The Northampton Gateway Rail Freight Interchange Order 2019
- (6) Section 20[^f00087] (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 30(2) (modification of Part 1 the 1965 Act) is modified so as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
- (8) For schedule 2A to the 1965 Act substitute—
SCHEDULE 2A (1) This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 (execution of declaration) of the 1981 Act as applied by article 31 (application of the 1981 Act) of the Northampton Gateway Rail Freight Interchange Order 2019 in respect of the land to which the notice to treat relates. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the authority do not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right, (b) the use to be made of the right proposed to be acquired, and (c) if the right is proposed to be acquired for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take. (13) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 13 — PROTECTIVE PROVISIONS
PART 1 — FOR PROTECTION OF RAILWAY INTERESTS
1
The provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and Network Rail and, in the case of paragraph 15 of this Part of this Schedule, any other person on whom rights or obligations are conferred by that paragraph.
2
In this Part of this Schedule—
- “construction” includes execution, placing, alteration and reconstruction, and “construct” and “constructed” are to be construed accordingly;
- “the engineer” means an engineer appointed by Network Rail for the purposes of this Order;
- “network licence” means the network licence, as the same is amended from time to time, granted to Network Rail Infrastructure Limited by the Secretary of State in exercise of powers under section 8 (licences) of the Railways Act l993[^f00088];
- “Network Rail” means Network Rail Infrastructure Limited and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 (meaning of “subsidiary” etc.) of the Companies Act 2006[^f00089]) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;
- “plans” includes sections, designs, design data, software, drawings, specifications, soil reports, calculations, descriptions (including descriptions of methods of construction), staging proposals, programmes and details of the extent, timing and duration of any proposed occupation of railway property;
- “railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993) or station lease;
- “railway property” means any railway belonging to Network Rail Infrastructure Limited and— any station, land, works, apparatus and equipment belonging to Network Rail Infrastructure Limited or connected with any such railway; and any easement or other property interest held or used by Network Rail Infrastructure Limited for the purposes of such railway or works, apparatus or equipment;
- “specified work” means so much of any of the authorised works as is situated upon, across, under, over or within 15 metres of, or may in any way adversely affect, railway property; and
- “working day” means a day other than Saturday or Sunday, Christmas Day, Good Friday or a bank holiday in England and Wales under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971[^f00090].
3
- (1) Where under this Part of this Schedule Network Rail is required to give its consent or approval in respect of any matter, that consent or approval is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute.
- (2) In so far as any specified work or the acquisition or use of railway property is or may be subject to railway operational procedures, Network Rail must—
- (a) co-operate with the undertaker with a view to avoiding undue delay and securing conformity as between any plans approved by the engineer and requirements emanating from those procedures; and
- (b) use their reasonable endeavours to avoid any conflict arising between the application of those procedures and the proper implementation of the authorised works pursuant to this Order.
4
- (1) The undertaker must not exercise the powers conferred by—
- (a) article 5 (authorisation of use);
- (b) article 6 (maintenance of the authorised development);
- (c) article 12 (public rights of way – creation, substitution and stopping up);
- (d) article 13 (accesses);
- (e) article 22 (authority to survey and investigate the land);
- (f) article 24 (compulsory acquisition of land);
- (g) article 25 (compulsory acquisition of rights);
- (h) article 26 (private rights);
- (i) article 27 (power to override easements and other rights);
- (j) article 32 (statutory undertakers and operators of the electronic communications code network);
- (k) article 34 (temporary use of land for carrying out the authorised development);
- (l) article 35 (temporary use of land for maintaining the authorised development);
- (m) article 38 (operation and use of railways);
- (n) article 42 (felling or lopping of trees and removal of hedgerows),
or the powers conferred by section 11(3) (powers of entry) of the 1965 Act in respect of any railway property unless the exercise of such powers is with the consent of Network Rail.
- (2) The undertaker must not, in the exercise of the powers conferred by this Order, prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail.
- (3) The undertaker must not exercise the powers conferred by sections 271 or 272[^f00091] of the 1990 Act or, article 32, in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail.
- (4) The undertaker must not under the powers conferred by this Order acquire or use or acquire new rights over any railway property except with the consent Network Rail.
- (5) Where Network Rail is asked to give its consent pursuant to this paragraph, such consent must not be unreasonably withheld but may be given subject to reasonable conditions.
5
- (1) The undertaker must before commencing construction of any specified work supply to Network Rail proper and sufficient plans of that work for the reasonable approval of the engineer and the specified work must not be commenced except in accordance with such plans as have been approved in writing by the engineer or settled in accordance with paragraph 22 of this Part of this Schedule.
- (2) The approval of the engineer under sub-paragraph (1) must not be unreasonably withheld, and if by the end of the period of 28 days beginning with the date on which such plans have been supplied to Network Rail the engineer has not intimated his or her disapproval of those plans and the grounds of such disapproval the undertaker may serve upon the engineer written notice requiring the engineer to intimate approval or disapproval within a further period of 28 days beginning with the date upon which the engineer receives written notice from the undertaker. If by the expiry of the further 28 days the engineer has not intimated approval or disapproval, the engineer is deemed to have approved the plans as submitted.
- (3) If by the end of the period of 28 days beginning with the date on which written notice was served upon the engineer under sub-paragraph (2), Network Rail gives notice to the undertaker that Network Rail desires itself to construct any part of a specified work which in the opinion of the engineer will or may affect the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker desires such part of the specified work to be constructed, Network Rail must construct it without unnecessary delay on behalf of and to the reasonable satisfaction of the undertaker in accordance with the plans approved or deemed to be approved or settled under this paragraph, and under the supervision (where appropriate and if given) of the undertaker.
- (4) When signifying his or her approval of the plans the engineer may specify any protective works (whether temporary or permanent) which in the engineer’s opinion should be carried out before the commencement of the construction of a specified work to ensure the safety or stability of railway property or the continuation of safe and efficient operation of the railways of Network Rail or the services of operators using the same (including any relocation de-commissioning and removal of works, apparatus and equipment necessitated by a specified work and the comfort and safety of passengers who may be affected by the specified works), and such protective works as may be reasonably necessary for those purposes must be constructed by Network Rail or by the undertaker, if Network Rail so desires, and such protective works must be carried out at the expense of the undertaker in either case without unnecessary delay and the undertaker must not commence the construction of the specified works until the engineer has notified the undertaker that the protective works have been completed to his or her reasonable satisfaction.
6
- (1) Any specified work and any protective works to be constructed by virtue of paragraph 5(4) of this Part of this Schedule must, when commenced, be constructed—
- (a) without unnecessary delay in accordance with the plans approved or deemed to have been approved or settled under paragraph 5;
- (b) under the supervision (where appropriate and if given) and to the reasonable satisfaction of the engineer;
- (c) in such manner as to cause as little damage as is possible to railway property; and
- (d) so far as is reasonably practicable, so as not to interfere with or obstruct the free, uninterrupted and safe use of any railway of Network Rail or the traffic thereon and the use by passengers of railway property.
- (2) If any damage to railway property or any such interference or obstruction is caused by the carrying out of, or in consequence of the construction of a specified work, the undertaker must, notwithstanding any such approval, make good such damage and must pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may sustain by reason of any such damage, interference or obstruction.
- (3) Nothing in this Part of this Schedule imposes any liability on the undertaker with respect to any damage, costs, expenses or loss attributable to the negligence of Network Rail or its servants, contractors or agents or any liability on Network Rail with respect of any damage, costs, expenses or loss attributable to the negligence of the undertaker or its servants, contractors or agents.
7
The undertaker must—
- (a) at all times afford reasonable facilities to the engineer for access to a specified work during its construction; and
- (b) supply the engineer with all such information as he or she may reasonably require with regard to a specified work or the method of constructing it.
8
Network Rail must at all times afford reasonable facilities to the undertaker and its agents for access to any works carried out by Network Rail under this Part of this Schedule during their construction and must supply the undertaker with such information as it may reasonably require with regard to such works or the method of constructing them.
9
- (1) If any permanent or temporary alterations or additions to railway property, are reasonably necessary in consequence of the construction of a specified work, or during a period of 24 months after the completion of that work in order to ensure the safety of railway property or the continued safe operation of the railway of Network Rail, such alterations and additions may be carried out by Network Rail and if Network Rail gives to the undertaker reasonable notice of its intention to carry out such alterations or additions (which must be specified in the notice), the undertaker must pay to Network Rail the reasonable cost of those alterations or additions including, in respect of any such alterations and additions as are to be permanent, a capitalised sum representing the increase of the costs which may be expected to be reasonably incurred by Network Rail in maintaining, working and, when necessary, renewing any such alterations or additions.
- (2) If during the construction of a specified work by the undertaker, Network Rail gives notice to the undertaker that Network Rail desires itself to construct that part of the specified work which in the opinion of the engineer is endangering the stability of railway property or the safe operation of traffic on the railways of Network Rail then, if the undertaker decides that part of the specified work is to be constructed, Network Rail must assume construction of that part of the specified work and the undertaker must, notwithstanding any such approval of a specified work under paragraph 5(3) of this Part of this Schedule, pay to Network Rail all reasonable expenses to which Network Rail may be put and compensation for any loss which it may suffer by reason of the execution by Network Rail of that specified work.
- (3) The engineer must, in respect of the capitalised sums referred to in this paragraph and paragraph 10(a) of this Part of this Schedule provide such details of the formula by which those sums have been calculated as the undertaker may reasonably require.
- (4) If the cost of maintaining, working or renewing railway property is reduced in consequence of any such alterations or additions a capitalised sum representing such saving must be set off against any sum payable by the undertaker to Network Rail under this paragraph.
10
The undertaker must repay to Network Rail all reasonable fees, costs, charges and expenses reasonably incurred by Network Rail—
- (a) in constructing any part of a specified work on behalf of the undertaker as provided by paragraph 5(3) of this Part of this Schedule or in constructing any protective works under the provisions of paragraph 5(4) of this Part of this Schedule including, in respect of any permanent protective works, a capitalised sum representing the cost of maintaining and renewing those works;
- (b) in respect of the approval by the engineer of plans submitted by the undertaker and the supervision by the engineer of the construction of a specified work;
- (c) in respect of the employment or procurement of the services of any inspectors, signallers, watch-persons and other persons whom it is reasonably necessary to appoint for inspecting, signalling, watching and lighting railway property and for preventing, so far as may be reasonably practicable, interference, obstruction, danger or accident arising from the construction or failure of a specified work;
- (d) in respect of any special traffic working resulting from any speed restrictions which may, in the opinion of the engineer, require to be imposed by reason or in consequence of the construction or failure of a specified work or from the substitution or diversion of services which may be reasonably necessary for the same reason; and
- (e) in respect of any additional temporary lighting of railway property in the vicinity of the specified works, being lighting made reasonably necessary by reason or in consequence of the construction or failure of a specified work.
11
- (1) In this paragraph—
- “EMI” means, subject to sub-paragraph (2), electromagnetic interference with Network Rail apparatus generated by the operation of the authorised works where such interference is of a level which adversely affects the safe operation of Network Rail’s apparatus; and
- “Network Rail’s apparatus” means any lines, circuits, wires, apparatus or equipment (whether or not modified or installed as part of the authorised works) which are owned or used by Network Rail for the purpose of transmitting or receiving electrical energy or of radio, telegraphic, telephonic, electric, electronic or other like means of signalling or other communications.
- (2) This paragraph applies to EMI only to the extent that such EMI is not attributable to any change to Network Rail’s apparatus carried out after approval of plans under paragraph 5(1) of this Part of this Schedule for the relevant part of the authorised works giving rise to EMI (unless the undertaker has been given notice in writing before the approval of those plans of the intention to make such change).
- (3) Subject to sub-paragraph (5), the undertaker must in the design and construction of the authorised works take all measures necessary to prevent EMI and must establish with Network Rail (both parties acting reasonably) appropriate arrangements to verify their effectiveness.
- (4) In order to facilitate the undertaker’s compliance with sub-paragraph (3)—
- (a) the undertaker must consult with Network Rail as early as reasonably practicable to identify all Network Rail’s apparatus which may be at risk of EMI, and thereafter must continue to consult with Network Rail (both before and after formal submission of plans under paragraph 5(1)) of this Part of this Schedule in order to identify all potential causes of EMI and the measures required to eliminate them;
- (b) Network Rail must make available to the undertaker all information in the possession of Network Rail reasonably requested by the undertaker in respect of Network Rail’s apparatus identified pursuant to sub-paragraph (a); and
- (c) Network Rail must allow the undertaker reasonable facilities for the inspection of Network Rail’s apparatus identified pursuant to sub-paragraph (a).
- (5) In any case where it is established that EMI can only reasonably be prevented by modifications to Network Rail’s apparatus, Network Rail must not withhold its consent unreasonably to modifications of Network Rail’s apparatus, but the means of prevention and the method of their execution must be selected in the reasonable discretion of Network Rail, and in relation to such modifications paragraph 5(1) of this Part of this Schedule have effect subject to this sub-paragraph.
- (6) If at any time prior to the commencement of regular revenue-earning operations on the authorised railway comprised in the authorised works and notwithstanding any measures adopted pursuant to sub-paragraph (3), the testing or commissioning of the authorised works causes EMI then the undertaker must immediately upon receipt of notification by Network Rail of such EMI either in writing or communicated orally (such oral communication to be confirmed in writing as soon as reasonably practicable after it has been issued) forthwith cease to use (or procure the cessation of use of) the undertaker’s apparatus causing such EMI until all measures necessary have been taken to remedy such EMI by way of modification to the source of such EMI or (in the circumstances, and subject to the consent, specified in sub-paragraph (5)) to Network Rail’s apparatus.
- (7) In the event of EMI having occurred—
- (a) the undertaker must afford reasonable facilities to Network Rail for access to the undertaker’s apparatus in the investigation of such EMI;
- (b) Network Rail must afford reasonable facilities to the undertaker for access to Network Rail’s apparatus in the investigation of such EMI; and
- (c) Network Rail must make available to the undertaker any additional material information in its possession reasonably requested by the undertaker in respect of Network Rail’s apparatus or such EMI.
- (8) Where Network Rail approves modifications to Network Rail’s apparatus pursuant to sub-paragraphs (5) or (6)—
- (a) Network Rail must allow the undertaker reasonable facilities for the inspection of the relevant part of Network Rail’s apparatus; and
- (b) such modifications must be carried out and completed by the undertaker in accordance with paragraph 6 of this Part of this Schedule.
- (9) To the extent that it would not otherwise do so, the indemnity in paragraph 15(1) of this Part of this Schedule applies to the costs and expenses reasonably incurred or losses suffered by Network Rail through the implementation of the provisions of this paragraph (including costs incurred in connection with the consideration of proposals, approval of plans, supervision and inspection of works and facilitating access to Network Rail’s apparatus) or in consequence of any EMI to which sub-paragraph (6) applies.
- (10) For the purpose of paragraph 10(a) of this Part of this Schedule any modifications to Network Rail’s apparatus under this paragraph are deemed to be protective works referred to in that paragraph.
12
If at any time after the completion of a specified work, not being a work vested in Network Rail, Network Rail gives notice to the undertaker informing it that the state of maintenance of any part of the specified work appears to be such as adversely affects the operation of railway property, the undertaker must, on receipt of such notice, take such steps as may be reasonably necessary to put that specified work in such state of maintenance as not adversely to affect railway property.
13
The undertaker must not provide any illumination or illuminated sign or signal on or in connection with a specified work in the vicinity of any railway belonging to Network Rail unless it has first consulted Network Rail and it must comply with Network Rail’s reasonable requirements for preventing confusion between such illumination or illuminated sign or signal and any railway signal or other light used for controlling, directing or securing the safety of traffic on the railway.
14
Any additional expenses which Network Rail may reasonably incur in altering, reconstructing or maintaining railway property under any powers existing at the making of this Order by reason of the existence of a specified work must, provided that 56 days’ previous notice of the commencement of such alteration, reconstruction or maintenance has been given to the undertaker, be repaid by the undertaker to Network Rail.
15
- (1) The undertaker must pay to Network Rail all reasonable costs, charges, damages and expenses not otherwise provided for in this Part of this Schedule which may be occasioned to or reasonably incurred by Network Rail—
- (a) by reason of the construction or maintenance of a specified work or the failure thereof or
- (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon a specified work;
and the undertaker must indemnify and keep indemnified Network Rail from and against all claims and demands arising out of or in connection with a specified work or any such failure, act or omission; and the fact that any act or thing may have been done by Network Rail on behalf of the undertaker or in accordance with plans approved by the engineer or in accordance with any requirement of the engineer or under the engineer’s supervision does not (if it was done without negligence on the part of Network Rail or of any person in its employ or of its contractors or agents) excuse the undertaker from any liability under the provisions of this sub-paragraph.
- (2) Network Rail must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertaker.
- (3) The sums payable by the undertaker under sub-paragraph (1) is to include a sum equivalent to the relevant costs.
- (4) Subject to the terms of any agreement between Network Rail and a train operator regarding the timing or method of payment of the relevant costs in respect of that train operator, Network Rail must promptly pay to each train operator the amount of any sums which Network Rail receives under sub-paragraph (3) which relates to the relevant costs of that train operator.
- (5) The obligation under sub-paragraph (3) to pay Network Rail the relevant costs is, in the event of default, enforceable directly by any train operator concerned to the extent that such sums would be payable to that operator pursuant to sub-paragraph (4).
- (6) In this paragraph—
- “the relevant costs” means the costs, direct losses and expenses (including loss of revenue) reasonably incurred by each train operator as a consequence of any restriction of the use of Network Rail’s railway network as a result of the construction, maintenance or failure of a specified work or any such act or omission as mentioned in sub-paragraph (1); and
- “train operator” means any person who is authorised to act as the operator of a train by a licence under section 8 (licences) of the Railways Act 1993.
16
Network Rail must, on receipt of a request from the undertaker, from time to time provide the undertaker free of charge with written estimates of the costs, charges, expenses and other liabilities for which the undertaker is or will become liable under this Part of this Schedule (including the amount of the relevant costs mentioned in paragraph 15 of this Part of this Schedule) and with such information as may reasonably enable the undertaker to assess the reasonableness of any such estimate or claim made or to be made pursuant to this Part of this Schedule (including any claim relating to those relevant costs).
17
In the assessment of any sums payable to Network Rail under this Part of this Schedule there must not be taken into account any increase in the sums claimed that is attributable to any action taken by or any agreement entered into by Network Rail if that action or agreement was not reasonably necessary and was taken or entered into with a view to obtaining the payment of those sums by the undertaker under this Part of this Schedule or increasing the sums so payable.
18
The undertaker and Network Rail may, subject in the case of Network Rail to compliance with the terms of its network licence, enter into, and carry into effect, agreements for the transfer to the undertaker of—
- (a) any railway property shown on the works and land plans and described in the book of reference;
- (b) any lands, works or other property held in connection with any such railway property; and
- (c) any rights and obligations (whether or not statutory) of Network Rail relating to any railway property or any lands, works or other property referred to in this paragraph.
19
Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part 1 of the Railways Act 1993.
20
The undertaker must give written notice to Network Rail if any application is proposed to be made by the undertaker for the Secretary of State’s consent, under article 7 (benefit of order) of this Order and any such notice must be given no later than 28 days before any such application is made and must describe or give (as appropriate)—
- (a) the nature of the application to be made;
- (b) the extent of the geographical area to which the application relates; and
- (c) the name and address of the person acting for the Secretary of State to whom the application is to be made.
21
The undertaker must no later than 28 days from the date that the plans submitted to and certified by the Secretary of State in accordance with article 46 (certification of plans and documents) are certified by the Secretary of State, provide a set of those plans to Network Rail in a format specified by Network Rail.
Dispute Resolution and Arbitration
22
- (1) Article 48 (arbitration) does not apply to this Part of this Schedule.
- (2) All parties involved in settling any difference are to use reasonable endeavours to do so within 42 working days from the date of a dispute first being notified in writing by one party to the other.
- (3) In the absence of the difference being settled within the period referred to in sub-paragraph (2) the difference is to be referred to and settled by a single arbitrator to be agreed between the parties except that, failing agreement between the parties of the arbitrator to be appointed, an arbitrator is to be appointed following the expiry of 14 working days from the expiry of the 42 day working days referred to in sub-paragraph (2) on the application of either party—
- (a) in the case of matters relating to paragraph 11 of this Part of this Schedule, by the president of the Institution of Engineering and Technology; and
- (b) in the case of matters of all other matters relating to this Part of this Schedule, by the president of the Institute of Civil Engineers.
- (4) All parties involved in settling any difference by arbitration will use reasonable endeavours to deal with such matters expeditiously and in accordance with the timetable set out in sub-paragraph (5) unless that timetable is varied in accordance with sub-paragraph (6)(b) to allow for the consents referred to in sub-paragraph (6)(a) to be obtained.
- (5) The timetable referred to in sub-paragraph (4) is—
- (a) the parties must make submissions to the arbitrator in writing, and copied to the other party, within 42 working days of the arbitrator’s appointment;
- (b) any comment on the submissions made by either party must be submitted to the arbitrator within 42 working days of the receipt of the submission under paragraph (a);
- (c) a maximum of 42 working days extension to either or both of the periods referred to in paragraphs (a) and (b) is to be allowed should a party request such an extension prior to the relevant period expiring, unless the arbitrator is of the view that such an extension would be manifestly unreasonable or unnecessary; and
- (d) a decision must be issued within 42 working days of the receipt of the submissions under paragraph (b) or any extension to such period allowed under paragraph (c) subject to sub-paragraph (6).
- (6) The parties recognise that—
- (a) Network Rail’s compliance with the arbitration timetable referred to at sub-paragraph (5) will be subject to the obtaining by Network Rail of necessary clearance consents and other engineering, regulatory and stakeholder (internal and external) consents required under statute, by regulations or by Network Rail governance procedures; and
- (b) the timetable set out in sub-paragraph (5) can be varied by the arbitrator to accommodate the consents and procedures referred to in paragraph (a).
- (7) Network Rail must use reasonable endeavours to pursue any consents referred to in sub-paragraph (6) expeditiously.
- (8) The fees of the arbitrator are payable by the parties in such proportions as the arbitrator may determine, or in the absence of such determination, equally.
PART 2 — FOR THE PROTECTION OF HIGHWAYS ENGLAND
Application
1
The provisions of this Part of this Schedule have effect, and apply to the HE works, unless otherwise agreed in writing between the undertaker and Highways England.
Interpretation
2
- (1) The terms used in this Part of this Schedule are as defined in article 2 (interpretation) of this Order save where inconsistent with sub-paragraph (2) which will prevail.
- (2) In this Part of this Schedule—
- “as built information” means one digital copy of the following information where applicable to the phase in question— as constructed drawings in both PDF and AutoCAD DWG formats for anything designed by the undertaker, in compliance with Interim Advice Note 184 or any successor document; list of suppliers and materials used; product data sheets, technical specifications for all materials used; as constructed information for any utilities discovered or moved during the works; method statements for works carried out; in relation to road lighting, signs and traffic signals, any information required by Series 1300 and 1400 of the Specification for Highway Works; organisation and methods manuals for all products used in the construction of the authorised development; as constructed programme; test results and records as required by the detailed design information and during the construction phase of the project; RSA 3 and exceptions agreed; health and safety file; and other such information as is necessary to enable Highways England to update all relevant databases and to ensure compliance with the Highways England Asset Data Management Manual as in operation at the relevant time including CCTV surveys;
- “the bond sum” means the sum equal to 120% of the cost of the carrying out of the phase of the HE works concerned (to include all costs including the commuted sum) or such other sum agreed between the undertaker and Highways England;
- “the cash surety” means the sum of £150,000 or such other sum agreed between the undertaker and Highways England;
- “county highway works” means those parts of the authorised development to be carried out in the areas identified as Works Nos. 7, 9, 12, 13, 14, 15, 16 and 17 on the works plans, the general arrangement of which is shown on the highway plans and any ancillary works thereto;
- “commuted sum” means such sum as calculated for each phase as provided for in paragraph 9 of this Part of this Schedule and to be used to fund the future cost of maintaining the HE works;
- “contractor” means any contractor or sub-contractor appointed by the undertaker to carry out the HE works or any phase of the HE works and approved by Highways England in accordance with paragraph 3(3) of this Part of this Schedule;
- “detailed design information” means drawings, specifications and calculations as appropriate for the following, and in accordance with the general arrangements of the HE works shown on the highway plans, unless otherwise agreed between Highways England and the undertaker— site clearance details; boundary, environmental and mitigation fencing; road restraints systems and supporting Road Restraint Risk Appraisal Process assessment; drainage and ducting as required by Series 500 of the Specification for Highways Works, HD 43/04, IAN 147/12 and SD 15 Parts 1 – 6 inclusive; earthworks including supporting geotechnical assessments required by HD22/08 and any required Strengthened Earthworks Appraisal Form certification (SEAF); pavement, pavement foundations, kerbs, footways and paved areas; traffic signs and road markings; traffic signal equipment and associated signal phasing and timing detail; road lighting (including columns and brackets); electrical work for road lighting, traffic signs and signals; motorway communications as required by the Designs Manual for Roads and Bridges; highway structures and any required structural approval in principle (AIP); landscaping; agreed departures from the Designs Manual for Roads and Bridges standards; a report of walking, cycling and horse riding carried out in accordance with the Design Manual for Roads and Bridges Standard HD42/17 or any successor document; Stage 2 Road Safety Audit and exceptions agreed and, in the event that any works are not commenced within five years of the date of the Stage 1 Road Safety Audit, a further Stage 1 Road Safety Audit and exceptions agreed; utilities diversions; topographical survey; maintenance and repair strategy in accordance with Designing for Maintenance Interim Advice Note 69/15 or any successor document; and health and safety information including any asbestos survey required by GD05/16 or any successor document, where relevant to the phase concerned;
- “dilapidation survey” means a survey of the condition of the roads, bridges and retaining walls which will be the subject of the physical works comprised in the phase concerned;
- “estimated costs” means the estimated costs in respect of each phase agreed pursuant to paragraph 5(1)(b) to (d) and (5) of this Part of this Schedule;
- “the excess” means the amount by which Highways England estimates that the costs referred to in paragraph 5(1)(b) to (d) of this Part of this Schedule will exceed the estimated costs pursuant to paragraph 5(5)(b);
- “HE works” means those parts of the authorised development to be carried out in the areas identified as Works Nos. 8 and 11 on the works plans, the general arrangement of which is shown on the highway plans, and any ancillary works;
- “nominated persons” means the undertaker’s representatives or the contractors’ representatives on site during the carrying out of the HE works as notified to Highways England from time to time;
- “phase” means that part of the HE works which is to be carried out in separate phases in the areas identified as Works Nos. 8 and 11 on the works plans or such other phasing arrangements as agreed with Highways England;
- “programme of works” means a document setting out the sequence and timetabling of the phase of the HE works in question;
- “Road Safety Audit” means an audit carried out in accordance with the Road Safety Audit Standard and the approved audit team will include a member of Highways England East Midlands Asset Delivery Road Safety Team;
- “Road Safety Audit Standard” means the Design Manual for Roads and Bridges Standard HD 19/15 or any successor document;
- “utilities” means any pipes, wires, cables or equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act; and
- “winter maintenance” means maintenance of the road surface to deal with snow and ice.
Prior approvals and security
3
- (1) No work must commence on any phase of the HE works until the detailed design information and a programme of works in respect of that phase have been submitted to and approved by Highways England.
- (2) Highways England must nominate a person who will be a single point of contact on behalf of Highways England for consideration of the detailed design information and who will co-ordinate the Highways England response to the details submitted.
- (3) No works must commence on any phase of the HE works other than by a contractor employed by the undertaker for that phase but first approved by Highways England.
- (4) No work must commence on any phase of the HE works until Highways England has agreed the bond sum for that phase and the undertaker has provided security for the carrying out of those works as provided for in paragraph 9 of this Part of this Schedule or some other form of security acceptable to Highways England.
- (5) No work must commence on any phase of the HE works until Stage 1 and Stage 2 Road Safety Audits have been carried out in respect of that phase and all recommendations raised incorporated into an amended design approved by Highways England or any relevant exceptions approved by Highways England.
- (6) No work must commence on any phase of the HE works until the undertaker demonstrates to the satisfaction of Highways England that the walking, cycling and horse riding assessment and review process for that phase has been adhered to in accordance with the Design Manual for Roads and Bridges Standard HD 42/17 or any successor document.
- (7) No work must commence on any phase of the HE works until a scheme of traffic management has been submitted by the undertaker and approved by Highways England for that phase, such scheme to be capable of amendment by agreement between the undertaker and Highways England from time to time.
- (8) No work must commence on any phase of the HE works until stakeholder liaison has taken place for that phase in accordance with a scheme for such liaison agreed between the undertaker and Highways England.
- (9) No work must commence on any phase of the HE works until Highways England has approved the audit brief and CVs for all road safety audits and exceptions to items raised, if appropriate, for that phase in accordance with the Road Safety Audit Standard.
- (10) No work must commence on any phase of the HE works until the undertaker has agreed the commuted sum for that phase with Highways England to be calculated in accordance with paragraph 9 of this Part of this Schedule.
- (11) No work must commence on any phase of the HE works until a dilapidation survey for that phase has been carried out by the undertaker and has been submitted to and approved in writing by Highways England.
- (12) No work must commence on any phase of the HE works until the scope of all routine maintenance to be carried out by the undertaker during the construction of the phase concerned has been agreed in writing by Highways England, such maintenance only to include winter maintenance of the phase concerned where—
- (a) access to carry out such maintenance by Highways England is not available by virtue of the works being carried out on that phase; and
- (b) any winter maintenance is needed immediately prior to the opening of any carriageway to traffic where that carriageway had been closed for the purposes of the carrying out of the phase concerned.
Carrying out of works
4
- (1) The undertaker must prior to commencement of each phase of the HE works give Highways England 28 days’ notice in writing of the date on which that phase will start unless otherwise agreed by Highways England.
- (2) The undertaker must comply with Highways England’s usual road space booking procedures prior to and during the carrying out of each phase of the HE works and no HE works for which a road space booking is required is to commence without a road space booking having first been secured. It will be necessary for an assessment of the highway network and impact of any road closures on diversion routes to be carried out including any impact related to the county highway works. It is acknowledged by Highways England that in the event that the aforementioned assessment indicates no safety or operational concerns then the HE works can proceed at the same time as Highways England’s M1 J13-16 Smart Motorway scheme with road space booking being shared where practicable. In the event that the aforementioned assessment indicates that both schemes cannot be accommodated at the same time then Highways England, in its absolute discretion will decide when a road space booking can be issued to the undertaker.
- (3) Each phase of the HE works must be carried out to the satisfaction of Highways England in accordance with—
- (a) the relevant detailed design information and a programme of works approved pursuant to paragraph 3(1) of this Part of this Schedule or as subsequently varied by agreement between the undertaker and Highways England;
- (b) the Design Manual for Roads and Bridges, the Specification for Highway Works (contained within the Manual of Contract Documents for Highways Works), all relevant interim advice notes, the Traffic Signs Manual and the Traffic Signs Regulations and General Directions 2016[^f00092], and any amendment to or replacement thereof for the time being in force, save to the extent that they are inconsistent with the general arrangement of the HE works as shown on the highway plans or a departure from such standards has been approved by Highways England;
- (c) such approvals or requirements of Highways England that are required by the provisions of paragraph 3 of this Part of this Schedule to be in place prior to the relevant phase of the HE works being undertaken; and
- (d) all aspects of the Construction (Design and Management) Regulations 2015[^f00093] or any statutory amendment or variation of the same and in particular the undertaker, as client, must ensure that all client duties (as defined in the said regulations) are undertaken to the satisfaction of Highways England.
- (4) The undertaker must permit and require the contractor to permit at all reasonable times persons authorised by Highways England (whose identity must be previously notified to the undertaker by Highways England) to gain access to the HE works and the county highway works for the purposes of inspection and supervision and the undertaker must provide to Highways England contact details of the nominated persons with whom Highways England should liaise during the carrying out of the HE works.
- (5) At any time during the carrying out of the HE works the nominated persons must act upon any reasonable request made by Highways England in relation to the carrying out of the HE works as soon as practicable following such request being made to the nominated persons save to the extent that the contents of such request are inconsistent with or fall outside the contractor’s obligations under its contract with the undertaker or the undertaker’s obligations in this Order.
- (6) If at any time the undertaker does not comply with any of the terms of this Part of this Schedule in respect of any phase of the HE works having been given notice of an alleged breach and an adequate opportunity to remedy it by Highways England, Highways England, on giving the undertaker 14 days’ notice in writing to that effect, is entitled to either—
- (a) carry out and complete that phase of the HE works and any maintenance works which the undertaker would have been responsible for on the undertaker’s behalf; or
- (b) carry out such necessary works of reinstatement of the highway and other land and premises of Highways England,
and in either case the undertaker must within 28 days of receipt of the itemised costs pay to Highways England the costs so incurred by Highways England.
- (7) If at any time the undertaker, in carrying out the authorised development, causes any damage or disruption to the strategic road network not hereby authorised, then Highways England is to give notice of such damage or disruption and allow the undertaker 14 days to remedy the problem. Should the undertaker fail to adequately remedy the problem to the satisfaction of Highways England, Highways England, on giving to the undertaker 7 days’ notice in writing to that effect, is entitled to carry out such necessary works as Highways England acting reasonably deem appropriate to remedy the damage or disruption, and the undertaker must within 28 days of receipt of the itemised costs pay to Highways England the costs so incurred by Highways England.
- (8) Nothing in this Part of this Schedule prevents Highways England from carrying out any work or taking such action as deemed appropriate, without prior notice to the undertaker, in the event of an emergency or danger to the public. The cost to Highways England of such work or action being chargeable to and recoverable from the undertaker if the need for such action arises from the carrying out of the authorised development. This provision applies to all areas of the authorised development including any area of traffic management deployed under the traffic management plan approved pursuant to paragraph 3(7) of this Part of this Schedule to facilitate delivery of the authorised development.
- (9) The undertaker, in carrying out each phase of the HE works, must at its own expense divert or protect all utilities as may be necessary to enable the HE works to be properly carried out, and all agreed alterations to existing services must be carried out to the reasonable satisfaction of Highways England.
- (10) During the construction of each phase of the HE works the undertaker is responsible for all routine maintenance at its cost within that phase (including winter maintenance where required to be undertaken by the undertaker in accordance with paragraph 3(12)) of this Part of this Schedule. All routine maintenance must be carried out in accordance with the scope of routine maintenance operations agreed by Highways England in accordance with paragraph 3(12).
Payments
5
- (1) The undertaker must fund the whole of the cost of the HE works and all costs incidental to the HE works and must also pay to Highways England in respect of each phase of the HE works a sum equal to the whole of any costs and expenses which Highways England incur, including costs and expenses for using external staff and resources as well as costs and expenses of using in-house staff and resources in relation to the HE works and arising out of them and their implementation, including—
- (a) the checking and approval of all design work carried out by or on behalf of the undertaker for that phase;
- (b) costs in relation to agreeing the programme of works for that phase;
- (c) the carrying out of supervision of that phase; and
- (d) all administrative costs in relation to paragraphs (a) and (b),
together comprising “the estimated costs”.
- (2) The sums referred to in sub-paragraph (1) do not include any sums payable from the undertaker to the contractor but do include any value added tax which is payable by Highways England in respect of such costs and expenses and for which it cannot obtain reinstatement from HM Revenue and Customs.
- (3) The undertaker must pay to Highways England upon demand and prior to such costs being incurred the total costs that Highways England believe will be properly and necessarily incurred by Highways England in undertaking any statutory procedure or preparing and bringing into force any traffic regulation order or orders necessary to carry out or for effectively implementing the HE works provided that this sub-paragraph does not apply to the making of any orders which duplicate orders contained in this Order.
- (4) The undertaker must make the payments of the estimated costs as follows—
- (a) the undertaker must pay a sum equal to the anticipated cost of the tasks referred to in sub-paragraph (1)(a), (b) and (d) to Highways England prior to Highways England undertaking those tasks;
- (b) the undertaker must pay a sum equal to the anticipated cost of the tasks referred to in sub-paragraph (1)(c) prior to commencing that phase;
- (c) if at any time after the payment in respect of a phase referred to in sub-paragraph (4)(a) and (b) has become payable, Highways England reasonably estimates that the costs in respect of that phase referred to in sub-paragraph (1)will exceed the estimated costs for that phase, it may give notice to the undertaker of the amount by which it then reasonably estimates those costs will exceed the estimated costs (“the excess”) and the undertaker must pay to Highways England within 28 days of the date of that notice a sum equal to the excess.
- (5) Within 91 days of the issue of the handover certificate for each phase of the HE works in accordance with paragraph 7 of this Part of this Schedule, Highways England must give the undertaker a final account of the costs referred to in sub-paragraph (1) and within 28 days from the expiry of the 91 day period—
- (a) if the account shows a further sum as due to Highways England the undertaker must pay to Highways England the sum shown due to it in that final account; and
- (b) if the account shows that the payment or payments previously made have exceeded those costs Highways England must refund the difference to the undertaker.
- (6) If any payment due under any of the provisions of this Part of this Schedule is not made on or before the date on which it falls due the party from whom it was due must at the same time as making the payment pay to the other party interest at 1% above the rate payable in respect of compensation under section 32 (rate of interest after entry on land) of the 1961 Act for the period starting on the date upon which the payment fell due and ending with the date of payment of the sum on which interest is payable together with that interest.
Provisional certificate
6
As soon as—
- (a) each phase of the HE works has been completed; and
- (b) a Stage 3 Road Safety Audit for that phase has been carried out and any resulting recommendations complied with and any exceptions agreed,
Highways England must issue a provisional certificate of completion in respect of that phase, such certificate not to be unreasonably withheld or delayed.
Handover certificate and defects period
7
- (1) As soon as, in respect of a phase—
- (a) the undertaker has carried out a dilapidation survey in accordance with paragraph 3(11) of this Part of this Schedule and completed any remedial works necessary to bring that area into as good a condition as when it was originally surveyed, such works to be first agreed with Highways England;
- (b) the undertaker has provided a plan clearly identifying the extent of any land which is to become highway maintainable at public expense together with any ancillary equipment that will become the responsibility of the highway authority; and
- (c) the as built information has been provided to Highways England,
Highways England must forthwith issue a handover certificate in respect of that phase, such certificate not to be unreasonably withheld or delayed.
- (2) The undertaker must at its own expense remedy any defects in any phase of the HE works as are reasonably required to be remedied by Highways England during a period of 12 months from the date of the handover certificate in respect of that phase. All identified defects are to be remedied in accordance with the following timescales—
- (a) in respect of matters of urgency, within 24 hours of receiving notification (urgency to be determined at the absolute discretion of Highways England);
- (b) in respect of matters which Highways England consider to be serious defects or faults, within 14 days of receiving notification or if a road space booking is required at the time when the road space is available, whichever is the later; and
- (c) in respect of all other defects notified to the undertaker, within 4 weeks of receiving notification or if a road space booking is required at the time when the road space is available, whichever is the later.
- (3) Following the issue of the handover certificate in respect of a phase, Highways England is to be responsible for the HE works within that phase which will thereafter be maintained by and at the expense of Highways England, save for any soft landscaping works which are to be established and thereafter maintained for a period of 3 years by and at the expense of the undertaker.
- (4) The undertaker must submit Stage 4 Road Safety Audits for each phase as required by and in line with the timescales stipulated in the Road Safety Audit Standard. The undertaker must comply with the findings of the Stage 4 Road Safety Audits and be responsible for all costs of and incidental to such audits.
Final certificate
8
Highways England must issue the final certificate in respect of each phase at the expiration of the 12 month period in respect of that phase referred to in paragraph 7(2) of this Part of this Schedule or if later on the date on which any defects or damage arising from defects during that period have been made good to the reasonable satisfaction of Highways England, such certificate not to be unreasonably withheld or delayed.
Security
9
- (1) Subject to paragraph 3(4) of this Part of this Schedule the undertaker must provide security for the carrying out of the HE works as follows—
- (a) prior to the commencement of each phase, the HE works within that phase must be secured by a bond from a bondsman first approved by Highways England drafted substantially as detailed in Form 1 contained in paragraph 17 of this Part of this Schedule, or such other form that may be agreed between the undertaker and Highways England, to indemnify Highways England against all losses, damages, costs or expenses arising from any breach of any one or more of the obligations of the undertaker in respect of that phase under the provisions of this Part of this Schedule, provided that the maximum liability of the bond does not exceed the bond sum relating to that phase; and
- (b) prior to the commencement of the HE works, the undertaker must provide the cash surety which may be utilised by Highways England in the event of the undertaker failing to meet its obligations to make payments under paragraph 5 of this Part of this Schedule or to carry out works the need for which arises from a breach of one or more of the obligations of the undertaker (which will be a single cash surety for the entirety of the HE works).
- (2) Each bond sum and the cash surety (the latter in respect of the final phase only) is to be progressively reduced as follows—
- (a) on receipt of written confirmation (including receipt of receipted invoices evidencing payments made by the undertaker to the contractors) from the undertaker of the payments made from time to time to the contractor, Highways England must, in writing, authorise the reduction of the bond sum by such proportion of the bond sum as amounts to 80% of those payments provided that an evaluation of the HE works completed and remaining has been carried out by the undertaker and audited and agreed by Highways England to ensure that the stage of completion of the works is relative to the payments made by the undertaker to the contractors. Highways England will only be required to provide the said authorisation if it is satisfied that the monies remaining secured by the bond sum will be sufficient to cover all remaining costs and liabilities anticipated to be incurred in completing the HE works plus an additional 20%;
- (b) within 20 working days of completion of each phase of the HE works (as evidenced by the issuing of the provisional certificate in respect of that phase in accordance with paragraph 6(1) of this Part of this Schedule) Highways England must, in writing, release the bond provider from its obligations in respect of 80% of the bond sum relating to that phase (“the revised bond sum”) save insofar as any claim or claims have been made against the bond and/or liability on its part has arisen prior to that date, in which case Highways England will retain a sufficient sum to meet all necessary costs; and
- (c) within 20 working days of the issue of the final certificate for each phase of the HE works referred to in paragraph 8 of this Part of this Schedule, Highways England must, in writing, release the bond provider from its obligations in respect of the revised bond sum relating to that phase and (in respect of the final phase) release the remainder of the cash surety to the undertaker save insofar as any claim or claims have been made against the bond or liability on its part has arisen prior to that date, in which case Highways England will retain a sufficient sum to meet all necessary costs.
Commuted sums
10
The undertaker must pay to Highways England the commuted sum calculated in accordance with FS Guidance S278 Commuted Lump Sum Calculation Method dated 18th January 2010 within 28 days of the date that each phase of the HE works becomes maintainable by Highways England in accordance with paragraph 7(3) of this Part of this Schedule.
Insurance
11
The undertaker must prior to commencement of the HE works effect public liability insurance with an insurer in the minimum sum of £10,000,000.00 (ten million pounds) against any legal liability for damage, loss or injury to any property or any person as a direct result of the execution of the HE works or any part thereof by the undertaker.
Indemnification
12
- (1) The undertaker must in relation to the carrying out of the HE works take such precautions for the protection of the public and private interest as would be incumbent upon it if it were the highway authority and must indemnify Highways England from and against all costs, expenses, damages, losses and liabilities arising from or in connection with or ancillary to any claim, demand, action or proceedings resulting from the design and carrying out of the HE works, provided that—
- (a) the foregoing indemnity does not extend to any costs, expenses, liabilities and damages caused by or arising out of the neglect or default of Highways England or its officers, servants, agents or contractors or any person or body for whom it is responsible;
- (b) Highways England must notify the undertaker immediately upon receipt of any claim; and
- (c) Highways England must, following the acceptance of any claim, notify the quantum to the undertaker in writing, and the undertaker must within 14 days of the receipt of such notification pay to Highways England the amount specified as the quantum of such claim.
- (2) The undertaker must notify Highways England of the intended date of opening of each phase to public traffic not less than 14 days in advance of the intended date and the undertaker must notify Highways England of the actual date that each phase is open to public traffic on each occasion within 14 days of that occurrence.
Warranties
13
The undertaker must procure warranties from the contractor and designer of each phase to the effect that all reasonable skill, care and due diligence will be exercised in designing and constructing that phase including the selection of materials, goods, equipment and plant, such warranties to be provided to Highways England before that phase commences.
Land transfer
14
- (1) Following the issuing of the final certificates for all the HE works, Highways England may serve notice on the undertaker that it wishes to take a freehold transfer of land within the then extent of highway land which is not in the ownership of HE but has been acquired by the undertaker for the purposes of carrying out the HE works.
- (2) If the undertaker receives a notice under sub-paragraph (1), the undertaker must co-operate in a freehold transfer of the land which is the subject of the notice and complete such transfer as soon as reasonably practicable at no cost to Highways England, which includes the undertaker being responsible for the reasonable legal costs incurred by Highways England in connection with such transfer.
Approvals
15
- (1) Any approvals, consents or agreements required or sought from or with Highways England pursuant to the provisions of this Part of this Schedule must not be unreasonably withheld or delayed and must be given in writing.
- (2) If Highways England fail to notify the undertaker of its decision in respect of any approval, consent or agreement pursuant to the provisions of this Part of this Schedule within 28 days of the specified day, the undertaker may serve upon Highways England written notice requiring Highways England to give their decision within a further 28 days beginning on the date upon which Highways England received written notice from the undertaker. Subject to subparagraph (3), if by the expiry of the further 28 days Highways England has failed to notify the undertaker of its decision, Highways England are to be deemed to have given the relevant approval, consent or agreement.
- (3) Any further notice given by the undertaker to Highways England under subparagraph (2) must include a written statement that the provisions of subparagraph (2) apply to the relevant approval, consent or agreement.
- (4) In this paragraph “specified day” means—
- (a) the day on which particulars of the matter are received by Highways England under the provisions of this Part of this Schedule; or
- (b) the day on which the undertaker provides Highways England with any further particulars of the matter that have been reasonably requested by Highways England within 28 days of the date in sub-paragraph (2)(a),
whichever is the later.
Expert determination
16
- (1) Article 48 (arbitration) does not apply to this Part of this Schedule except in respect of sub-paragraph (5).
- (2) Any difference under this Part of this Schedule must be referred to and settled by a single independent and suitable person, who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute, acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.
- (3) All parties involved in settling any difference must use best endeavours to do so within 21 days from the date of a dispute first being notified in writing by one party to the other, and in the absence of the difference being settled within that period the expert must be appointed within 21 days of the notification of the dispute.
- (4) The expert must—
- (a) invite the parties to make submission to the expert in writing and copied to the other party to be received by the expert within 21 days of the expert’s appointment;
- (b) permit a party to comment on the submissions made by the other party within 21 days of receipt of the submission;
- (c) issue a decision within 42 days of receipt of the submissions under sub-paragraph (b); and
- (d) give reasons for the decision.
- (5) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 48.
- (6) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.
17
Form 1 as referred to in paragraph 9—
PART 3 — FOR THE PROTECTION OF THE LOCAL HIGHWAY AUTHORITY
Application
1
The provisions of this Part of this Schedule have effect, and apply to the county highway works, unless otherwise agreed in writing between the undertaker and the local highway authority.
Interpretation
2
- (1) The terms used in this Part of this Schedule are as defined in article 2 (interpretation) of this Order save where inconsistent with sub-paragraph (2) which will prevail.
- (2) In this Part of this Schedule—
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.