- (1) Subject to sub-paragraph (2), construction and demolition works on the main site (which for the purposes of this requirement excludes archaeological investigations and any non-intrusive internal fit-out works but does include start up and shut down and deliveries) must not take place other than between 07:00 and 19:00 hours on weekdays and 07:00 and 16:00 hours on Saturdays and not at all on Sundays nor on public holidays, unless otherwise agreed in writing by the relevant planning authority. Outside the above periods the following working is permitted—
- (a) pre-planned construction works to highway or rail infrastructure requiring possessions where first notified to the relevant planning authority and local residents;
- (c) works which do not give rise to noise or vibration which cause an adverse impact at the boundary of the main site.
- (2) Regardless of sub-paragraph (1), no piling operations are to take place before 08:00 and after 18:00 hours on weekdays or before 08:00 and after 13:00 on Saturdays, and not at all on Sundays nor on public holidays, unless otherwise agreed in writing by the relevant planning authority.
- (3) Any emergency works carried out under sub-paragraph (1)(b) must be notified to the relevant planning authority within 72 hours of their commencement.
Construction noise
22
The management of construction noise must be carried out in accordance with the relevant phase-specific construction environmental management plan. If required by the relevant planning authority, consents under section 61 of the Control of Pollution Act 1974[^f00076] are to be sought for the works or specific phases of the works.
Noise during the operational phase
23
- (1) Prior to installation, details of all mechanical and ventilation plant and any other noise-making machinery, or mobile plant (including HGV chiller units) that is intended to be used on any of the warehouses or other buildings within the main site, must be submitted to and approved in writing by the relevant planning authority. This will include an assessment of the expected noise impact at relevant receptors using a methodology first approved in writing by the relevant planning authority. The assessment will consider noise from the proposed plant and machinery to demonstrate compliance with government and local policy on noise. Any fixed plant or ventilation equipment must be installed and operated in accordance with manufacturers’ instructions at all times.
- (2) The undertaker must during the course of 2032 carry out a scheme of monitoring of the operational railway noise arising from the use of the authorised development. The scheme of monitoring must first be approved by the relevant planning authority and be designed to establish whether there is a significant adverse effect (as defined in paragraph 8.3.32 of Chapter 8 of the environmental statement) at any residential property arising from night-time maximum levels. In the event of there being significant adverse effects as a result of the use of the authorised development the undertaker must agree with the relevant planning authority a noise insulation scheme for the properties concerned, based on the principles of the 1996 Regulations, and must implement the agreed scheme in accordance with a timetable agreed with the relevant planning authority.
- (3) In the event that between 2032 and 2042 there is an increase in the number of train movements at night arising from the use of the authorised development the undertaker must during the course of 2042 carry out a scheme of monitoring of the operational railway noise arising from the use of the authorised development. The scheme of monitoring must first be approved by the relevant planning authority and be designed to establish whether there is a significant adverse effect (as defined in paragraph 8.3.32 of chapter 8 of the environmental statement) at any residential property arising from night-time maximum levels. In the event of there being significant adverse effects as a result of the use of the authorised development the undertaker must agree with the relevant planning authority a noise insulation scheme for the properties concerned, based on the principles of the 1996 Regulations, and must implement the agreed scheme in accordance with a timetable agreed with the relevant planning authority.
Monitoring of complaints
24
In the event that complaints regarding alleged noise nuisance are received by the relevant planning authority during the construction and operational phase, the undertaker must, unless otherwise agreed in writing with the relevant planning authority, at its own expense, employ a consultant approved by the relevant planning authority to carry out an assessment of the noise which is the subject of the complaint. The assessment must be carried out according to an appropriate methodology agreed with the relevant planning authority and the results of the assessment must be submitted to the relevant planning authority within 28 days of the assessment being completed. If it is found that the effect of noise from the authorised development is greater than was anticipated, recommendations for appropriate remedial measures must be made.
Contamination risk
25
- (1) None of the authorised development is to commence on any specifically identified localised areas of land within the Order limits potentially affected by contamination as identified within the desk study contained within chapter 6 of the environmental statement until further investigations and a risk based land contamination assessment (geo-environmental interpretative report) has been undertaken in line with the recommendations made within the desk study for that localised area of the Order limits and this has been submitted to and approved in writing by the relevant planning authority. The risk based land contamination assessment must be carried out in accordance with the Environment Agency’s Land Contamination: Risk Management manual (“the LCRM”).
- (2) Should any unacceptable risks be identified in the risk based land contamination assessment, a remediation strategy scheme also detailing a proposed verification works plan must be prepared and submitted to and agreed in writing by the relevant planning authority. The remedial scheme must be prepared in accordance with the requirements of the LCRM. The verification plan must be prepared in accordance with the requirements of—
- (a) Evidence Report on the Verification of Remediation of Land Contamination Report SC030114/R1, published by the Environment Agency 2010; and
- (3) If, during the course of construction, previously unidentified contamination is discovered, construction must cease on that localised area of land within the Order limits and the contamination must be reported in writing to the relevant planning authority within 10 working days. Prior to the recommencement of construction on that localised area of land within the Order limits, suitable investigation and risk based land contamination assessment for the discovered contamination (to include any required amendments to the remedial scheme and verification plan) must be submitted to and approved in writing by the relevant planning authority. The authorised development must then be implemented in accordance with the details approved by the relevant planning authority and, unless otherwise agreed in writing by the relevant planning authority, retained as such in perpetuity.
26
- (1) Prior to the use of any part of the completed authorised development—
- (a) if no remediation scheme or verification was required under requirement 25 (contamination risk) a statement from the undertaker, or their approved agent, must be provided to the relevant planning authority, stating that no previously unidentified contamination was discovered during the course of construction of that part of the completed authorised development; or
- (b) if a remediation scheme and verification plan were agreed under requirement 25 for the relevant part of the completed authorised development, a verification investigation must be undertaken in line with the agreed verification plan for any works outlined in the remedial scheme and a report showing the findings of the verification investigation relevant to that part of the authorised development must be submitted to and approved in writing by the relevant planning authority.
- (2) The verification investigation report must—
- (a) contain a full description of the works undertaken in accordance with the agreed remedial scheme and verification plan;
- (b) contain results of any additional monitoring or testing carried out between the submission of the remedial scheme and the completion of remediation works;
- (c) contain movement permits for all materials taken to and from the land within the Order limits and a copy of the completed site waste management plan if one was required;
- (d) contain test certificates of imported material to show that it is suitable for its proposed use;
- (e) demonstrate the effectiveness of the approved remedial scheme; and
- (f) include a statement signed by the undertaker, or the approved agent, confirming that all the works specified in the remedial scheme have been completed.
Waste management during the operational phase
27
No component of the authorised development on the main site may be brought into use until a scheme for waste management for that component has been submitted to and approved in writing by the relevant planning authority. The scheme, which must be in accordance with the framework site waste management strategy, may be amended by agreement with the relevant planning authority. The approved schemes must be implemented and maintained for the duration of the operation of that component of the authorised development.
Employment
28
- (1) Prior to the commencement of the construction of any part of the authorised development an employment scheme in respect of employees to be involved in the construction of that part of the authorised development must be submitted to and approved in writing by the relevant planning authority.
- (2) Prior to the occupation of the first warehouse to be occupied, and any subsequent change in occupation of any warehouse, an employment scheme, in respect of employees to be employed in that warehouse, must be submitted to and approved in writing by the relevant planning authority.
- (3) The approved employment schemes in respect of employees to be involved in construction of the authorised development and in each warehouse must be implemented and complied with at all times.
29
- (1) Prior to the commencement of the authorised development the undertaker must establish a community liaison group to facilitate liaison between various bodies in relation to the construction and operation of the authorised development.
- (2) The following parties must be provided with the opportunity to participate in the community liaison group—
- (b) the relevant planning authorities;
- (c) the relevant highway authorities;
- (d) representatives from Roade Parish Council, Blisworth Parish Council, Milton Malsor Parish Council and Collingtree Parish Council; and
- (e) any other stakeholder that the relevant planning authorities wish to be included.
- (3) The community liaison group must be administered by the undertaker, and operated, in accordance with a protocol agreed with the relevant planning authorities prior to the commencement of the authorised development.
- (4) The community liaison group is to continue to meet until the expiry of five years from full occupation of the authorised development unless otherwise agreed with the relevant planning authorities.
Rail Central
30
Upon the coming into force of the Rail Central Order, the undertaker must allow the Rail Central footpath connections to be made by the Rail Central undertaker in conjunction with the carrying out of the Rail Central development in accordance with a timetable agreed with the relevant planning authority in consultation with the Rail Central undertaker, the objective of such timetable to be to allow the timely provision of the Rail Central footpath connections consistent with the minimisation of any disruption to the construction or operation of the authorised development or development authorised by the Rail Central Order.
31
The undertaker must give Highways England and the local highway authority nine months’ prior notice in writing of the commencement of Works No. 11 and if within the period of three months following the service of that notice Highways England and the local highway authority both notify the undertaker that Works No. 11 is not to be carried out due to the works authorised by the Rail Central Order being considered sufficient by Highways England and the local highway authority to mitigate the impacts of both the Rail Central development and the authorised development then there will thereafter be no requirement to carry out the works comprising Works No. 11 and the entries in respect of Works No. 11 in the table in requirement 6 (design and phasing of highway works) will no longer have effect.
32
If the Rail Central Order comes into force prior to the approval of the details of works comprised in Works No. 1(1)(d) under requirement 8 (detailed design approval), the relevant planning authority, after consultation with Network Rail, will only approve the details if satisfied that the works are compatible with the Rail Central development (meaning that the works do not prevent the construction of a new railway line from the Rail Central development to connect with the existing Northampton Loop railway line).
PART 2 — PROCEDURE FOR APPROVALS ETC. UNDER REQUIREMENTS
Applications made for certain approvals
1
- (1) Where an application has been made to a discharging authority for any consent, agreement or approval required or contemplated under the requirements the discharging authority must give notice to the undertaker of its decision on the application before the end of the decision period.
- (2) For the purposes of sub-paragraph (1), the decision period is—
- (a) where no further information is requested under paragraph 2 of this Part of this Schedule, eight weeks from the day immediately following that on which the application is received by the discharging authority;
- (b) where further information is requested under paragraph 2 of this Part of this Schedule, eight weeks from the day immediately following that on which the further information has been supplied by the undertaker under paragraph 2; or
- (c) such longer period as may be agreed by the undertaker and the discharging authority in writing before the end of the period in paragraph (a) or (b).
2
- (1) In relation to any application to which this Schedule applies, the discharging authority has the right to request such further information from the undertaker as is necessary to enable it to consider the application.
- (2) If the discharging authority considers such further information to be necessary it must, within 20 working days of receipt of the application, notify the undertaker in writing specifying the further information required.
- (3) If the discharging authority does not give such notification as specified in sub-paragraph (2) it is to be deemed to have sufficient information to consider the application and is not subsequently entitled to request further information without the prior agreement of the undertaker.
Fees
3
- (1) Where an application is made to the discharging authority for written consent, agreement or approval in respect of a requirement, a fee calculated in accordance with the Town and Country Planning (Fees for Applications, Deemed Applications, Requests and Site Visits) (England) Regulations 2012[^f00077], as though the application were a reserved matter application, is to be paid to that authority.
- (2) Any fee paid under this Schedule must be refunded to the undertaker within 42 days of—
- (a) the application being rejected as invalidly made; or
- (b) the discharging authority failing to determine the application within the decision period as determined under paragraph 1 of this Part of this Schedule, unless within that period the undertaker agrees, in writing, that the fee is to be retained by the discharging authority and credited in respect of a future application.
Appeals
4
- (1) The undertaker may appeal in the event that—
- (a) the discharging authority refuses an application for any consent, agreement or approval required or contemplated under the requirements, or grants it subject to conditions;
- (b) the discharging authority does not give notice of its decision to the undertaker within the decision period specified in paragraph 1 of this Part of this Schedule;
- (c) on receipt of a request for further information under paragraph 2 of this Part of this Schedule the undertaker considers that either the whole or part of the specified information requested by the discharging authority is not necessary for consideration of the application; or
- (d) on receipt of any further information requested, the discharging authority notifies the undertaker that the information provided is inadequate and requests additional information which the undertaker considers is not necessary for consideration of the application.
- (2) The appeal process is as follows—
- (a) any appeal by the undertaker must be made within 42 days of the date of the notice of the decision or determination, or (where no determination has been made) expiry of the decision period as determined under paragraph 1 of this Part of this Schedule;
- (b) the undertaker must submit the appeal documentation to the Secretary of State and must within 7 working days provide copies of the appeal documentation to the discharging authority and the requirement consultees;
- (c) as soon as is practicable after receiving the appeal documentation, the Secretary of State must appoint a person to determine the appeal (“the appointed person”)[^f00078] and must notify the appeal parties of the identity of the appointed person and the address to which all correspondence for that person’s attention should be sent;
- (d) the discharging authority and the requirement consultees must submit written representations to the appointed person in respect of the appeal within 20 working days of the date on which the appeal parties are notified of the appointment of a person under paragraph (c) and must ensure that copies of their written representations are sent to each other and to the undertaker on the day on which they are submitted to the appointed person;
- (e) the appeal parties are to make any counter-submissions to the appointed person within 20 working days of receipt of written representations under paragraph (d)
- (3) The appointed person must make a decision and notify it to the appeal parties, with reasons, as soon as reasonably practicable.
- (4) The appointment of the person pursuant to paragraph (c) may be undertaken by a person appointed by the Secretary of State for this purpose instead of by the Secretary of State.
- (5) If the appointed person considers that further information is necessary to enable consideration of the appeal the appointed person must, as soon as practicable, notify the appeal parties in writing specifying the further information required, the appeal party from whom the information is sought, and the date by which the information is to be submitted.
- (6) Any further information required under sub-paragraph (5) is to be provided by the party from whom the information is sought to the appointed person and to other appeal parties by the date specified by the appointed person. Any written representations concerning matters contained in the further information must be submitted to the appointed person, and made available to all appeal parties within 10 working days of that date.
- (7) On an appeal under this paragraph, the appointed person must—
- (a) allow or dismiss the appeal; or
- (b) reverse or vary any part of the decision of the discharging authority (whether the appeal relates to that part of it or not),
and may deal with the application as if it had been made to the appointed person in the first instance.
- (8) The appointed person must proceed to a decision on an appeal taking into account only such written representations as have been sent within the prescribed time limits, or time limits set by the appointed person under this paragraph.
- (9) The appointed person must proceed to a decision even though no written representations have been made within the prescribed time limits.
- (10) The decision of the appointed person on an appeal is to be final and binding on the appeal parties, and a court may entertain proceedings for questioning the decision only if the proceedings are brought by a claim for judicial review.
- (11) If an approval is given by the appointed person under this Schedule, it is deemed to be an approval for the purpose of any consent, agreement or approval required under the requirement as if it had been given by the discharging authority. The discharging authority may confirm any determination given by the appointed person in identical form in writing but a failure to give such confirmation (or a failure to give it in identical form) is not to be taken to affect or invalidate the effect of the appointed person’s determination.
- (12) Except where a direction is given under sub-paragraph (13) requiring the costs of the appointed person to be paid by the discharging authority, the reasonable costs of the appointed person are to be met by the undertaker[^f00079].
- (13) On application by the discharging authority or the undertaker, the appointed person may give directions as to the costs of the appeal parties and as to the parties by whom the costs of the appeal are to be paid. In considering whether to make any such direction and the terms on which it is to be made, the appointed person must have regard to the Planning Practice Guidance published by the Department for Communities and Local Government on 6th March 2014 or any circular or guidance which may from time to time replace it.
Interpretation of Part 2 of Schedule 2
5
In this Part of this Schedule—
- “appeal documentation” means the application submitted to the discharging authority, any further information submitted under paragraph 2 of this Part of this Schedule and any notice of a decision to refuse;
- “appeal parties” means the discharging authority, the undertaker and any requirement consultees;
- “discharging authority” means the authority from whom a consent, approval or agreement is required or requested by the undertaker under the requirement concerned;
- “requirement consultee” means any body named in a requirement which is the subject of an appeal as a body to be consulted by the discharging authority in discharging that requirement; and
- “working day” means a day other than Saturday or Sunday, Christmas Day, Good Friday or a bank holiday in England and Wales under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971[^f00080].
SCHEDULE 3 — STREETS SUBJECT TO STREET WORKS
| (1)Area |
(2)Street within the Order limits subject to street works |
| District of South Northamptonshire |
M1 motorway |
| District of South Northamptonshire |
A43 |
| District of South Northamptonshire |
A45 |
| District of South Northamptonshire |
A508 |
| District of South Northamptonshire |
C26 Ashton Road |
| District of South Northamptonshire |
C26 Rookery Lane |
| District of South Northamptonshire |
C27 Stoke Road |
| District of South Northamptonshire |
C85 Pury Road |
| District of South Northamptonshire |
Blisworth Road (Parish of Courteenhall) |
| District of South Northamptonshire |
Blisworth Road (Parish of Roade) |
| District of South Northamptonshire |
Knock Lane |
| District of South Northamptonshire |
Saxon Avenue |
| District of South Northamptonshire |
Unnamed road to Quinton off the A508 |
| Borough of Northampton |
M1 motorway |
| Borough of Northampton |
A43 |
| Borough of Northampton |
A45 |
| Borough of Northampton |
A5123 |
| Borough of Northampton |
C67 Watering Lane |
SCHEDULE 4 — STREETS TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
| (1)Area |
(2)Street to be stopped up |
(3)Extent of stopping up |
(4)New street to be substituted |
| District of South Northamptonshire and Borough of Northampton |
M1 motorway slip road |
The existing highway within the area marked i on the access and rights of way plans (Document 2.3B) shown edged blue with red and white hatching. |
Proposed highway M1 within the area marked ii on the access and rights of way plans (Inset 2A of Document 2.3B) shown edged blue with blue hatching. |
| District of South Northamptonshire |
Blisworth Road(Parish of Roade) |
The existing highway within the area marked iii on the access and rights of way plans (Document 2.3D) shown edged blue with red and white hatching. |
(i) Proposed highway within the area marked iv on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching;(ii) Proposed highway A508 within the area marked v on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching; and(iii) Proposed highway within the area marked vi on the access and rights of way plans (Inset 4B of Document 2.3D) shown edged blue with orange hatching. |
| District of South Northamptonshire |
A508 highway |
The existing highway within the area marked vii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching. |
(i) Proposed highway within the area marked viii on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching; and(ii) Proposed highway A508 within the area marked ix on the access and rights of way plans (Inset 5A of Document 2.3E) shown edged blue with orange hatching. |
| District of South Northamptonshire |
A508 highway |
The existing highway within the area marked x on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching. |
Proposed highway A508 within the area marked xi on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching. |
| District of South Northamptonshire |
C26 Rookery Lane |
The existing highway within the area marked xii on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching. |
Proposed highway C26 within the area marked xiii on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching. |
| District of South Northamptonshire |
C26 Ashton Road |
The existing highway within the area marked xiv on the access and rights of way plans (Document 2.3E) shown edged blue with red and white hatching. |
Proposed highway C26 within the area marked xv on the access and rights of way plans (Inset 5C of Document 2.3E) shown edged blue with orange hatching. |
SCHEDULE 5 — PUBLIC RIGHTS OF WAY
PART 1 — PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH A SUBSTITUTE IS TO BE PROVIDED
| (1)Area |
(2)Public right of way to be stopped up |
(3)Extent of stopping up |
(4)Substitute to be provided |
(5)Stage of the authorised development by which time the stopping up must be completed |
| Parish of Milton Malsor |
Public footpath KX13 (part) |
The existing footpath between the points marked 1-2-3 on the access and rights of way plans (Document 2.3A) shown with a dashed red line. |
Proposed public footpath between the points marked 1-6-7-3 on the access and rights of way plans (Document 2.3A) shown indicatively with a dashed and dotted brown line on a detailed alignment to be agreed with the local highway authority. |
Completion of Works No. 6 |
| Parish of Milton Malsor |
Public footpath KX13 (part) |
The existing footpath between the points marked 3-4 on the access and rights of way plans (Document 2.3A) shown with a dashed red line. |
Proposed cycle track between the points marked 33-34 on the access and rights of way plans (Inset 1A of Document 2.3A) shown with a dashed pink line. |
Completion of Works No. 9 |
| Parish of Collingtree |
Public footpath KG5 |
The existing footpath between the points marked 4-5 on the access and rights of way plans (Document 2.3A) shown with a dashed red line. |
Proposed cycle track between the points marked 34-35 on the access and rights of way plans (Inset 1A of Document 2.3A) shown with a dashed pink line. |
Completion of Works No. 9 |
| Parish of Milton Malsor |
Public footpath KX17 |
The existing footpath between the points marked 2-31 on the access and rights of way plans (Document 2.3A and 2.3C) shown with a dashed red line. |
Proposed cycle track between the points marked 33-32-8-28-29 on the access and rights of way plans (Documents 2.3A, (including Inset 1A) 2.3B and 2.3C) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority. |
Completion of Works No. 6 |
| Parish of Roade |
Public footpath KZ2a (part) |
The existing footpath between the points marked 14-15 on the access and rights of way plans (Document 2.3D) shown with a dashed red line. |
(i) Proposed public footpath between the points marked 14-16 on the access and rights of way plans (Document 2.3D) shown indicatively with a dashed and dotted brown line on a detailed alignment to be agreed with the local highway authority; and(ii) Proposed public footpath between the points marked 17-15 on the access and rights of way plans (Document 2.3D) shown indicatively with a dashed and dotted brown line on a detailed alignment to be agreed with the local highway authority. |
Completion of Works No. 13 |
| Parish of Roade |
Public bridleway KZ10 (part) |
The existing bridleway between the points marked 18-19 on the access and rights of way plans (Document 2.3D) shown with a dashed red line. |
Proposed public bridleway between the points marked 18-21 on the access and rights of way plans (Document 2.3D) shown indicatively with an unbroken yellow line on a detailed alignment to be agreed with the local highway authority. |
Completion of Works No. 13 |
| Parish of Stoke Bruerne |
Public bridleway RZ1 (part) |
The existing bridleway between the points marked 19-20 on the access and rights of way plans (Document 2.3D) shown with a dashed red line. |
Proposed public bridleway between the points marked 21-20 on the access and rights of way plans (Document 2.3D) shown indicatively with an unbroken yellow line on a detailed alignment to be agreed with the local highway authority. |
Completion of Works No. 13 |
PART 2 — PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
| (1)Area |
(2)Public right of way to be stopped up |
(3)Extent of stopping up |
(4)Stage of the authorised development |
| Parish of Roade |
Public footpath KZ19 (part) |
The existing footpath between the points marked 12-13 on the access and rights of way plans (Document 2.3D) shown with a dashed red line. |
Commencement of Works No. 13 |
| Parish of Stoke Bruerne |
Public footpath RZ3 (part) |
The existing footpath between the points marked 23-24 on the access and rights of way plans (Document 2.3D) shown with a dashed red line. |
Commencement of Works No. 13 |
| Parish of Stoke Bruerne |
Public bridleway RZ6 (part) |
The existing bridleway between the points marked 25-26 on the access and rights of way plans (Inset 5A of Document 2.3E) shown with a dashed red line. |
Commencement of Works No. 13 |
PART 3 — NEW PUBLIC RIGHTS OF WAY TO BE CREATED
| (1)Area |
(2)Public right of way to be created |
(3)Extent of new public right of way to be created |
(4)Stage of the authorised development |
| Parish of Roade |
Cycle track |
Proposed cycle track between the points marked 18-22 on the access and rights of way plans (Document 2.3D) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 13. |
Completion of Works No. 13 |
| Parish of Milton Malsor |
Public footpath |
Proposed public footpath between the points marked 6-27 of the access and rights of way plans (Document 2.3A) shown indicatively with a dashed and dotted brown line detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 6. |
Completion of Works No. 6 |
| Parish of Milton Malsor |
Cycle track |
Proposed cycle track between the points marked 28-30 on the access and rights of way plans (Document 2.3B) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works Nos. 4, 5 and 6. |
Completion of Works No. 7 |
| Parish of Milton Malsor |
Cycle track |
Proposed cycle track between the points marked 9-10 on the access and rights of way plans (Document 2.3C) shown indicatively with a dashed pink line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works No. 4. |
Completion of Works No. 6 |
| Parish of Milton Malsor |
Public footpath |
Proposed public footpath between the points marked 10-11-1 on the access and rights of way plans (Documents 2.3A and 2.3C) shown indicatively with a dashed and dotted brown line on a detailed alignment to be agreed with the local highway authority and constructed as part of Works Nos. 4 and 6. |
Completion of Works No. 6 |
SCHEDULE 6 — PRIVATE MEANS OF ACCESS
PART 1 — PRIVATE MEANS OF ACCESS TO BE REPLACED
| (1)Area |
(2)Extent |
(3)Replacement |
(4)Stage of the authorised development |
| District of South Northamptonshire |
The private means of access shaded purple and marked F on the access and rights of way plans (Document 2.3B). |
The private means of access hatched turquoise and marked G on the access and rights of way plans (Document 2.3B). |
Completion of Works No. 7 |
| District of South Northamptonshire |
The private means of access shaded purple and marked K on the access and rights of way plans (Document 2.3C). |
The private means of access hatched turquoise and marked L on the access and rights of way plans (Document 2.3C). |
Completion of Works No. 7 |
| District of South Northamptonshire |
The private means of access shaded purple and marked N on the access and rights of way plans (Document 2.3C). |
The private means of access hatched turquoise and marked P on the access and rights of way plans (Document 2.3C). |
Completion of Works No. 7 |
| District of South Northamptonshire |
The private means of access shaded purple and marked Q on the access and rights of way plans (Document 2.3C). |
The private means of access hatched turquoise and marked R on the access and rights of way plans (Document 2.3C). |
Completion of Works No. 7 |
| District of South Northamptonshire |
The private means of access shaded purple and marked S on the access and rights of way plans (Document 2.3D). |
The private means of access hatched turquoise and marked T on the access and rights of way plans (Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked U on the access and rights of way plans (Document 2.3D). |
The private means of access hatched turquoise and marked V on the access and rights of way plans (Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked Won the access and rights of way plans (Inset 4C of Document 2.3D). |
The private means of access hatched turquoise and marked X on the access and rights of way plans (Inset 4D of Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked Y on the access and rights of way plans (Inset 4C of Document 2.3D). |
The private means of access hatched turquoise and marked Z on the access and rights of way plans (Inset 4D of Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AA on the access and rights of way plans (Inset 4C of Document 2.3D). |
The private means of access hatched turquoise and marked AB on the access and rights of way plans (Inset 4D of Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AD on the access and rights of way plans (Inset 4C of Document 2.3D). |
The private means of access hatched turquoise and marked AF on the access and rights of way plans (Inset 4D of Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AE on the access and rights of way plans (Inset 4C of Document 2.3D). |
The private means of access hatched turquoise and marked AX on the access and rights of way plans (Inset 4B of Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AJ on the access and rights of way plans (Inset 5B of Document 2.3E). |
The private means of access hatched turquoise and marked AK on the access and rights of way plans (Inset 5B of Document 2.3E). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AL on the access and rights of way plans (Inset 5A of Document 2.3E). |
The private means of access hatched turquoise and marked AM on the access and rights of way plans (Inset of 5B of Document 2.3E). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AN on the access and rights of way plans (Inset 5B of Document 2.3E). |
The private means of access hatched turquoise and marked AP on the access and rights of way plans (Inset 5B of Document 2.3E). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AS on the access and rights of way plans (Inset 5C of Document 2.3E). |
The private means of access hatched turquoise and marked AT on the access and rights of way plans (Inset 5D of Document 2.3E). |
Completion of Works No. 14 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AU on the access and rights of way plans (Inset 5C of Document 2.3E). |
The private means of access hatched turquoise and marked AV on the access and rights of way plans (Inset 5D of Document 2.3E). |
Completion of Works No. 14 |
PART 2 — PRIVATE MEANS OF ACCESS TO BE CLOSED FOR WHICH NO SUBSTITUTE IS TO BE PROVIDED
| (1)Area |
(2)Private Means of Access |
(3)Stage of the authorised development |
| District of South Northamptonshire |
The private means of access shaded purple and marked A on the access and rights of way plans (Document 2.3A). |
Commencement of Works No. 6 |
| District of South Northamptonshire |
The private means of access shaded purple and marked B on the access and rights of way plans (Document 2.3A). |
Commencement of Works No. 6 |
| District of South Northamptonshire |
The private means of access shaded purple and marked E on the access and rights of way plans (Document 2.3B). |
Commencement of Works No. 6 |
| District of South Northamptonshire |
The private means of access shaded purple and marked H on the access and rights of way plans (Document 2.3B). |
Commencement of Works No. 6 |
| District of South Northamptonshire |
The private means of access shaded purple and marked J on the access and rights of way plan (Document 2.3C). |
Commencement of Works No. 7 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AQ on the access and rights of way plans (Inset 5B of Document 2.3E). |
Commencement of Works No. 13 |
| District of South Northamptonshire |
The private means of access shaded purple and marked AW on the access and rights of way plans (Document 2.3A). |
Commencement of Works No. 6 |
| Borough of Northampton |
The private means of access shaded purple and marked D on the access and rights of way plans (Document 2.3B). |
Commencement of Works No. 8 |
PART 3 — NEW PRIVATE MEANS OF ACCESS CREATED
| (1)Area |
(2)Private Means of Access |
(3)Stage of the authorised development |
| District of South Northamptonshire |
The private means of access hatched turquoise and marked M on the access and rights of way plans (Document 2.3C). |
Completion of Works No. 7 |
| District of South Northamptonshire |
The private means of access hatched turquoise and marked AG on the access and rights of way plans (Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access hatched turquoise and marked AH on the access and rights of way plans (Document 2.3D). |
Completion of Works No. 13 |
| District of South Northamptonshire |
The private means of access hatched turquoise and marked AR on the access and rights of way plans (Inset 4A of Document 2.3D). |
Completion of Works No. 13 |
SCHEDULE 7 — CLASSIFICATION OF HIGHWAYS
PART 1 — NEW HIGHWAYS
| (1)Area |
(2)Extent of Highway |
(3)Classification |
(4)Classes of Traffic |
(5)Relevant Highway Authority |
| District of South Northamptonshire and Borough of Northampton |
The length of highway the centreline of which is shown coloured light blue and between the points 3 and 4 on the highway classification plans (Document 2.5A). |
Special Road |
Class I and II |
Highways England |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and following a circular route around points 11, 12 and returning to 11 on the highway classification plans (Document 2.5B). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and between the points 12 and 13 on the highway classification plans (Documents 2.5B and 2.5C). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and following a circular route around points 13, 14, 15, 16 and returning to 13 on the highway classification plans (Document 2.5C). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured brown and between the points 14 and 18 on the highway classification plans (Document 2.5C). |
Unclassified |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured brown and between the points 16 and 17 on the highway classification plans (Document 2.5C). |
Unclassified |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and between the points 15 and 19 on the highway classification plans (Document 2.5C). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and following a circular route around points 19, 20, 21 and returning to 19 on the highway classification plans (Document 2.5C). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured pink and between the points 20 and 22 on the highway classification plans (Document 2.5C). |
Classified |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and between the points 21 and 23 on the highway classification plans (Document 2.5C). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark green and between the points 24 to 27 on the highway classification plans (Document 2.5D). |
Principal |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured pink and between the points 25 and 28 on the highway classification plans (Document 2.5D). |
Classified |
All purpose |
The local highway authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured pink and between the points 26 and 29 on the highway classification plans (Document 2.5D). |
Classified |
All purpose |
The local highway authority |
PART 2 — EXISTING HIGHWAYS
| (1)Area |
(2)Extent of Highway |
(3)(i) Current Classification(ii) Highway Authority |
(4)Event determining change of classification |
(5)Proposed Classification |
(6)Classes of Traffic |
(7)Highway Authority |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark blue and between the points 1 and 2 on the highway classification plans (Document 2.5A). |
(i) All Purpose Trunk Road(ii) Highways England |
Opening to traffic of the length of highway stated in column (2). |
Special Road |
Class I and Class II |
Highways England |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured orange and between the points 5 and 6 on the highway classification plans (Document 2.5A). |
(i) Unclassified Road(ii) The local highway authority |
Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B). |
Trunk Road |
All purpose |
Highways England |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured dark blue and between the points 7 and 8 on the highway classification plans (Document 2.5A). |
(i) All Purpose Trunk Road(ii) Highways England |
Opening to traffic of the length of highway stated in column (2). |
Special Road |
Class I and Class II |
Highways England |
| District of South Northamptonshire |
The length of highway the centreline of which is shown coloured orange and between the points 9 and 10 on the highway classification plans (Document 2.5A). |
(i) Principal Road(ii) The local highway authority |
Commencement of Works No. 8 shown on the works plans (Documents 2.2A and 2.2B). |
Trunk Road |
All purpose |
Highways England |
SCHEDULE 8 — SPEED LIMITS
PART 1 — EXISTING ORDERS
PART 2 — HIGHWAYS SUBJECT TO 50MPH SPEED LIMIT
| (1)Location |
(2)Description |
(3)Event |
| A45 Northbound |
From a point 80 metres north of the M1 overbridge to a point 390 metres north of the junction between the A45 and Watering Lane; the centreline of which is shown coloured green between points A and B as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 8 |
| A45 Southbound |
From a point 390 metres north of the junction between the A45 and Watering Lane to a point 115 metres north of the M1 overbridge; the centreline of which is shown coloured green between points C and E as shown on the speed limit plans (Document 2.7A) |
Completion of Works No. 8 |
| A45 Southbound merge slip road from the Bridge Meadow Way roundabout |
From a point 165 metres north of the merge with the A45 southbound to the merge itself; the centreline of which is shown coloured green between points F and D as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 8 |
| A45 signalised roundabout at M1 Junction 15 |
The circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points E, G, H, J, K, L, A and returning to E as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 8 |
| Link road within A45 signalised roundabout at M1 Junction 15 |
The link road within the circulatory carriageway at the junction between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured green between points H and L as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 8 |
| Saxon Avenue |
From the junction between Saxon Avenue and the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to a point 30 metres west of that junction; the centreline of which is shown coloured green between points G and M as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 8 |
| A508 Northbound |
From the roundabout junction between the A508 and the main site access road to the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15; the centreline of which is shown coloured orange between points N and P as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 7 |
| A508 Southbound |
From the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 Junction 15 to the roundabout junction between the A508 and the main site access road; the centreline of which is shown coloured orange between points Q and R as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 7 |
| A508 Northampton Road and rail terminal access road roundabout |
The circulatory carriageway of the roundabout junction between the main site access road and Northampton Road; the centreline of which is shown coloured orange between points N, R, S and returning to N as shown on the speed limit plans (Document 2.7A). |
Completion of Works No. 7 |
| A508 Northampton Road |
From the roundabout junction between the A508 and the main site access road to a point 30 metres north of the junction between the A508 and the unnamed road to Quinton; the centreline of which is shown coloured orange between points S and T as shown on the speed limit plans (Documents 2.7A and 2.7B). |
Completion of Works No. 7 |
| A508 Roade Bypass and Northampton Road roundabout |
The circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Northampton Road; the centreline of which is shown coloured orange between points U, AL, V and returning to U as shown on the speed limit plans (Document 2.7B). |
Completion of Works No. 13 |
| Stratford Road |
From a point 512 metres south of the junction between Stratford Road and High Street to the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AG and AJ as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| A508 Roade Bypass and Stratford Road roundabout |
The circulatory carriageway of the roundabout junction between the A508 Roade Bypass and Stratford Road; the centreline of which is shown coloured orange between points AF, AG, AH and returning to AF as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| A508 |
From a point 250 metres south of the roundabout junction between the A508 Roade Bypass and Stratford Road to that junction; the centreline of which is shown coloured orange between points AH and AK as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| Northampton Road |
From the roundabout junction between the A508 Roade Bypass and Northampton Road to a point 162 metres south of that roundabout; the centreline of which is shown coloured orange between points AL and AM as shown on the speed limit plans (Document 2.7B). |
Completion of Works No. 13 |
PART 3 — DERESTRICTED HIGHWAYS
| (1)Location |
(2)Description |
(3)Event |
| A508 Roade Bypass |
From the roundabout junction between the A508 Roade Bypass and Northampton Road to a point 140 metres west of that junction; the centreline of which is shown coloured light blue between points V and W as shown on the speed limit plans (Document 2.7B). |
Completion of Works No. 13 |
| A508 Roade Bypass |
From a point 140 metres north of the roundabout junction between the A508 Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points X and Y as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| A508 Roade Bypass and Blisworth Road roundabout |
The circulatory carriageway of the roundabout junction between the Roade Bypass and Blisworth Road (Parish of Roade); the centreline of which is shown coloured light blue between points Y, Z, AA, AB and returning to Y as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| A508 Roade Bypass |
From a point 140 metres south of the roundabout junction between the A508 Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points AA and AD as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| Blisworth Road (Parish of Roade) |
From a point 140 metres west of the roundabout junction between the Roade Bypass and Blisworth Road (Parish of Roade) to that junction; the centreline of which is shown coloured light blue between points AB and AC as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
| A508 Roade Bypass |
From a point 140 metres north of the roundabout junction between the A508 Roade Bypass and Northampton Road to that junction; the centreline of which is shown coloured light blue between points AE and AF as shown on the speed limit plans (Document 2.7C). |
Completion of Works No. 13 |
PART 4 — TEMPORARY SPEED LIMITS
| (1)Location |
(2)Temporary limit to be imposed |
(3)Description |
(4)Duration |
| A45 Northbound |
50mph |
From a point 20 metres north of the roundabout junction with the M1 to a point 300 metres before the start of the diverge to the Wootton Interchange. |
From commencement of Works No. 8 until completion of Works No. 8 |
| A45 Southbound |
50mph |
From the diverge at the Wootton Interchange to a point 110 metres north of the roundabout junction with the M1. |
From commencement of Works No. 8 until completion of Works No. 8 |
| A508 |
40mph |
From a point 30 metres north of the junction between the A508 and the unnamed road to Quinton to the circulatory carriageway at M1 Junction 15. |
From commencement of any of Works Nos. 1 to 6 until completion of Works No. 7 |
| A508 |
30mph |
From a point 68 metres south of the junction between the A508 and Field View to a point 500 metres south of the junction between the A508 and the C26 Ashton Road. |
From commencement of Works No. 14 until completion of Works No. 14 |
| A508 |
30mph |
From a point 400 metres north of the junction between the A508 and the C85 Pury Road to a point 250 metres south of that junction. |
From commencement of Works No. 14 until completion of Works No. 14 |
| M1 Northbound |
50mph |
From a point 1 kilometre before the start of the diverge to junction 15 to a point 50 metres south of overbridge at junction 15. |
From commencement of Works No. 8 until completion of Works No. 8 |
| M1 Southbound |
50mph |
From a point 1 kilometre before the start of the diverge to junction 15 to a point 170 metres north of the end of the merge at junction 15. |
From commencement of Works No. 8 until completion of Works No. 8 |
SCHEDULE 9 — TRAFFIC REGULATION
PART 1 — AMENDMENTS TO EXISTING ORDERS
| (1)Statutory Instrument/ Order Title |
(2)Changes |
(3)Event |
| The County of Northampton (Church Lane, Blisworth) (Weight Restriction) Order 1971 |
To be revoked in its entirety |
Opening to traffic of the Roade Bypass constructed as part of Works No. 13 as shown on the works plans (Documents 2.2D and 2.2E). |
PART 2 — CLEARWAYS
| (1)Location |
(2)Description |
(3)Event |
| A508 Southbound |
From the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at M1 junction 15 to the roundabout junction between the A508 and the main site access road, the centreline of which is shown coloured purple between points 1 and 2 on the traffic regulation plan (Document 2.6A). |
Completion of Works No. 7 |
| A508 Northbound |
From the roundabout junction between the A508 and the rail terminal access road to the junction with the circulatory carriageway at the signalised roundabout between the A45, A508 and M1 slip roads at the M1 junction 15; the centreline of which is shown coloured purple between points 3 and 4 as shown on the traffic regulation plan (Document 2.6A). |
Completion of Works No. 7 |
PART 3 — ENVIRONMENTAL WEIGHT LIMIT
| (1)Location |
(2)Zone |
(3)Terminal points |
(4)Event |
| Parish of Courteenhall and Parish of Quinton |
A |
(i) Unnamed Road to Quinton, at its junction with the A508 Northampton Road as shown at point 7 on the traffic regulation plans (Document 2.6A); and(ii) Courteenhall Road (Parish of Quinton), at its junction with the C23 Hartwell Road as shown at point 8 on the traffic regulation plans (Inset A of Document 2.6B). |
Commencement of any of Works Nos. 1 to 6 |
| Parish of Blisworth, Parish of Courteenhall, Parish of Easton Neston, Parish of Paulerspury, Parish of Roade, Parish of Shutlanger, andParish of Stoke Bruerne |
B |
(i) Blisworth Road (Parish of Courteenhall), at its junction with the A508 Northampton Road as shown at point 9 on the traffic regulation plans (Document 2.6A);(ii) Courteenhall Road (Parish of Blisworth), at its junction with the C188 Northampton Road / High Street as shown at point 10 on the traffic regulation plans (Inset B of Document 2.6B);(iii) C27 Stoke Road, at its junction with the C188 High Street as shown at point 11 on the traffic regulation plans (Inset B of Document 2.6B);(iv) Church Lane, at its junction with the C188 High Street as shown at point 12 on the traffic regulation plans (Inset B of Document 2.6B);(v) Blisworth Road (Parish of Roade), at its junction with the A508 Roade Bypass as shown at point 13 on the traffic regulation plans (Inset C of Document 2.6B);(vi) Showsley Road, at its junction with the A43 Oxford Road as shown at point 14 on the traffic regulation plans (Inset D of Document 2.6B);(vii) C26 Shutlanger Road, at its junction with the A5 Watling Street as shown at point 15 on the traffic regulation plans (Inset E of Document 2.6B);(viii) C26 Rookery Lane, at its junction with the A508 as shown at point 16 on the traffic regulation plans (Inset F of Document 2.6B); and(ix) Grafton Road, at its junction with the A508 and as shown at point 17 on the traffic regulation plans (Inset G of Document 2.6B). |
Completion of Works No. 13 |
| Parish of Ashton, Parish of Roade and Parish of Stoke Bruerne |
C |
(i) Northampton Road, at its junction with the A508 Roade Bypass as shown at point 18 on the traffic regulation plans (Inset H of Document 2.6B);(ii) C48 Hartwell Road, at its junction with the C26 Ashton Road as shown at point 19 on the traffic regulation plans (Inset J of Document 2.6B);(iii) Roade Hill, at its junction with the C26 Stoke Road as shown at point 20 on the traffic regulation plans (Inset K of Document 2.6B);(iv) Stratford Road, at its junction with the A508 Roade Bypass as shown at point 21 on the traffic regulation plans (Inset L of Document 2.6B); and(v) Blisworth Road (Parish of Roade) at its junction with the A508 Roade Bypass as shown at point 22 on the traffic regulation plans (Inset C of Document 2.6B). |
Completion of Works No. 13 |
| Parish of Collingtree and Parish of East Hunsbury |
D |
(i) C23 Rowtree Road, at its junction with the A45 London Road as shown at point 23 on the traffic regulation plans (Inset M of Document 2.6B);(ii) Penvale Road, at its junction with the A5076 Mere Way as shown at point 24 on the traffic regulation plans (Inset N of Document 2.6B);(iii) Clannell Road, at its junction with the C188 Towcester Road as shown at point 25 on the traffic regulation plans (Inset P of Document 2.6B); and(iv) C23 Rowtree Road, at its junction with the C188 Towcester Road as shown at point 26 on the traffic regulation plans (Inset Q of Document 2.6B). |
Commencement of any of Works Nos. 1 to 6 |
PART 4 — PROHIBITED MOVEMENTS
| (1)Location |
(2)Prohibited Movement |
| At the junction between the A508 Northampton Road and Blisworth Road in the Parish of Courteenhall |
Right turn from the A508 Northampton Road onto Blisworth Road (Parish of Courteenhall); shown at point 5 on the traffic regulation plans (Document 2.6A) |
| At the junction between the A508 Northampton Road and Blisworth Road in the Parish of Courteenhall |
Right turn from Blisworth Road (Parish of Courteenhall) onto the A508 Northampton Road; shown at point 6 on the traffic regulation plans (Document 2.6A) |
SCHEDULE 10 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1)Area |
(2)Number of land shown on land plan |
(3)Purpose for which temporary possession may be taken |
(4)Relevant part of the authorised development |
| District of South Northamptonshire |
3/3 |
Landscaping, drainage and ecological works |
Works No. 6 |
| District of South Northamptonshire |
4/1 |
Alteration to private access as part of construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
4/2 |
Alteration to private access as part of construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
4/2a |
Construction of Roade bypass (temporary construction compound) |
Works No. 13 |
| District of South Northamptonshire |
4/14 |
Alteration to private access as part of construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
4/15 |
Alteration to private access as part of construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
4/16 |
Construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
4/20a |
Construction of Roade bypass |
Works No. 14 |
| District of South Northamptonshire |
5/2 |
Construction of Roade bypass (temporary construction compound) |
Works No. 13 |
| District of South Northamptonshire |
5/3 |
Alteration to private access as part of construction of Roade bypass |
Works No. 13 |
| District of South Northamptonshire |
5/10 |
Alteration to private access as part of new highway works at the junction of the A508 and C85 |
Works No. 14 |
SCHEDULE 11 — LAND IN WHICH NEW RIGHTS MAY BE CREATED
| (1)Area |
(2)Plot of land shown on Land Plan |
(3)Relevant part of Authorised Development |
| District of South Northamptonshire |
1/14 (in respect of bridge only) |
Works No. 9 |
| District of South Northamptonshire |
4/3 |
Works No. 13 |
| District of South Northamptonshire |
4/4 |
Works No. 13 |
| District of South Northamptonshire |
4/5 |
Works No. 13 |
| District of South Northamptonshire |
4/5a (in respect of bridge only) |
Works No. 13 |
| District of South Northamptonshire |
4/7 |
Works No. 13 |
| District of South Northamptonshire |
4/8 |
Works No. 13 |
| Borough of Northampton |
1/40 |
Works No. 9 |
| Borough of Northampton |
1/44 |
Works No. 9 |
| Borough of Northampton |
1/45 |
Works No. 9 |
| Borough of Northampton |
2/1 |
Works No. 10 |
| Borough of Northampton |
2/2 |
Works No. 10 |
| Borough of Northampton |
2/3 |
Works No. 10 |
| Borough of Northampton |
2/4 |
Works No. 10 |
| Borough of Northampton |
2/5 |
Works No. 10 |
SCHEDULE 12 — MODIFICATIONS OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications set out in this Schedule as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation on paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
- (2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—
(5A) If—
(a) the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) (powers of entry) of the 1965 Act (as modified by paragraph 5(5) of Schedule 12 to the Northampton Gateway Rail Freight Interchange Order 2019);
(b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A (counter-notice requiring purchase of land not in notice to treat) to the 1965 Act (as substituted by paragraph 5(8) of Schedule 12 to the Northampton Gateway Rail Freight Interchange Order 2019 to acquire an interest in the land; and
(c) the acquiring authority enters on and takes possession that land,
the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purposes of excising that right.
3
- (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973[^f00081] has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
- (a) for “land is acquired or taken” substitute “a right over land is purchased”; and
- (b) for “acquired or taken from him” substitute “over which the right is exercisable”.
Application of Part 1 of the 1965 Act
4
Part 1 of the 1965 Act as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act, and modified by article 30 (modification of Part 1 of the 1965 Act) to the compulsory acquisition of land under article 24 (compulsory acquisition of land) applies to the compulsory acquisition of a right by the creation of a new right under article 25 (compulsory acquisition of rights)—
- (a) with the modifications specified in paragraph 5; and
- (b) with other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows.
- (2) References in the 1965 Act to land are read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired; or
- (b) the land over which the right is or is to be exercisable.
- (3) For section 7 (measure of compensation) of the 1965 Act substitute—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired is depreciated by the acquisition of the right but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
- (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (persons without power to sell their interests);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired is vested absolutely in the acquiring authority.
- (5) Section 11[^f00082] (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 24 (compulsory acquisition of land), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right; and sections 11A[^f00083] (powers of entry: further notices of entry), 11B[^f00084] (counter-notice requiring possession to be taken on a specified date), 12[^f00085] (penalty for unauthorised entry) and 13[^f00086] (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.