the environmental statement.
- (4) Prior to the date of final commissioning, an operational traffic management plan for that part must be submitted to and approved by the relevant planning authority, following consultation with the relevant highway authority and Boston Borough Council.
- (5) The operational traffic management plan must include—
- (a) an operational worker travel plan that includes measures to encourage the use of sustainable modes of transport by employees;
- (b) measures to manage the routing and number of heavy commercial vehicles during operation;
- (c) measures to manage the routing and number of heavy commercial vehicles in the event of a wharf outage;
- (d) provision as to the responsibility for, and timescales of, the implementation of those measures; and
- (e) a monitoring and review regime.
- (6) The operational traffic plan must be implemented as approved under sub-paragraph (4).
Waste hierarchy scheme
18
- (1) Prior to the commissioning of any part of Work No. 1A, the undertaker must submit to the relevant planning authority for approval a scheme, which sets out arrangements for maintenance of the waste hierarchy in priority order and which aims to minimise recyclable and reusable waste received at the authorised development during the commissioning and operational period of the authorised development (the “waste hierarchy scheme”).
- (2) The waste hierarchy scheme must include details of—
- (a) the type of information that must be collected and retained on the sources of the residual waste after recyclable and reusable waste has been removed;
- (b) the arrangements that must be put in place for ensuring that as much reusable and recyclable waste as is reasonably possible is removed from waste to be received at the authorised development, including contractual measures to encourage as much reusable and recyclable waste being removed as far as possible;
- (c) the arrangements that must be put in place for ensuring that commercial suppliers of residual waste operate a written environmental management system which includes establishing a baseline for recyclable and reusable waste removed from residual waste and specific targets for improving the percentage of such removed reusable and recyclable waste;
- (d) the arrangements that must be put in place for suspending and/or discontinuing supply arrangements from commercial suppliers who fail to retain or comply with any environmental management systems;
- (e) the arrangements that must be put in place for the provision of an annual waste composition analysis undertaken by the undertaker, with the findings submitted to the relevant planning authority within one month of the sampling being undertaken; and
- (f) the form of records that must be kept for the purpose of demonstrating compliance with (a) to (e) and the arrangements in place for allowing inspection of such records by the relevant planning authority.
- (3) The waste hierarchy scheme must be implemented as approved under sub-paragraph (1).
Control of operational noise
19
- (1) Prior to commissioning of any part of Works Nos. 1, 2, 3 and 4 a written noise monitoring scheme must be submitted to and approved by the relevant planning authority, such scheme must specify—
- (a) each location from which noise is to be measured;
- (b) the method of noise measurement, which must be in accordance with British Standard 4142:2014 +A1:2019;
- (c) the maximum permitted levels of noise at each agreed monitoring location which must not exceed the defined limits to demonstrate compliance with government and local policy on noise;
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.