The Immingham Open Cycle Gas Turbine Order 2020
- (e) security fencing, gates, boundary treatment and other means of enclosure;
- (f) lighting, including lighting columns;
- (g) gatehouses and weighbridges;
- (h) closed circuit television cameras, columns and other security works;
- (i) site establishment and preparation works, including site clearance, demolition, earthworks, excavations, vehicular access points, the alteration and protection of services and utilities, and works for the protection of buildings and land;
- (j) temporary construction laydown areas, contractor facilities, materials and plant storage, generators, concrete batching facilities, vehicle and cycle parking, roadways and haul routes, offices and welfare facilities, wheel wash facilities, and signage;
- (k) vehicle parking and cycle storage;
- (l) accesses, roads, pedestrian and cycle routes; and
- (m) tunnelling, boring and drilling works,
and to the extent that it does not form part of such works, further associated development comprising such other works as may be necessary or expedient for the purposes of or in connection with the relevant part of the authorised development and which fall within the scope of the works assessed in the environmental statement.
SCHEDULE 2 — REQUIREMENTS
Interpretation
1
In this Schedule—
- “Environment Agency” means the non-departmental public body of that name created by section 1 (the Environment Agency) of the Environment Act 1995 ;
- “Highways England” means Highways England Company Limited or such other person who is appointed as the strategic highways company in respect of the A160 Humber Road and the A160/A180 interchange pursuant to section 1 (appointment of strategic highways companies) of the Infrastructure Act 2015 ;
- “Historic England” means the Historic Buildings and Monuments Commission for England established by section 32 (establishment of commission) of the National Heritage Act 1983 ;
- “lead local flood authority” means the body designated as such, for the area in which the authorised development is located, pursuant to section 6(7) (other definitions) of the Flood and Water Management Act 2010 ;
- “Lincolnshire Wildlife Trust” means Lincolnshire Wildlife Trust (registered charity number 218895) of Banovallum House, Lincolnshire, LN9 5HF;
- “North East Lindsey Internal Drainage Board” means the internal drainage board for the area in which the authorised development is located pursuant to section 1 (internal drainage districts and boards) of the Land Drainage Act 1991 ;
- “North Lincolnshire Police” means the police force for the area in which the authorised development is located pursuant to section 1 (police areas) of the Police Act 1996 ;
- “part of the authorised development” means any part of Works Nos. 1 to 6; and
- “permitted preliminary works” means operations consisting of environmental surveys and monitoring, investigations for the purpose of assessing ground conditions, archaeological investigations, receipt and erection of construction plant and equipment, erection of any temporary means of enclosure, the temporary display of site notices or advertisements.
Commencement of the authorised development
2
- (1) The authorised development must not be commenced after the expiration of five years from the date this Order comes into force.
- (2) The authorised development must not commence unless the undertaker has given the relevant planning authority fourteen days' notice of its intention to commence the authorised development.
Notice of commencement
3
Notice of the intended start of commissioning of the authorised development must be given to the relevant planning authority where practicable prior to such start and in any event within seven days from the date that commissioning is started.
Notice of date of final commissioning
4
Notice of the intended date of final commissioning of the authorised development must be given to the relevant planning authority where practicable prior to such date of final commissioning and in any event within seven days from the date of final commissioning.
Detailed design
5
- (1) In relation to any part of the authorised development comprised in Work No. 1 no development of that part may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and, in respect of sub-paragraph (d) after consultation with the highway authority, approved by the relevant planning authority—
- (a) the siting, layout, scale and external appearance, including the colour, materials and surface finishes of all new permanent buildings and structures;
- (b) finished floor levels;
- (c) hard standings;
- (d) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities, cycle parking and routes, and pedestrian facilities and routes; and
- (e) landscaping
- (2) The details submitted pursuant to sub-paragraph (1) must be in accordance with the parameters set out in Schedule 12 (design parameters) .
- (3) No part of the authorised development comprised in Work No. 2 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and, after consultation with the highway authority, approved by the relevant planning authority—
- (a) construction access;
- (b) operational access;
- (c) vehicle parking; and
- (d) haul routes.
- (4) No part of the authorised development comprised in Work No. 3 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and, in respect of sub-paragraphs (a), (d) and (e) after consultation with the highway authority, approved by the relevant planning authority—
- (a) hard standings, laydown and open storage areas;
- (b) contractor compounds and construction staff welfare facilities;
- (c) gatehouse;
- (d) vehicle parking and cycle storage facilities; and
- (e) the internal vehicular access and circulation roads, loading and unloading, vehicle parking and turning facilities, cycle parking and routes, and pedestrian facilities and routes.
- (5) No part of the authorised development comprised in Work Nos. 4 and 5, save for the permitted preliminary works, may commence until details of the following for that part have been submitted to and, after consultation with National Grid, approved by the relevant planning authority—
- (a) the route and method of installation of the gas pipeline; and
- (b) the route and method of electrical connection works comprising overground electrical cables, and control systems and cables.
- (6) No part of the authorised development comprised in Work No. 6 may commence, save for the permitted preliminary works, until details of the following for that part have been submitted to and, after consultation with the Environment Agency and Anglian Water, approved by the relevant planning authority—
- (a) the route and method of construction of any utilities and services connections including water pipes, connections, pumps, tanks, structures and ancillary equipment; telecommunications cables and equipment; electrical cables, connections and ancillary equipment; and control systems and cables; and
- (b) water connection works, comprising underground and overground pipes, plant apparatus, enclosures and structures, and supply cables, transformers and control system cables.
- (7) Work Nos. 1, 2, 3, 4, 5 and 6 must be carried out in accordance with the approved details unless otherwise agreed with the relevant planning authority.
Biodiversity enhancement and management plan
6
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a biodiversity protection plan for that part has been submitted to and, after consultation with Natural England, approved by the relevant planning authority.
- (2) The plan submitted and approved pursuant to sub-paragraph (1) must include details of—
- (a) measures to protect existing shrub and tree planting that is to be retained; and
- (b) biodiversity and habitat impact avoidance.
- (3) The plan submitted and approved pursuant to sub-paragraph (1) must be implemented as approved throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (4) Prior to the date of final commissioning a biodiversity enhancement and management plan must be submitted to and approved by the relevant planning authority.
- (5) The plan submitted and approved pursuant to sub-paragraph (4) must include details of—
- (a) measures to protect existing shrub and tree planting that is to be retained;
- (b) measures to enhance biodiversity and habitats;
- (c) an implementation timetable; and
- (d) biodiversity management and maintenance.
- (6) Any shrub or tree planted as part of the approved plan that, within a period of five years after planting, is removed, dies or becomes, in the opinion of the relevant planning authority, seriously damaged or diseased, must be replaced in the first available planting season with a specimen of the same species and size as that originally planted unless otherwise agreed with the relevant planning authority.
- (7) The plan submitted and approved pursuant to sub-paragraph (4) must be in accordance with the principles of the framework biodiversity enhancement and management plan.
- (8) The plan must be implemented as approved during the operation of the authorised development unless otherwise agreed with the relevant planning authority.
External lighting
7
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for all external lighting to be installed during construction for that part has been submitted to and approved by the relevant planning authority.
- (2) No part of the authorised development may be commissioned until a scheme for all permanent external lighting to be installed has been submitted to and approved by the relevant planning authority.
- (3) The schemes submitted and approved pursuant to sub-paragraphs (1) and (2) of this requirement must be in accordance with the indicative lighting strategy and include measures to minimise and otherwise mitigate any artificial light emissions during the construction and operation of the authorised development.
- (4) The schemes must be implemented as approved unless otherwise agreed with the relevant planning authority.
Highway accesses
8
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the siting, design and layout (including visibility splays and construction specification) of any new or modified means of access between any part of the Order limits and the public highway to be used by vehicular traffic during construction, and the means of reinstating any such means of access after construction has, for that part, been submitted to and, after consultation with the highway authority, approved by the relevant planning authority.
- (2) The highway accesses approved pursuant to sub-paragraph (1) must be constructed in accordance with the approved details prior to the start of construction of the relevant part of the authorised development (other than the accesses), and where temporary, reinstated prior to the date of final commissioning, unless otherwise agreed with the relevant planning authority.
- (3) Prior to the date of final commissioning details of the siting, design and layout (including visibility splays and construction specification) of any new or modified permanent means of access to a highway to be used by vehicular traffic, must be submitted to and, after consultation with the highway authority, approved by the relevant planning authority.
- (4) The highway accesses approved pursuant to sub-paragraph (3) must be constructed in accordance with the details approved unless otherwise agreed with the relevant planning authority.
Means of enclosure
9
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a programme for the removal of all temporary means of enclosure for any construction areas or sites associated with the authorised development has, for that part, been submitted to and approved by the relevant planning authority.
- (2) Any construction areas or sites associated with the authorised development must remain securely fenced at all times during construction and commissioning of the authorised development.
- (3) Any temporary fencing must be removed by the end of three months beginning with the date of completion of construction of the authorised development (or such other period as the relevant planning authority may approve).
- (4) Prior to the date of final commissioning details of any proposed permanent means of enclosure must be submitted to and approved by the relevant planning authority.
- (5) Any permanent means of enclosure approved pursuant to sub-paragraph (4) must be completed prior to the date of final commissioning.
- (6) The authorised development must be carried out in accordance with the approved details unless otherwise agreed with the relevant planning authority.
- (7) In this requirement, “means of enclosure” means fencing, walls or other means of boundary treatment and enclosure.
Surface water drainage
10
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details of the temporary surface water drainage systems, including means of pollution control in accordance with the construction environmental management plan submitted pursuant to requirement 14 and a management and maintenance plan to ensure that the systems remain fully operational throughout the construction of the relevant part of the authorised development have, for that part, been submitted to, and after consultation with the lead local flood authority and North East Lindsey Internal Drainage Board, approved by the relevant planning authority.
- (2) The scheme approved pursuant to sub-paragraph (1) must be implemented as approved and maintained throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (3) Details of the permanent surface water drainage systems, including a programme for their implementation, must be submitted to, and after consultation with the Environment Agency, the lead local flood authority, Anglian Water and North East Lindsey Internal Drainage Board, approved by the relevant planning authority prior to the start of construction of any part of those systems.
- (4) The details submitted and approved pursuant to sub-paragraphs (1) and (3) of this requirement must be in accordance with the principles set out in chapter 12 (surface water, flood risk and drainage) of the environmental statement and the flood risk assessment.
- (5) The scheme approved pursuant to sub-paragraph (3) must be implemented as approved and maintained throughout the operation of the authorised development unless otherwise agreed with the relevant planning authority.
Flood risk mitigation
11
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a scheme for the mitigation of flood risk during construction, has, for that part, been submitted to and approved by the relevant planning authority.
- (2) The scheme approved pursuant to sub-paragraph (1) must be implemented as approved and maintained throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
- (3) No part of the authorised development may commence save for the permitted preliminary works until a scheme for the mitigation of flood risk during operation has, for that part, been submitted to and, after consultation with the Environment Agency and North East Lindsey Internal Drainage Board, approved by the relevant planning authority.
- (4) The schemes submitted and approved pursuant to sub-paragraphs (1) and (3) of this requirement must be in accordance with the principles set out in chapter 12 (surface water, flood risk and drainage) of the environmental statement and the flood risk assessment.
- (5) The scheme approved pursuant to sub-paragraph (3) must be implemented as approved and maintained throughout the operation of the authorised development unless otherwise agreed with the relevant planning authority.
- (6) The authorised development must not be commissioned until the flood risk mitigation has been implemented and a flood emergency response and contingency plan has been submitted to, and after consultation with North East Lindsey Internal Drainage Board, approved by the relevant planning authority.
- (7) The plan approved pursuant to sub-paragraph (6) must be implemented throughout the commissioning and operation of the authorised development unless otherwise agreed with the relevant planning authority.
Contaminated land and groundwater
12
- (1) No part of the authorised development may commence, save for geotechnical surveys and other investigations for the purpose of assessing ground conditions, until a scheme to deal with the contamination of land, including groundwater, which is likely to cause significant harm to persons or pollution of controlled waters or the environment, has, for that part, been submitted to and, after consultation with the Environment Agency, approved by the relevant planning authority.
- (2) The scheme submitted and approved must be in accordance with the principles set out in chapter 11 (ground conditions and hydrogeology) of the Environmental Statement and with the construction environmental management plan submitted pursuant to requirement 14.
- (3) The scheme must include a risk assessment, supported by site investigation data, to identify the extent of any contamination and the remedial measures to be taken to render the land fit for its intended purpose, together with a materials management plan, which sets out long-term measures with respect to any contaminants remaining on the site.
- (4) The authorised development, including any remediation, must be carried out in accordance with the approved scheme unless otherwise agreed with the relevant planning authority.
- (5) Should any remediation be required a verification report demonstrating the completion of works set out in the approved scheme and the effectiveness of the remediation must be submitted to, and approved, by the relevant planning authority prior to the date of final commissioning. The report must include results of sampling and monitoring carried out in accordance with the approved scheme to demonstrate that the site remediation criteria have been met.
Archaeology
13
- (1) No part of the authorised development may commence until a written scheme of investigation for that part has been submitted to and, after consultation with Historic England, approved by the relevant planning authority.
- (2) The scheme submitted and approved must be in accordance with chapter 13 (cultural heritage) of the environmental statement and the framework written scheme of investigation.
- (3) The scheme must identify whether any further archaeological investigations are required and, if investigations are deemed to be required, the nature and extent of the investigations in order to preserve by knowledge or in-situ any archaeological features that are identified.
- (4) The scheme must provide details of the measures to be taken to protect, record or preserve any significant archaeological features that may be found.
- (5) Any archaeological investigations implemented and measures taken to protect, record or preserve any identified significant archaeological features that may be found must be carried out—
- (a) in accordance with the approved scheme; and
- (b) by a suitably qualified person or organisation approved by the relevant planning authority unless otherwise agreed with the relevant planning authority.
Construction environmental management plan
14
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction environmental management plan has been submitted to and, after consultation with Natural England, approved by the relevant planning authority.
- (2) The plan submitted and approved must be in accordance with the framework construction environmental management plan and incorporate—
- (a) a code of construction practice, specifying measures designed to minimise the impacts of construction works;
- (b) a scheme for the control of emissions of dust;
- (c) a soil management plan;
- (d) a sediment control plan;
- (e) a scheme for environmental monitoring and reporting during the construction of the authorised development, including measures for undertaking any corrective actions;
- (f) a scheme for the notification of any significant construction impacts on local residents and for handling any complaints received from local residents relating to such impacts during the construction of the authorised development; and
- (g) a requirement that the detail of the fencing and protection of asset A6 is in accordance with the strategy set out in the framework written scheme of investigation.
- (3) All construction works associated with the authorised development must be carried out in accordance with the approved construction environmental management plan unless otherwise agreed with the relevant planning authority.
- (4) The plan submitted must include information on the proposed piling methods, their approximate duration and timing, the likely sound power levels, and any necessary management measures or mitigation to ensure, taking into account the information in the statement to inform appropriate assessment, that there will be no adverse impact on any qualifying species of the Humber Estuary Special Protection Area and Ramsar Site.
Protection of highway surfaces
15
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until details for undertaking condition surveys of the relevant parts of Rosper Road which are maintainable at the public expense and which are to be used during construction have been submitted to and, after consultation with the highway authority, approved by the relevant planning authority.
- (2) The condition surveys must be undertaken in accordance with the approved details and a schedule of repairs required due to use by construction traffic for the authorised development, including a programme for undertaking any such repairs and their inspection, must, following the completion of the post-construction condition surveys, be submitted to, and after consultation with the highway authority, approved by the relevant planning authority.
- (3) The schedule of repairs must be carried out as approved unless otherwise agreed with the relevant planning authority.
Construction traffic management plan
16
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction traffic management plan has been submitted to and, after consultation with North East Lincolnshire Council, Highways England and the highway authority, approved by the relevant planning authority.
- (2) The plan submitted and approved must be in accordance with chapter 7 (traffic and transport) of the environmental statement and the framework construction traffic management plan.
- (3) The plan submitted and approved must include—
- (a) details of the routes to be used for the delivery of construction materials and any temporary signage to identify routes and promote their safe use, including details of the access points to the construction site to be used by light goods vehicles and heavy goods vehicles;
- (b) details of the routing strategy and procedures for the notification and conveyance of abnormal invisible loads, including agreed routes, the numbers of abnormal loads to be delivered by road and measures to mitigate traffic impact; ...
- (c) any necessary measures for the temporary protection of carriageway surfaces, the protection of statutory undertakers' plant and equipment, and any temporary removal of street furniture; and
- (d) the construction programme.
- (4) Notices must be erected and maintained throughout the period of construction at every entrance to and exit from the construction site, indicating to drivers the approved routes for traffic entering and leaving the construction site.
- (5) The plan must be implemented as approved unless otherwise agreed with the relevant planning authority.
Construction workers travel plan
17
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction workers travel plan has been submitted to and, after consultation with North East Lincolnshire Council, Highways England and the highway authority, approved by the relevant planning authority.
- (2) The plan submitted and approved must be in accordance with chapter 7 (traffic and transport) of the environmental statement and the framework construction worker travel plan.
- (3) The plan submitted and approved must include—
- (a) measures to promote the use of sustainable transport to and from the authorised development by construction staff;
- (b) provision as to the responsibility for, and timescales of, the implementation of those measures;
- (c) details of parking for construction personnel within the construction sites; and
- (d) a monitoring and review regime.
- (4) The approved plan must be implemented prior to commencement of the authorised development, save for the permitted preliminary works, and must be maintained throughout the construction of the authorised development unless otherwise agreed with the relevant planning authority.
Construction hours
18
- (1) Construction work relating to the authorised development must not take place on bank holidays or otherwise outside the hours of—
- (a) 0700 to 1900 hours on Monday to Friday; and
- (b) 0800 to 1800 hours on a Saturday.
- (2) Delivery or removal of materials, plant and machinery must not take place on bank holidays nor outside the hours of 0700 to 1900 hours on Monday to Saturday.
- (3) The restrictions in sub-paragraphs (1) and (2) do not apply to construction work or the delivery or removal of materials, plant and machinery, where these—
- (a) do not exceed a noise limit measured at the Order limits which has been agreed with the relevant planning authority;
- (b) are carried out with the prior approval of the relevant planning authority; or
- (c) are associated with an emergency.
- (4) The restrictions in sub-paragraph (2) do not apply to the delivery of abnormal indivisible loads, which are—
- (a) associated with an emergency; or
- (b) carried out with the prior approval of the relevant planning authority.
- (5) Sub-paragraph (1) does not preclude—
- (a) a start-up period from 0630 to 0700 and a shut-down period from 1900 to 1930 Monday to Friday and a start-up period from 0730 to 0800 and a shut-down period from 1800 to 1830 on a Saturday; or
- (b) maintenance at any time of plant and machinery engaged in the construction of the authorised development.
- (6) In this requirement—
- “shut down period” means the period during which construction workers may return to the site office to return safety and other equipment, attend debrief sessions, change clothing and prepare to leave site; and
- “start-up period” means the period during which construction workers may arrive at site, sign in, don personal protective equipment, attend safety and other briefings and mobilise on site.
Control of noise - operation
19
- (1) Prior to the date of final commissioning a scheme for the management and monitoring of noise during operation of the authorised development must be submitted to and approved by the relevant planning authority.
- (2) The scheme submitted pursuant to sub-paragraph (1) must include the results of daytime and night time baseline noise monitoring that has been carried out by the undertaker for the purposes of this requirement as agreed with the relevant planning authority.
- (3) Noise (in terms of the BS4142:2014 rating level) from the operation of the authorised development must be no greater than 3dB higher than the defined representative background sound level during each of the daytime and the night time, adjacent to the nearest residential properties at locations agreed with the relevant planning authority.
- (4) The scheme must be implemented as approved unless otherwise agreed with the relevant planning authority.
- (5) In this requirement—
- (a) “daytime” means the period from 0700 to 2300 and “night time” means the period from 2300 to 0700; and
- (b) “defined representative background sound level” means the sound level measured during the monitoring secured by sub-paragraph (2).
Piling and penetrative foundation design
20
- (1) No part of the authorised development comprised within Work No. 1 may commence, save for the permitted preliminary works, until a written piling and penetrative foundation design method statement, informed by a risk assessment, for that part, has been submitted to and, after consultation with the Environment Agency, approved by the relevant planning authority.
- (2) All piling and penetrative foundation works must be carried out in accordance with the approved method statement unless otherwise agreed with the relevant planning authority.
Waste management on site - construction wastes
21
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a construction site waste management plan for that part has been submitted to and approved by the relevant planning authority.
- (2) The plan submitted and approved must be in accordance with the principles set out in the framework construction environmental management plan.
- (3) The plan must be implemented as approved unless otherwise agreed with the relevant planning authority.
Restoration of land used temporarily for construction
22
- (1) Prior to the date of final commissioning a scheme for the restoration of any land within the Order limits which has been used temporarily for construction must be submitted to and approved by the relevant planning authority.
- (2) The land must be restored within three years of the date of final commissioning (or such other period as the relevant planning authority may approve), in accordance with the restoration scheme approved in accordance with sub-paragraph (1).
Employment, skills and training plan
23
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until a plan detailing arrangements to promote employment, skills and training development opportunities for local residents during construction and employment opportunities during operation of the authorised development has been submitted to and, after consultation with North East Lincolnshire Council, approved by the relevant planning authority.
- (2) The approved plan must be implemented and maintained during the construction and operation of the authorised development unless otherwise agreed with the relevant planning authority.
Decommissioning
24
- (1) Within 12 months of the date that the undertaker decides to decommission the authorised development, the undertaker must submit to the relevant planning authority for their approval a decommissioning environmental management plan.
- (2) No decommissioning works may be carried out until the relevant planning authority has approved the plan.
- (3) The plan submitted and approved must include details of—
- (a) the buildings to be demolished;
- (b) the means of removal of the materials resulting from the decommissioning works;
- (c) the phasing of the demolition and removal works;
- (d) any restoration works to restore the land to a condition agreed with the relevant planning authority;
- (e) the phasing of any restoration works; and
- (f) a timetable for the implementation of the scheme.
- (4) The plan must be implemented as approved unless otherwise agreed with the relevant planning authority.
Foul water drainage
25
- (1) No part of the authorised development may commence, save for the permitted preliminary works, until full details of a scheme, for the connection, conveyance, treatment and disposal of mains foul water drainage on and off site has been submitted to, and after consultation with the Environment Agency and Anglian Water, approved by the relevant planning authority.
- (2) If it is demonstrated as part of the information submitted pursuant to sub-paragraph (1) that it is not practicable or reasonable to connect to a mains system, an alternative strategy for the provision and implementation of wastewater treatment must be submitted to and, after consultation with the Environment Agency and Anglian Water, approved by the relevant planning authority. Any non-mains drainage proposal must include a management and maintenance plan to ensure that it will not cause pollution to the water environment.
- (3) The schemes approved pursuant to sub-paragraph (1) and (where relevant) sub-paragraph (2) must be implemented and maintained throughout the operation of the authorised development unless otherwise agreed with the relevant planning authority.
Requirement for written approval
26
Where under any of the above requirements the approval or agreement of the relevant planning authority or another person is required, that approval or agreement must be provided in writing.
Approved details and amendments to them
27
- (1) All details submitted for approval of the relevant planning authority under these requirements must be in accordance with the parameters of the environmental statement and reflect the principles set out in the documents certified under article 39 (certification of plans etc.).
- (2) With respect to any requirement which requires the authorised development to be carried out in accordance with the details approved by the relevant planning authority, the approved details are to be taken to include any amendments that may subsequently be approved by the relevant planning authority.
Amendments agreed by the relevant planning authority
28
- (1) Where the words “unless otherwise agreed with the relevant planning authority” appear in the above requirements, any such approval or agreement may only be given in relation to non-material amendments and where it has been demonstrated to the satisfaction of the relevant planning authority that the subject matter of the approval or agreement sought will not give rise to any materially new or materially different environmental effects from those assessed in the environmental statement.
- (2) In cases where the requirement or the relevant sub-paragraph requires consultation with specified persons, any approval or agreement must not be given without the relevant planning authority having first consulted with those persons.
SCHEDULE 3 — STREETS SUBJECT TO STREET WORKS
| (1) Area | (2) Street subject to street works | (3) Description of the street works |
|---|---|---|
| In the District of North Lincolnshire | Rosper Road | Works to repair and resurface the access and to maintain visibility splays in the areas cross hatched in red and blue at the point marked C on sheet 1 of the access and rights of way plans |
| In the District of North Lincolnshire | Rosper Road | Works to repair and resurface the access and to maintain visibility splays in the area cross hatched in red at the point marked A on sheet 1 of the access and rights of way plans |
| In the District of North Lincolnshire | Rosper Road | Works for the installation and maintenance of Work No. 6 in the area cross hatched in blue at the point marked B on sheet 1 of the access and rights of way plans |
SCHEDULE 4 — ACCESS
PART 1 — THOSE PARTS OF THE ACCESSES TO BE MAINTAINED BY THE HIGHWAY AUTHORITY
| (1) Area | (2) Street | (3) Description of relevant part of access |
|---|---|---|
| In the District of North Lincolnshire | Rosper Road | That part of the access in the area cross hatched in blue at the point marked C on sheet 1 of the access and rights of way plans |
PART 2 — THOSE PARTS OF THE ACCESSES TO BE MAINTAINED BY THE STREET AUTHORITY
| (1) Area | (2) Street | (3) Description of relevant part of access |
|---|---|---|
| In the District of North Lincolnshire | Rosper Road | That part of the access cross hatched in red at the point marked A on sheet 1 of the access and rights of way plans |
| In the District of North Lincolnshire | Rosper Road | That part of the access cross hatched in red at the point marked C on sheet 1 of the access and rights of way plans |
SCHEDULE 5 — TEMPORARY PROHIBITION OR RESTRICTION OF THE USE OF STREETS
| (1) Area | (2) Streets subject to temporary prohibition or restriction of use | (3) Extent of temporary prohibition or restriction of use of street |
|---|---|---|
| In the District of North Lincolnshire | Rosper Road | Temporary closure of the part of the street cross hatched in blue at the point marked B on sheet 1 of the access and rights of way plans |
SCHEDULE 6 — LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED
| (1)Class of compulsory acquisition and the creation of rights and the imposition of restrictions for the installation and use of the authorised development | (2)Means of all rights and restrictions necessary for the undertaker and/or those authorised by the undertaker |
|---|---|
| (a) | To pass and repass on foot, with or without vehicles, plant and machinery |
| (b) | To construct, maintain, improve and protect access routes |
| (c) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an underground and overground gas pipeline up to 600 millimetres (nominal internal diameter), control systems and cables and any other ancillary apparatus and any other works as necessary |
| (d) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an overground electrical connection of up to 400 kilovolt, control systems and any other ancillary apparatus and any other works as necessary |
| (e) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve water pipes, connections, structures and ancillary equipment; telecommunications cables and equipment; compressed air connections and ancillary equipment; electrical cables, connections and ancillary equipment; control systems and cables; closed circuit television and security system connections; and any other ancillary apparatus and any other works as necessary |
| (f) | To retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve an underground gas pipeline, control systems and cables and any other ancillary apparatus and any other works as necessary |
| (g) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve water pipes, connections, structures and ancillary equipment and any other ancillary apparatus and any other works as necessary |
| (h) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve security fencing, gates, boundary treatment and any other ancillary apparatus and any other works as necessary |
| (i) | To install, retain, use, maintain, inspect, alter, remove, refurbish, reconstruct, replace, protect and improve gatehouses and weighbridges and any other ancillary apparatus and any other works as necessary |
| (j) | Restrictions on erecting buildings or structures, altering ground levels, planting trees or carrying out operations or actions which may obstruct, interrupt or interfere with the exercise of rights |
| (1)Plot | (2)Class of rights listed in Table 5 applicable to the plot |
| --- | --- |
| 2 | (a), (b), (h), (i) and (j) |
| 6 | (a) and (g) |
| 7 | (a) and (g) |
| 8 | (a), (b), (h), (i) and (j) |
| 9 | (a), (b), (h), (i) and (j) |
| 10 | (a), (b), (h), (i) and (j) |
| 12 | (a), (e) and (j) |
| 14 | (a), (e), (b), (h), (i) and (j) |
| 15 | (a), (b), (h), (i) and (j) |
| 16 | (a), (c) and (j) |
| 17 | (a), (d), (e), (c) and (j) |
| 17a | (a), (d), (e), (c) and (j) |
| 18 | (a), (e) and (j) |
| 20 | (a), (b), (c), (h), (i) and (j) |
| 21 | (a), (b), (h), (i) and (j) |
| 22 | (a), (b), (e), (h), (i) and (j) |
| 23 | (a), (b), (c), (d), (e), (h), (i) and (j) |
| 23a | (a), (b), (c), (d), (e), (h), (i) and (j) |
| 24 | (a), (d) and (j) |
| 24a | (a), (d) and (j) |
| 25 | (a), (b), (h), (i) and (j) |
| 26 | (a), (b), (h), (i) and (j) |
| 27 | (a), (e) and (j) |
| 28 | (a), (b), (c), (e), (h), (i) and (j) |
| 29 | (a), (b), (c), (e), (h), (i) and (j) |
| 30 | (a), (b), (d), (h), (i) and (j) |
| 30a | (a), (b), (d), (h), (i) and (j) |
| 31 | (a), (b), (h), (i) and (j) |
| 32 | (a), (e), (b), (h), (i) and (j) |
| 34 | (a), (b), (h), (i) and (j) |
| 35 | (a), (b), (c) (h), (i) and (j) |
| 33, 37-111 | (a) and (f) |
SCHEDULE 7 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF NEW RESTRICTIVE COVENANTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right as they apply as respects compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation to the scope of paragraph 1, the Land Compensation Act 1973 has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
- (a) for “land is acquired or taken from” substitute “ a right or restrictive covenant over land is purchased from or imposed on ”; and
- (b) for “acquired or taken from him” substitute “ over which the right is exercisable or the restrictive covenant enforceable ”.
3
- (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
- (2) In section 5A(5A) (relevant valuation date) of the 1961 Act, for (a) and (b) substitute—
(a) the acquiring authority enters on land for the purpose of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 7 to the Immingham Open Cycle Gas Turbine Order 2020; ... (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 7 to the Immingham Open Cycle Gas Turbine Order 2020 to acquire an interest in the land, and (c) the acquiring authority enters on and takes possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land where it entered on that land for the purpose of exercising that right.
Application of Part 1 of the 1965 Act
4
Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and modified by article 25 (modification of Part 1 of the Compulsory Purchase Act 1965)) to the acquisition of land under article 18 (compulsory acquisition of land), applies to the compulsory acquisition of a right by the creation of a new right, or to the imposition of a restrictive covenant under article 21 (compulsory acquisition of rights etc.)—
- (a) with the modification specified in paragraph 5; and
- (b) with such other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows.
- (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired, or the restrictive covenant imposed or to be imposed; or
- (b) the land over which the right is or is to be exercisable, or the restrictive covenant is or is to be enforceable.
- (3) For section 7 of the 1965 Act there is substituted the following section—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the special Act.
- (4) The following provisions of the 1965 Act (which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (persons without powers to sell their interests);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are so modified as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.
- (5) Section 11 (powers of entry) of the 1965 Act is modified as to secure that, where the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to compulsory acquisition under article 18, it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant; and sections 11A (powers of entry: further notices of entry), 11B (counter-notice requiring possession to be taken on a specified date), 12 (unauthorised entry) and 13 (entry on warrant in the event of obstruction) of the 1965 Act are modified correspondingly.
- (6) Section 20 (tenants at will etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 25(3) (modification of Part 1 of the Compulsory Purchase Act 1965) is also modified as to enable the acquiring authority, in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired or enforce the restrictive covenant imposed, subject to compliance with that section as respects compensation.
- (8) For Schedule 2A to the 1965 Act substitute—
SCHEDULE 2A (1) (1) This Schedule applies where an acquiring authority serve a notice to treat in respect of a right over, or restrictive covenant affecting, the whole or part of a house, building or factory and have not executed a general vesting declaration under section 4 of the 1981 Act (execution of declaration) as applied by article 23 of the Immingham Open Cycle Gas Turbine Order 2020 (application of the Compulsory Purchase (Vesting Declarations) Act 1981) in respect of the land to which the notice to treat relates. (2) But see article 24(3) of the Immingham Open Cycle Gas Turbine Order 2020 (acquisition of subsoil only) which excludes the acquisition of subsoil only from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the authority to purchase the owner's interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The authority must serve notice of their decision on the owner within the period of three months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the authority decide to refer the counter-notice to the Upper Tribunal they must do so within the decision period. (8) If the authority do not serve notice of a decision within the decision period they are to be treated as if they had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the authority serve notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner's interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making its determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the authority ought to be required to take. (13) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner's interest in that land. (14) (1) If the Upper Tribunal determines that the authority ought to be required to take some or all of the house, building or factory, the authority may at any time within the period of six weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph they must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawal of the notice. (3) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 8 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1) Plot | (2) Purpose for which temporary possession may be taken |
|---|---|
| 01 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
| 03 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
| 04 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
| 11 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
| 13 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
| 19 | Temporary use as a construction and laydown area to facilitate construction and commissioning of Work No.1, Work No.2, Work No.4, Work No.5 and Work No.6 |
SCHEDULE 9 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.
2
In this Part—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner not less efficient than previously;
- “apparatus” means—in the case of a utility undertaker within paragraph (a) of the definition of that term, electric lines or electrical plant (as defined in the Electricity Act 1989 ), belonging to or maintained by that utility undertaker;in the case of a utility undertaker within paragraph (b) of the definition of that term, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply;in the case of a utility undertaker within paragraph (c) of the definition of that term—mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; andany water mains or service pipes (or part of a water main or service pipe) that is the subject of an agreement to adopt made under section 51A (agreement to adopt water main or service pipe at future date) of the Water Industry Act 1991;in the case of a utility undertaker within paragraph (d) of the definition of that term—any drain or works vested in the utility undertaker under the Water Industry Act 1991; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4) (adoption of sewers and disposal works) of that Act or an agreement to adopt made under section 104 (agreements to adopt sewer, drain or sewage disposal works, at future date) of that Act, and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act) or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works, and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
- “utility undertaker” means—any licence holder within the meaning of Part 1 (electricity supply) of the Electricity Act 1989;a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986;water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991,for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.
Precedence of the 1991 Act in respect of apparatus in the streets
3
This Part does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
4
Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 11 (temporary prohibition or restriction of use of streets), a utility undertaker is at liberty at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.
No acquisition etc. except by agreement
5
Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.
Removal of apparatus
6
- (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that the utility undertaker's apparatus is relocated or diverted, that apparatus must not be removed under this Part, and any right of a utility undertaker to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided, to the reasonable satisfaction of the utility undertaker in question in accordance with sub-paragraphs (2) to (7).
- (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give to the utility undertaker in question written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order a utility undertaker reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to the utility undertaker the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, the utility undertaker in question must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably possible use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
- (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between the utility undertaker in question and the undertaker or in default of agreement settled by arbitration in accordance with article 42 (arbitration).
- (5) The utility undertaker in question must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with article 42 (arbitration), and after the grant to the utility undertaker of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part.
- (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to the utility undertaker in question that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by the utility undertaker, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of the utility undertaker.
- (7) Nothing in sub-paragraph (6) authorises the undertaker to execute the placing, installation, bedding, packing, removal, connection or disconnection of any apparatus, or execute any filling around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
Facilities and rights for alternative apparatus
7
- (1) Where, in accordance with the provisions of this Part, the undertaker affords to a utility undertaker facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and the utility undertaker in question or in default of agreement settled by arbitration in accordance with article 42.
- (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to the utility undertaker in question than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to that utility undertaker as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
Retained Apparatus
8
- (1) Not less than 28 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 6(2), the undertaker must submit to the utility undertaker in question a plan, section and description of the works to be executed.
- (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by the utility undertaker for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and the utility undertaker is entitled to watch and inspect the execution of those works.
- (3) Any requirements made by a utility undertaker under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
- (4) If a utility undertaker in accordance with sub-paragraph (1) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 1 to 7 apply as if the removal of the apparatus had been required by the undertaker under paragraph 6(2).
- (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
- (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to the utility undertaker in question notice as soon as is reasonably practicable and a plan, section and description of those works as soon as reasonably practicable subsequently and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
Expenses and costs
9
- (1) Subject to the following provisions of this paragraph, the undertaker must repay to a utility undertaker the reasonable expenses incurred by that utility undertaker in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 6(2).
- (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part, that value being calculated after removal.
- (3) If in accordance with the provisions of this Part—
- (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
- (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,
and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 to be necessary, then, if such placing involves cost in the construction of works under this Part exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to the utility undertaker in question by virtue of sub-paragraph (1) is to be reduced by the amount of that excess.
- (4) For the purposes of sub-paragraph (3)—
- (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 6(2); and
- (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
- (5) An amount which apart from this sub-paragraph would be payable to a utility undertaker in respect of works by virtue of sub-paragraph (1), if the works include the placing of apparatus provided in substitution for apparatus placed more than seven years and six months earlier so as to confer on the utility undertaker any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course, is to be reduced by the amount which represents that benefit.
10
- (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 6(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of a utility undertaker, or there is any interruption in any service provided, or in the supply of any goods, by any utility undertaker, the undertaker must—
- (a) bear and pay the cost reasonably incurred by that utility undertaker in making good such damage or restoring the supply; and
- (b) make reasonable compensation to that utility undertaker for any other expenses, loss, damages, penalty or costs incurred by the utility undertaker,
by reason or in consequence of any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of a utility undertaker, its officers, servants, contractors or agents.
- (3) A utility undertaker must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
Enactments and agreements
11
Nothing in this Part affects the provisions of any enactment or agreement regulating the relations between the undertaker and a utility undertaker in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 2 — FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS
12
- (1) For the protection of any operator, the following provisions have effect, unless otherwise agreed in writing between the undertaker and the operator.
- (2) In this Part—
- “the 2003 Act” means the Communications Act 2003 ;
- “electronic communications apparatus” has the same meaning as set out in paragraph 5 of the electronic communications code;
- “the electronic communications code” has the same meaning as set out in section 106 (application of the electronic communications code) of the 2003 Act ;
- “infrastructure system” has the same meaning as in the electronic communications code and references to providing an infrastructure system are to be construed in accordance with paragraph 7 of that code;
- “network” means—so much of a network or infrastructure system provided by an operator as is not excluded from the application of the electronic communications code by a direction under section 106(5) of the 2003 Act; anda network which the Secretary of State is providing or proposing to provide; and
- “operator” means a person in whose case the electronic communications code is applied by a direction under section 106(5) of the 2003 Act and who is an operator of a network.
13
The exercise of the powers of article 29 (statutory undertakers) is subject to Part 10 of Schedule 3A (the electronic communications code) of the 2003 Act.
14
- (1) Subject to sub-paragraphs (2) to (4), if as the result of the authorised development or its construction, or of any subsidence resulting from any of those works—
- (a) any damage is caused to any electronic communications apparatus belonging to an operator (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works), or other property of an operator; or
- (b) there is any interruption in the supply of the service provided by an operator, the undertaker must bear and pay the cost reasonably incurred by the operator in making good such damage or restoring the supply and make reasonable compensation to that operator for any other expenses, loss, damages, penalty or costs incurred by it, by reason, or in consequence of, any such damage or interruption.
- (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of an operator, its officers, servants, contractors or agents.
- (3) The operator must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise of the claim or demand is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
- (4) Any difference arising between the undertaker and the operator under this Part of this Schedule must be referred to and settled by arbitration under article 42 (arbitration).
15
This Part of this Schedule does not apply to—
- (a) any apparatus in respect of which the relations between the undertaker and an operator are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act; or
- (b) any damage, or any interruption, caused by electro-magnetic interference arising from the construction or use of the authorised development.
16
Nothing in this Part affects the provisions of any enactment or agreement regulating the relations between the undertaker and an operator in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.
PART 3 — FOR THE PROTECTION OF NATIONAL GRID AS ELECTRICITY AND GAS UNDERTAKER
Application
17
For the protection of National Grid referred to in this Part of this Schedule the following provisions, unless otherwise agreed in writing between the undertaker and National Grid, have effect.
Interpretation
18
In this Part of this Schedule—
- “alternative apparatus” means appropriate alternative apparatus to the satisfaction of National Grid to enable National Grid to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant as defined in the Electricity Act 1989 belonging to or maintained by that undertaker;in the case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter for the purposes of gas supply,together with any replacement apparatus and such other apparatus constructed pursuant to the Order that becomes operational apparatus of National Grid for the purposes of transmission, distribution and/or supply and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
- “authorised development” has the same meaning as in article 2 (interpretation) of this Order and includes any associated development authorised by the Order and (unless otherwise specified) for the purposes of this Part of this Schedule includes the use and maintenance of the authorised development and construction of any works authorised by this Schedule;
- “commence” has the same meaning as in article 2 (interpretation) of the Order and commencement is to be construed to have the same meaning save that for the purposes of this Part only the terms commence and commencement include any below ground surveys, monitoring or operations or receipt and erection of construction plant and equipment within 15 metres of any apparatus;
- “deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary and/or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
- “functions” includes powers and duties;
- “ground mitigation scheme” means a scheme approved by National Grid (such approval not to be unreasonably withheld or delayed) setting out the necessary mitigation measures (if any) for a ground subsidence event;
- “ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, will require the undertaker to submit for National Grid's approval a ground mitigation scheme;
- “ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
- “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of the undertaker including construct, use, repair, alter, inspect, renew or remove the apparatus;
- “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
- “National Grid” means—National Grid Electricity Transmission plc (company number 2366977) whose registered office is at 1-3 Strand, London WC2N 5EH; andNational Grid Gas plc (company number 200600) whose registered office is at 1-3 Strand, London WC2N 5EH,as the context requires; and
- “specified works” means any of the authorised development or activities undertaken in association with the authorised development which—will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 23(2) or otherwise;may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under paragraph 23(2) or otherwise; and/orincludes in relation to gas apparatus any of the activities that are referred to in paragraph 8 of T/SP/SSW/22 (National Grid's policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of National Grid, High pressure Gas pipelines and associated installation requirements for third parties T/SP/SSW/22”.
On Street Apparatus
19
Except for paragraphs 20 (apparatus of undertakers in streets subject to temporary prohibition or restriction), 25 (retained apparatus: protection of gas undertaker), 27 (expenses) and 28 (indemnity) of this Schedule which will apply in respect of the exercise of all or any powers under this Order affecting the rights and apparatus of National Grid, the other provisions of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and National Grid are regulated by the provisions of Part 3 of the 1991 Act.
Apparatus of undertakers in streets subject to temporary prohibition or restriction
20
Notwithstanding a temporary prohibition or restriction under the powers of article 11 (temporary prohibition or restriction on the use of streets), National Grid will be at liberty at all times to take all necessary access across any street and/or to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.
Protective works to buildings
21
- (1) The undertaker, in the case of the powers conferred by article 33 (protective works to buildings), must exercise those powers so as not to obstruct or render less convenient the access to any apparatus without the written consent of National Grid and, if by reason of the exercise of those powers any damage to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal or abandonment) or property of National Grid or any interruption in the supply of electricity and/or gas, as the case may be, by National Grid is caused, the undertaker must bear and pay on demand the cost reasonably incurred by National Grid in making good such damage or restoring the supply; and, subject to sub-paragraph (2), must—
- (a) pay compensation to National Grid for any loss sustained by it; and
- (b) indemnify National Grid against all claims, demands, proceedings, costs, damages and expenses which may be made or taken against or recovered from or incurred by that undertaker, by reason of any such damage or interruption.
- (2) Nothing in this paragraph imposes any liability on the undertaker with respect to any damage or interruption to the extent that such damage or interruption is attributable to the act, neglect or default of National Grid or its contractors or workmen; and National Grid will give to the undertaker reasonable notice of any claim or demand as aforesaid and no settlement or compromise thereof may be made by National Grid, save in respect of any payment required under a statutory compensation scheme, without first consulting the undertaker and giving the undertaker an opportunity to make representations as to the claim or demand.
Acquisition of land
22
- (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to this Order, the undertaker may not appropriate or acquire or take temporary possession of any land interest or appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or apparatus of National Grid otherwise than by agreement, such agreement not to be unreasonably withheld.
- (2) As a condition of agreement between the parties in paragraph 22(1), prior to the carrying out of any part of the authorised works (or in such other timeframe as may be agreed between National Grid and the undertaker) that are subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement and/or other legal or land interest of National Grid and/or affect the provision of any enactment or apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as National Grid reasonably requires enter into such deeds of consent upon such terms and conditions as may be agreed between National Grid and the undertaker acting reasonably and which must be no less favourable on the whole to National Grid unless otherwise agreed by National Grid, and it will be the responsibility of the undertaker to procure and/or secure the consent and entering into of such deeds and variation by all other third parties with an interest in the land at that time who are affected by such authorised works.
- (3) The undertaker and National Grid agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus (including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus) and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by National Grid and/or other enactments relied upon by National Grid as of right or other use in relation to the apparatus, then the provisions in this Schedule will prevail.
- (4) Any agreement or consent granted by National Grid under paragraph 25 or any other paragraph of this Part of this Schedule, must not be taken to constitute agreement under sub-paragraph (3).
Removal of apparatus
23
- (1) If, in the exercise of the agreement reached in accordance with paragraph 22 or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be removed under this Part of this Schedule and any right of National Grid to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, and is in operation to the reasonable satisfaction of National Grid in question in accordance with sub-paragraphs (2) to (5) inclusive.
- (2) If, for the purpose of executing any works comprised in the authorised development in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to National Grid advance written notice of that requirement, together with a plan of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order National Grid reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to National Grid to its satisfaction (taking into account paragraph 24(1) below) the necessary facilities and rights—
- (a) for the construction of alternative apparatus in other land of or land secured by the undertaker; and
- (b) subsequently for the maintenance of that apparatus.
- (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of or land secured by the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, National Grid must, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation must not extend to the requirement for National Grid to use its compulsory purchase powers to this end unless it elects to so do.
- (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between National Grid and the undertaker.
- (5) National Grid must, after the alternative apparatus to be provided or constructed has been agreed, and subject to the prior grant to National Grid of any such facilities and rights as are referred to in sub-paragraph (2) or (3), proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
Facilities and rights for alternative apparatus
24
- (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for National Grid facilities and rights in land for the construction, use, maintenance and protection of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and National Grid and must be no less favourable on the whole to National Grid than the facilities and rights enjoyed by it in respect of the apparatus to be removed unless otherwise agreed by National Grid.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.