The Immingham Open Cycle Gas Turbine Order 2020

Type Statutory-Instrument
Publication 2020-08-07
Last updated 2025-05-23
State In force
Department King's Printer of Acts of Parliament
PDF Download
articles Not indexed
Reform history JSON API

The undertaker must not exercise the powers granted under this Order so as to hinder or prevent—

  • (a) the construction, operation, use or maintenance of the Able authorised development; or
  • (b) access to all parts of the Able authorised development,

otherwise than with the prior written consent of Able.

129

If the undertaker proposes to alter the layout of the existing highway access points within plots 2, 8 or 9, it must not submit written details for numbered work 2 so far as it is within those plots for approval to the relevant planning authority in accordance with requirement 5(3) or requirement 8(1) without first obtaining the written consent of Able in respect of the design and layout of the relevant part of numbered work 2.

130

The undertaker must not submit written details for numbered work 6 so far as it is within plots 6 or 7 for approval to the relevant planning authority in accordance with requirement 5(6) without first obtaining the written consent of Able in respect of the siting, design and layout of the relevant part of numbered work 6.

131
  • (1) The undertaker must not exercise the powers under any of the articles of the Order specified in sub-paragraph (2) over or in respect of the Able Order land otherwise than with the prior written consent of Able.
  • (2) The articles referred to in sub-paragraph (1) are—
  • (a) article 8 (power to alter layout etc. of streets);
  • (b) article 9 (street works);
  • (c) article 10 (construction and maintenance of new or altered means of access);
  • (d) article 11 (temporary prohibition or restriction of use of streets);
  • (e) article 12 (access to works);
  • (f) article 14 (traffic regulation);
  • (g) article 16 (authority to survey and investigate the land);
  • (h) article 18 (compulsory acquisition of land);
  • (i) article 19 (power to override easements and other rights);
  • (j) article 21 (compulsory acquisition of rights etc.);
  • (k) article 22 (private rights);
  • (l) article 26 (rights under or over streets);
  • (m) article 27 (temporary use of land for carrying out the authorised development);
  • (n) article 28 (temporary use of land for maintaining the authorised development); and
  • (o) article 29 (statutory undertakers).
  • (3) In the event that Able withholds its consent pursuant to sub-paragraph (1) it must notify the undertaker in writing of the reasons for withholding such consent and (if applicable) the time period during which such consent will be withheld.
132
  • (1) Wherever in this Part of this Schedule provision is made with respect to the approval or consent of Able, that approval or consent must be in writing (and subject to such reasonable terms and conditions as Able may require), and must not be unreasonably withheld or delayed.
  • (2) In the event that Able does not respond in writing to a request for approval or consent within 28 days of receipt of such a request, Able is deemed to have given its consent, without any terms or conditions.
133
  • (1) Insofar as the construction of the OCGT authorised development is or may be undertaken concurrently with the Able authorised development, the undertaker must—
  • (a) co-operate with Able with a view to ensuring—
  • (i) the co-ordination of construction programming and the carrying out of works; and
  • (ii) that access for the purposes of constructing the respective authorised developments is maintained for the undertaker and Able and their respective contractors; and
  • (b) use reasonable endeavours to avoid any conflict arising from the carrying out of the respective authorised developments.

Arbitration

134

Any difference or dispute arising between the undertaker and Able under this Part of this Schedule will, unless otherwise agreed in writing between the undertaker and Able, be referred to and settled by arbitration in accordance with Article 42 (Arbitration).

PART 9 — FOR THE PROTECTION OF TOTAL LINDSEY OIL REFINERY LIMITED

135

For the protection of Total Lindsey Oil Refinery Limited, the following provisions, unless otherwise agreed in writing between the undertaker and Total Lindsey Oil Refinery Limited, have effect.

136

In this Part of this Schedule—

  • the pipelines” means the pipelines crossing the Order limits owned and operated by TLOR used at various times for the passage of multi-purpose hydrocarbon fuels and all ancillary apparatus including such works and apparatus properly appurtenant to the pipelines as are specified by section 65(2) (meaning of “pipe-line”) of the Pipe-lines Act 1962; and
  • TLOR” means Total Lindsey Oil Refinery Limited (company number 00564599).
137

Before commencing any part of the authorised development which would have an effect on the operation or maintenance of the pipelines and access to them, the undertaker must submit to TLOR plans and sections of the proposed works and such further particulars as TLOR may, within 28 days from the day on which plans and sections are submitted under this paragraph, reasonably require.

138

No works comprising any part of the authorised development which would have an effect on the operation, maintenance or abandonment of the pipelines and access to them are to be commenced until plans and sections in respect of those works submitted under paragraph 137 have been approved by TLOR.

139

Any approval of TLOR required under paragraph 138 must not be unreasonably withheld or delayed but may be given subject to such reasonable requirements as TLOR may require to be made for—

  • (a) the continuing safety and operational viability of the pipelines; and
  • (b) the requirement for TLOR to have uninterrupted and unimpeded access to the pipelines at all times.

PART 10 — FOR THE PROTECTION OF NETWORK RAIL INFRASTRUCTURE LIMITED

140

The following provisions of this Part of this Schedule have effect, unless otherwise agreed in writing between the undertaker and Network Rail.

141

In this Part of this Schedule—

  • Network Rail” means Network Rail Infrastructure Limited (company registration number 02904587) whose registered office is at 1 Eversholt Street, London NW1 2DN and any associated company of Network Rail Infrastructure Limited which holds property for railway purposes, and for the purpose of this definition “associated company” means any company which is (within the meaning of section 1159 (meaning of “subsidiary” etc) of the Companies Act 2006) the holding company of Network Rail Infrastructure Limited, a subsidiary of Network Rail Infrastructure Limited or another subsidiary of the holding company of Network Rail Infrastructure Limited;
  • railway operational procedures” means procedures specified under any access agreement (as defined in the Railways Act 1993 ) or station lease; and
  • railway property” means railway belonging to Network Rail and—any station, land, works, apparatus and equipment belonging to Network Rail or connected with any such railway; andany easement or other property interest held or used by Network Rail for the purposes of such railway or works, apparatus or equipment.
142
  • (1) The undertaker must not exercise the powers conferred by—
  • (a) article 18 (compulsory acquisition of land);
  • (b) article 19 (power to override easements and other rights);
  • (c) article 21 (compulsory acquisition of rights etc.);
  • (d) article 22 (private rights);
  • (e) article 24 (acquisition of subsoil only);
  • (f) article 27 (temporary use of land for carrying out the authorised development);
  • (g) article 28 (temporary use of land for maintaining the authorised development,

in respect of any railway property unless the exercise of such powers is with the consent of Network Rail.

  • (2) The undertaker must not in the exercise of the powers conferred by this Order prevent pedestrian or vehicular access to any railway property, unless preventing such access is with the consent of Network Rail.
  • (3) The undertaker must not exercise the powers conferred by sections 271 (extinguishment of rights of statutory undertakers: preliminary notices) or 272 (extinguishment of rights of electronic communications code operators: preliminary notices) of the 1990 Act, or article 29 (statutory undertakers), in relation to any right of access of Network Rail to railway property, but such right of access may be diverted with the consent of Network Rail.
  • (4) The undertaker must not under the powers of this Order acquire or use or acquire new rights over any railway property except with the consent of Network Rail.
  • (5) Where Network Rail is asked to give its consent pursuant to this paragraph, such consent must not be unreasonably withheld or delayed but may be given subject to reasonable conditions and such consent is subject to the condition that Network Rail complies with any relevant railway operational procedures and any obligations under its network licence or under statute.
143

Any difference or dispute arising between the undertaker and Network Rail under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and Network Rail, be determined by arbitration in accordance with article 42 (arbitration).

144

Nothing in this Order, or in any enactment incorporated with or applied by this Order, prejudices or affects the operation of Part 1 of the Railways Act 1993.

PART 11 — FOR THE PROTECTION OF CADENT GAS LIMITED AS GAS UNDERTAKER

Application

145

For the protection of Cadent the following provisions will, unless otherwise agreed in writing between the undertaker and Cadent, have effect.

Interpretation

146

In this Part of this Schedule—

  • acceptable insurance” means a third party liability insurance effected and maintained by the undertaker and/or its contractor(s) to a level as may be approved by Cadent in writing or in the case of dispute in accordance with the terms and level of cover determined through arbitration under paragraph 158. Such insurance shall be maintained for the maintenance period of any specified works and arranged with an internationally recognised insurer of repute operating in the London and worldwide insurance market underwriters whose security/credit rating meets the same requirements as an “acceptable credit provider”, such policy shall include (but without limitation)—Cadent as a Co-Insured;a cross liabilities clause; andcontractors' pollution liability for third party property damage and third party bodily damage arising from a pollution/contamination event with cover of £10,000,000.00 (ten million pounds) per event or £20,000,000.00 (twenty million pounds) in aggregate; ...
  • alternative apparatus” means appropriate alternative apparatus to the satisfaction of Cadent to enable Cadent to fulfil its statutory functions in a manner no less efficient than previously;
  • apparatus” means any gas mains, pipes, pressure governors, ventilators, cathodic protections, cables or other apparatus belonging to or maintained by Cadent for the purposes of gas distribution together with any replacement apparatus and includes any structure in which apparatus is or will be lodged or which gives or will give access to apparatus;
  • Cadent” means Cadent Gas Limited and/or its successors in title and/or any successor as a gas transporter within the meaning of Part 1 of the Gas Act 1986;
  • deed of consent” means a deed of consent, crossing agreement, deed of variation or new deed of grant agreed between the parties acting reasonably in order to vary and/or replace existing easements, agreements, enactments and other such interests so as to secure land rights and interests as are necessary to carry out, maintain, operate and use the apparatus in a manner consistent with the terms of this Part of this Schedule;
  • functions” includes powers and duties;
  • ground mitigation scheme” means a scheme approved by Cadent (such approval not to be unreasonably withheld or delayed) setting out the mitigation measures (if any) for a ground subsidence event;
  • ground monitoring scheme” means a scheme for monitoring ground subsidence which sets out the apparatus which is to be subject to such monitoring, the extent of land to be monitored, the manner in which ground levels are to be monitored, the timescales of any monitoring activities and the extent of ground subsidence which, if exceeded, shall require the undertaker to submit for Cadent's approval a ground mitigation scheme;
  • ground subsidence event” means any ground subsidence identified by the monitoring activities set out in the ground monitoring scheme that has exceeded the level described in the ground monitoring scheme as requiring a ground mitigation scheme;
  • “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over, across, along or upon such land;
  • “maintain” and “maintenance” shall include the ability and right to do any of the following in relation to any apparatus or alternative apparatus of Cadent including retain, lay, construct, inspect, maintain, protect, use, access, enlarge, replace, renew, remove, decommission or render unusable or remove the apparatus;
  • maintenance activity” means the diversion, replacement, relaying, removal, refurbishment, reconstruction or improvement of the high pressure gas pipeline which supplies gas to the authorised development by the undertaker, or any works which would include the breaking of the ground within 15 metres in any direction of any apparatus;
  • maintenance period” means the period of time from the commencement of the maintenance activity to the completion of the maintenance activity;
  • Order land” has the same meaning as is given to the term “Order land” in article 2 of this Order;
  • “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
  • “rights” shall include rights and restrictive covenants, and in relation to decommissioned apparatus the surrender of rights, release of liabilities and transfer of decommissioned apparatus;
  • specified works” means any intrusive activities undertaken by the undertaker within the Order land pursuant to the powers in article 19 (Power to override easements and other rights), article 21 (Compulsory acquisition of rights etc.), article 22 (Private rights) and article 29 (Statutory undertakers) which—will or may be situated over, or within 15 metres measured in any direction of any apparatus the removal of which has not been required by the undertaker under paragraph 150(2) or otherwise;may in any way adversely affect any apparatus the removal of which has not been required by the undertaker under sub-paragraph 150(2) or otherwise; and/orinclude any of the activities that are referred to in paragraph 8 of T/SP/SSW/22 (Cadent's policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of Cadent High pressure Gas pipelines and associated installation requirements for third parties GD/SP/SSW/22”); and
  • undertaker” means the undertaker as defined in article 2 of this Order.

On Street Apparatus

147
  • (1) Except for paragraphs 148 (apparatus of Cadent in stopped up streets), 150 (removal of apparatus) in so far as sub-paragraph (2) applies, 151 (facilities and rights for alternative apparatus) in so far as sub-paragraph (2) below applies, 152 (retained apparatus: protection of Cadent), 153 (expenses) and 154 (indemnity) of this Schedule which will apply in respect of the exercise of all or any powers under the Order affecting the rights and apparatus of Cadent, the other provisions of this Schedule do not apply to apparatus in respect of which the relations between the undertaker and Cadent are regulated by the provisions of Part 3 of the 1991 Act.
  • (2) Paragraph 150 and 151 of this Schedule shall apply to diversions even where carried out under the 1991 Act, in circumstances where any Apparatus is diverted from an alignment within the existing adopted public highway but not wholly replaced within existing adopted public highway.
  • (3) Notwithstanding article 30 (apparatus and rights of statutory undertakers in streets) or any other powers in the Order generally, section 85 of the 1991 Act in relation to cost sharing and the regulations made thereunder shall not apply in relation to any diversion of apparatus of Cadent under the 1991 Act.

Apparatus of Cadent in stopped up streets

148
  • (1) Notwithstanding the temporary stopping up or diversion of any highway under the powers of article 11 (temporary prohibition or restriction of uses of streets), Cadent will be at liberty at all times to take all necessary access across any such stopped up highway and/or to execute and do all such works and things in, upon or under any such highway as it would have been entitled to do immediately before such temporary stopping up or diversion in respect of any apparatus which at the time of the stopping up or diversion was in that highway.
  • (2) The protective provisions in this Part of this Schedule apply and take precedence over article 30 (apparatus and rights of statutory undertakers in streets) of the Order which shall not apply to Cadent.

Acquisition of land

149
  • (1) Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not appropriate or acquire any land interest or appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or apparatus of Cadent otherwise than by agreement.
  • (2) As a condition of agreement between the parties in sub-paragraph (1), prior to the carrying out of any part of the specified works (or in such other timeframe as may be agreed between Cadent and the undertaker) that are subject to the requirements of this Part of this Schedule that will cause any conflict with or breach the terms of any easement and/or other legal or land interest of Cadent and/or affects the provisions of any enactment or agreement regulating the relations between Cadent and the undertaker in respect of any apparatus laid or erected in land belonging to or secured by the undertaker, the undertaker must as Cadent reasonably requires enter into such deeds of consent and variations upon such terms and conditions as may be agreed between Cadent and the undertaker acting reasonably and which must be no less favourable on the whole to Cadent unless otherwise agreed by Cadent, and the undertaker must use its reasonable endeavours procure and/or secure the consent and entering into of such deeds and variations by all other third parties with an interest in the land at that time who are affected by such specified works.
  • (3) The undertaker and Cadent agree that where there is any inconsistency or duplication between the provisions set out in this Part of this Schedule relating to the relocation and/or removal of apparatus/including but not limited to the payment of costs and expenses relating to such relocation and/or removal of apparatus and the provisions of any existing easement, rights, agreements and licences granted, used, enjoyed or exercised by Cadent and/or other enactments relied upon by Cadent as of right or other use in relation to the apparatus, then the provisions in this Schedule shall prevail.
  • (4) Any agreement or consent granted by Cadent under paragraph 152 or any other paragraph of this Part of this Schedule, shall not be taken to constitute agreement under sub-paragraph (1).

Removal of apparatus

150
  • (1) If, in the exercise of the agreement reached in accordance with paragraph 149 or in any other authorised manner, the undertaker acquires any interest in any land in which any apparatus is placed, that apparatus must not be decommissioned or removed under this Part of this Schedule and any right of Cadent to maintain that apparatus in that land must not be extinguished until alternative apparatus has been constructed, is in operation, and the rights and facilities referred to in sub-paragraph (2) have been provided, to the reasonable satisfaction of Cadent and in accordance with sub-paragraphs (2) to (5) inclusive.
  • (2) If, for the purpose of executing any works in, on, under or over any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, it must give to Cadent advance written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Cadent reasonably needs to move or remove any of its apparatus) the undertaker must afford to Cadent to its satisfaction (taking into account paragraph 152(1) below) the necessary facilities and rights—
  • (a) for the construction of alternative apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Cadent in respect of the apparatus);
  • (b) subsequently for the maintenance of that apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Cadent in respect of the apparatus); and
  • (c) to allow access to that apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Cadent in respect of the apparatus).
  • (3) If the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2), in the land in which the alternative apparatus or part of such apparatus is to be constructed, Cadent may, on receipt of a written notice to that effect from the undertaker, take such steps as are reasonable in the circumstances in an endeavour to assist the undertaker in obtaining the necessary facilities and rights in the land in which the alternative apparatus is to be constructed save that this obligation shall not extend to the requirement for Cadent to use its compulsory purchase powers to this end unless it (in its absolute discretion) elects to so do.
  • (4) Any alternative apparatus to be constructed in land of or land secured by the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Cadent and the undertaker.
  • (5) Cadent must, after the alternative apparatus to be provided or constructed has been agreed, and subject to the prior grant to Cadent of such facilities and rights as are referred to in sub-paragraphs (2) or (3) having been afforded to Cadent to its satisfaction, then proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to decommission or remove any apparatus required by the undertaker to be decommissioned or removed under the provisions of this Part of this Schedule.

Facilities and rights for alternative apparatus

151
  • (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to or secures for Cadent facilities and rights in land for the access to, construction and maintenance of alternative apparatus in substitution for apparatus to be decommissioned or removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Cadent and must be no less favourable on the whole to Cadent than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed unless otherwise agreed by Cadent.
  • (2) If the facilities and rights to be afforded by the undertaker and agreed with Cadent under sub-paragraph (1) above in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are less favourable on the whole to Cadent than the facilities and rights enjoyed by it in respect of the apparatus to be decommissioned or removed (in Cadent's opinion) then the terms and conditions to which those facilities and rights are subject in the matter will be referred to arbitration in accordance with paragraph 158 (Arbitration) of this Part of this Schedule and the arbitrator shall make such provision for the payment of compensation by the undertaker to Cadent as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.

Retained apparatus: protection of Cadent

152
  • (1) Not less than 56 days before the commencement of any specified works the undertaker must submit to Cadent a plan and, if reasonably required by Cadent, a ground monitoring scheme in respect of those works.
  • (2) The plan to be submitted to Cadent under sub-paragraph (1) must include a method statement and describe—
  • (a) the exact position of the works;
  • (b) the level at which these are proposed to be constructed or renewed;
  • (c) the manner of their construction or renewal including details of excavation, positioning of plant etc.;
  • (d) the position of all apparatus;
  • (e) by way of detailed drawings, every alteration proposed to be made to or close to any such apparatus; and
  • (f) any intended maintenance regimes.
  • (3) The undertaker must not commence any works to which sub-paragraphs (1) and (2) apply until Cadent has given written approval of the plan so submitted.
  • (4) Any approval of Cadent required under sub-paragraph (3)—
  • (a) may be given subject to reasonable conditions for any purpose mentioned in sub-paragraphs (5) or (7); and
  • (b) must not be unreasonably withheld.
  • (5) In relation to any work to which sub-paragraphs (1) and/or (2) apply, Cadent may require such modifications to be made to the plans as may be reasonably necessary for the purpose of securing apparatus against interference or risk of damage or for the purpose of providing or securing proper and convenient means of access to any apparatus.
  • (6) Works to which this paragraph applies must only be executed in accordance with the plan, submitted under sub-paragraph (1) and (2) or as relevant sub-paragraph (4), as approved or as amended from time to time by agreement between the undertaker and Cadent and in accordance with all conditions imposed under sub-paragraph (4)(a), and Cadent will be entitled to watch and inspect the execution of those works.
  • (7) Where Cadent requires any protective works to be carried out by itself or by the undertaker (whether of a temporary or permanent nature) such protective works, inclusive of any measures or schemes required and approved as part of the plan approved pursuant to this paragraph, must be carried out to Cadent's satisfaction prior to the commencement of any specified works (or any relevant part thereof) for which protective works are required prior to commencement.
  • (8) If Cadent, in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 145 to 147 and 150 to 151 apply as if the removal of the apparatus had been required by the undertaker under sub-paragraph 150(2).
  • (9) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 56 days before commencing the execution of the specified works, a new plan, instead of the plan previously submitted, and having done so the provisions of this paragraph will apply to and in respect of the new plan.
  • (10) The undertaker will not be required to comply with sub-paragraph (1) where it needs to carry out emergency works as defined in the 1991 Act but in that case it must give to Cadent notice as soon as is reasonably practicable and a plan of those works and must comply with—
  • (a) the conditions imposed under sub-paragraph (4)(a) insofar as is reasonably practicable in the circumstances; and
  • (b) sub-paragraph (11) at all times.
  • (11) At all times when carrying out any specified works the undertaker must comply with Cadent's policies for safe working in proximity to gas apparatus “Specification for safe working in the vicinity of Cadent High pressure Gas pipelines and associated installation requirements for third parties SPGD/SP /SSW22” and HSE's “HS(~G)47 Avoiding Danger from underground services”.
  • (12) As soon as reasonably practicable after any ground subsidence event attributable to any specified works the undertaker shall implement an appropriate ground mitigation scheme save that Cadent retains the right to carry out any further necessary protective works for the safeguarding of its apparatus and can recover any such costs in line with paragraph 153.

Expenses

153
  • (1) Subject to the following provisions of this paragraph, the undertaker must pay to Cadent on demand all charges, costs and expenses reasonably anticipated or incurred by Cadent in, or in connection with, the inspection, removal, relaying or replacing, alteration or protection of any apparatus or rights or the construction of any new or alternative apparatus which may be required in consequence of the execution of any specified works including without limitation—
  • (a) any costs reasonably incurred by or compensation properly paid by Cadent in connection with the negotiation or acquisition of rights or the exercise of statutory powers for such apparatus including without limitation all costs (including professional fees) incurred by Cadent as a consequence of Cadent;
  • (i) using its own compulsory purchase powers to acquire any necessary rights under paragraph 150(3) if it elects to do so; and/or
  • (ii) exercising any compulsory purchase powers in the Order transferred to or benefitting Cadent;
  • (b) in connection with the cost of the carrying out of any diversion work or the provision of any alternative apparatus;
  • (c) the cutting off of any apparatus from any other apparatus or the making safe of redundant apparatus;
  • (d) the approval of plans;
  • (e) the carrying out of protective works, plus a capitalised sum to cover the cost of maintaining and renewing permanent protective works;
  • (f) the survey of any land, apparatus or works, the inspection and monitoring of works or the installation or removal of any temporary works reasonably necessary in consequence of the execution of any specified works;
  • (g) any watching brief pursuant to paragraph 152(6).
  • (2) There will be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule and which is not re-used as part of the alternative apparatus, that value being calculated after removal.
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was situated,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with article 42 (arbitration) to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Cadent by virtue of sub-paragraph (1) will be reduced by the amount of that excess save where it is not possible or appropriate in the circumstances (including due to statutory or regulatory changes) to obtain the existing type of apparatus at the same capacity and dimensions or place at the existing depth in which case full costs will be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus will not be treated as a placing of apparatus of greater dimensions than those of the existing apparatus; and
  • (b) where the provision of a joint in a pipe or cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole will be treated as if it also had been agreed or had been so determined.

Indemnity

154
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of any specified works authorised by this Part of this Schedule (including without limitation relocation, diversion, decommissioning, construction and maintenance of apparatus or alternative apparatus) or in consequence of the construction, use, maintenance or failure of any of the specified works by or on behalf of the undertaker or in consequence of any act or default of the undertaker (or any person employed or authorised by him) in the course of carrying out such specified works, including without limitation works carried out by the undertaker under this Part of this Schedule or any subsidence resulting from any of these works, any damage is caused to any apparatus or alternative apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of the specified works) or property of Cadent, or there is any interruption in any service provided, or in the supply of any goods, by Cadent, or Cadent becomes liable to pay any amount to any third party, the undertaker will—
  • (a) bear and pay on demand the cost reasonably incurred by Cadent in making good such damage or restoring the supply; and
  • (b) indemnify Cadent for any other expenses, loss, demands, proceedings, damages, claims, penalty or costs incurred by or recovered from Cadent, by reason or in consequence of any such damage or interruption or Cadent becoming liable to any third party as aforesaid other than arising from any default of Cadent.
  • (2) The fact that any act or thing may have been done by Cadent on behalf of the undertaker or in accordance with a plan approved by Cadent or in accordance with any requirement of Cadent or under its supervision including under any watching brief will not (unless sub-paragraph (3) applies) excuse the undertaker from liability under the provisions of this sub-paragraph (1) unless Cadent fails to carry out and execute the works properly with due care and attention and in a skilful and workman like manner or in a manner that does not accord with the approved plan.
  • (3) Nothing in sub-paragraph (1) shall impose any liability on the undertaker in respect of—
  • (a) any damage or interruption to the extent that it is attributable to the neglect or default of Cadent, its officers, servants, contractors or agents; and
  • (b) any specified works carried out by Cadent as an assignee, transferee or lessee of the undertaker with the benefit of the Order pursuant to section 156 of the Planning Act 2008 or article 7 (consent to transfer benefit of order) subject to the proviso that once such works become apparatus (“new apparatus”), any specified works yet to be executed and not falling within this sub-section (3)(b) will be subject to the full terms of this Part of this Schedule including this paragraph 154.
  • (4) Cadent must give the undertaker reasonable notice of any such third party claim or demand and no settlement admission of liability or compromise must, unless payment is required in connection with a statutory compensation scheme, be made without first consulting the undertaker and considering their representations.
  • (5) Cadent must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands, and penalties to which the indemnity under this paragraph applies and if reasonably requested to do so by the undertaker Cadent must provide an explanation of how the claim has been minimised.
  • (6) The undertaker must not commence any maintenance activity (and must not permit the commencement of such maintenance activity) unless and until Cadent is satisfied acting reasonably (but subject to all necessary regulatory constraints) that the undertaker or its contractor has procured acceptable insurance (and provided evidence to Cadent that it shall maintain such acceptable insurance for the maintenance period) and Cadent has confirmed the same in writing to the undertaker.
  • (7) In the event that the undertaker fails to comply with sub-paragraph (6), nothing in this Part of this Schedule shall prevent Cadent from seeking injunctive relief (or any other equitable remedy) in any court of competent jurisdiction.
  • (8) The undertaker is not required to comply with sub-paragraph (6) where it needs to carry out emergency works as defined in the 1991 Act.

Enactments and agreements

155

Save to the extent provided for to the contrary elsewhere in this Part of this Schedule or by agreement in writing between Cadent and the undertaker, nothing in this Part of this Schedule shall affect the provisions of any enactment or agreement regulating the relations between the undertaker and Cadent in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

Co-operation

156
  • (1) Where in consequence of the specified works, the undertaker or Cadent requires the removal of apparatus under paragraph 150(2) or Cadent makes requirements for the protection or alteration of apparatus under paragraph 152, the undertaker shall use its best endeavours to co-ordinate the execution of the works in the interests of safety and the efficient and economic execution of the specified works and taking into account the need to ensure the safe and efficient operation of Cadent's undertaking and Cadent shall use its best endeavours to co-operate with the undertaker for that purpose.
  • (2) For the avoidance of doubt whenever Cadent's consent, agreement or approval is required in relation to plans, documents or other information submitted by the undertaker or the taking of action by the undertaker, it must not be unreasonably withheld or delayed.

Access

157

If in consequence of the agreement reached in accordance with paragraph 149(1) or the powers granted under this Order the access to any apparatus (including appropriate working areas required to reasonably and safely undertake necessary works by Cadent in respect of the apparatus) is materially obstructed, the undertaker must provide such alternative rights and means of access to such apparatus as will enable Cadent to maintain or use the apparatus no less effectively than was possible before such obstruction.

Arbitration

158

Any difference or dispute arising between the undertaker and Cadent under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and Cadent, be determined by arbitration in accordance with article 42 (arbitration).

Notices

159

The plans submitted to Cadent by the undertaker pursuant to paragraph 152(1) must be sent to Cadent Gas Limited Plant Protection at plantprotection@cadentgas.com or such other address as Cadent may from time to time appoint instead for that purpose and notify to the undertaker.

PART 12 — FOR THE PROTECTION OF HIGHWAYS ENGLAND COMPANY LIMITED

Application

160

For the protection of Highways England Company Limited (Company No. 04346363) as referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and Highways England.

Interpretation

161

In this Part of this Schedule—

  • the contractor” means any contractor or sub-contractor appointed by the undertaker to construct the HE works;
  • the detailed design information” means details of the following where applicable to the HE works—site clearance details;boundary and mitigation fencing;road restraints systems and supporting road restraint risk appraisal process assessment;drainage and ducting and supporting drainage calculations;earthworks including supporting geotechnical assessments and any required strengthened earthworks appraisal form certification;kerbs, footways and paved areas;traffic signs and road markings;traffic signal equipment and associated signal phasing and timing detail;road lighting (including columns and brackets) and supporting lighting calculations;electrical work for road lighting, traffic signs and signals;highway structures and any required structural approval in principle;landscaping;proposed departures from DMRB requirements;utilities diversions;topographical survey;site waste management plan;maintenance and repair strategy in accordance with Designing for Maintenance Interim Advice Note 69/15 or any replacement or modification of it;asbestos survey;regime of core testing and sampling of existing trunk road pavement construction;site investigation survey;health and safety information; andother such information used to inform the detailed design of the HE works that may be required by Highways England;
  • DMRB” means the Design Manual for Roads and Bridges or any replacement or modification of it;
  • the estimated costs” means the estimated costs in respect of any HE works agreed pursuant to paragraph 164 of this Part of this Schedule;
  • the Existing Gas Pipeline” means the existing gas pipeline the location of which is shown shaded blue within the Order Land but outside the Order Limits as shown on ... the Land Plans;
  • the HE works” means any works carried out by the undertaker on the strategic road network ... to maintain, alter, inspect, repair, renew, replace, decommission or remove in whole or in part the Existing Gas Pipeline;
  • Highways England” means the Highways England Company Limited with company number 04346363 and whose registered office is at Bridge House, 1 Walnut Tree Close, Guildford, Surrey GU1 4LZ;
  • the nominated persons” means the undertaker's representatives or the contractor's representatives on site during construction of the HE works, as notified to Highways England from time to time;
  • the programme of works” means a document setting out the sequence and timetabling of the HE works; and
  • utilities” means any pipes, wires, cables or other equipment belonging to any person or body having power or consent to undertake street works under the 1991 Act.

Prior approvals

162
  • (1) The HE works must not commence until—
  • (a) the detailed design of the HE works comprising of the following details has been submitted to and approved by Highways England—
  • (i) the detailed design information;
  • (ii) the programme of works;
  • (iii) details of proposed road space bookings;
  • (iv) a scheme of traffic management; and
  • (v) the identity of the contractor and nominated persons;
  • (b) all necessary temporary traffic regulation measures have been made by the undertaker under article 11(1) or 14(3), or all necessary temporary traffic regulation orders have been made by Highways England;
  • (c) at least 28 days' notice of the commencement date of the HE works has been given to Highways England in writing, unless otherwise agreed by Highways England.
  • (2) Highways England must use its best endeavours to notify the undertaker of its approval or, as the case may be, of its disapproval and the grounds of disapproval, within 42 days of the information required by sub-paragraphs (1)(a)(i) to (1)(a)(v) being received by Highways England. Highways England must give reasons for any disapproval and shall not unreasonably delay its approval to the undertaker.
  • (3) In the event of any disapproval, the undertaker may re-submit the information required by sub-paragraphs (1)(a)(i) to (1)(a)(v) with modifications and Highways England must use its best endeavours to notify the undertaker of its approval or, as the case may be, of its disapproval and the grounds of disapproval, within 42 days of the revised detailed design information being received by Highways England. Highways England must give reasons for any further disapproval and must not unreasonably withhold or delay consent.
  • (4) The documents and programmes approved under sub-paragraphs (1) and (2) may be subsequently amended by agreement between the undertaker and Highways England from time to time, both parties acting reasonably and without delay.
  • (5) Within 28 days of receipt of a written request by the undertaker and in any event prior to the commencement of the HE works, Highways England must inform the undertaker of the identity of the person who will act as the point of contact on behalf of Highways England for consideration of the information required under sub-paragraph (1).

Construction of the HE works

163
  • (1) The HE works must be constructed to the satisfaction of Highways England acting reasonably and in accordance (where relevant) with—
  • (a) the information approved under paragraph 162(1) or as subsequently varied by agreement between the undertaker and Highways England;
  • (b) the DMRB and the Specification for Highway Works (contained within the Manual of Contract Documents for Highways Works) together with all other relevant standards as required by Highways England (to include all relevant interim advice notes, the Traffic Signs Manual 2008 and any amendment to or replacement of such standards for the time being in force), save to the extent that exceptions to those standards apply which have been approved by Highways England under paragraph 162(1) in respect of the HE works;
  • (c) the Traffic Signs Regulations and General Directions 2016 or any amendment to or replacement of them; and
  • (d) all aspects of the Construction (Design and Management) Regulations 2015 or any amendment to or replacement of them.
  • (2) The undertaker must permit and must require the contractor to permit at all reasonable times persons authorised by Highways England (whose identity must have been previously notified to the undertaker and the contractor by Highways England) to gain access to the HE works for the purposes of inspection and supervision of the HE works.
  • (3) The undertaker must permit and must require the contractor to act upon any reasonable request made by Highways England in relation to the construction of the HE works as soon as reasonably practicable provided such a request is not inconsistent with and does not fall outside the contractor's obligations under its contract with the undertaker or the undertaker's obligations under this Order.
  • (4) If any part of the HE works is constructed otherwise than in accordance with the requirements of this Part of this Schedule, Highways England may by notice in writing require the undertaker, at the undertaker's own expense, to comply with the requirements of this Part of this Schedule.
  • (5) If within 28 days of the date on which a notice under sub-paragraph (4) is served on the undertaker, the undertaker has failed to take the steps required by that notice. Highways England may carry out works to reinstate the highway and other land and premises of Highways England, and Highways England may recover from the undertaker any expenditure reasonably incurred by it in so doing.
  • (6) If during construction of the HE works the undertaker causes any damage to the strategic road network then Highways England may by notice in writing require the undertaker, at the undertaker's own expense, to remedy the damage.
  • (7) If within 28 days of the date on which a notice under sub-paragraph (6) is served on the undertaker, the undertaker has failed to take steps to comply with the notice. Highways England may carry out the steps required of the undertaker and may recover from the undertaker any expenditure reasonably incurred by Highways England in so doing.
  • (8) Nothing in this Part of this Schedule prevents Highways England from carrying out any work or taking such action as it reasonably believes to be necessary as a result of the construction of the HE works without prior notice to the undertaker in the event of an emergency or to prevent the occurrence of danger to the public and Highways England may recover from the undertaker any reasonable expenditure incurred by Highways England in so doing.
  • (9) In constructing the HE works, the undertaker must at its own expense divert or protect all utilities and all agreed alterations and reinstatement of highway over existing utilities must be constructed to the reasonable satisfaction of Highways England.

Payments

164
  • (1) The undertaker must fund the full cost of the HE works and any incidental and amended works approved under this Part of this Schedule and must also pay to Highways England in respect of the HE works a sum equal to the whole of any costs and expenses which Highways England reasonably incurs (including costs and expenses for using internal or external staff) in relation to—
  • (a) the checking and approval of the information required by paragraph 162(1)(a);
  • (b) the supervision of the HE works;
  • (c) all legal and administrative costs in relation to sub-paragraphs (a) and (b) above;
  • (d) any costs incurred by Highways England in undertaking any necessary statutory procedure required as a result of construction of the HE works, and in preparing and bringing into force any traffic regulation order necessary to construct or implement the HE works, provided that this paragraph will not apply to the making of any orders which duplicate traffic regulation measures contained in, or which may be made by the undertaker under, this Order; and
  • (e) any value added tax which is payable by Highways England in respect of the costs incurred pursuant to paragraphs (a) to (d) which Highways England cannot otherwise recover from HM Revenue and Customs,

sub-paragraphs (a) to (e) together comprising “the estimated costs”.

  • (2) The undertaker and Highways England must, acting reasonably, agree a schedule of the estimated costs prior to the commencement of the HE works and once that schedule is agreed the undertaker must pay to Highways England the estimated costs in line with the agreed schedule.
  • (3) Highways England is not entitled to costs or expenses incurred under any limb of sub-paragraph (1) if those costs or expenses are included as part of the estimated costs under any other limb of that sub-paragraph.

Indemnity

165
  • (1) Subject to sub-paragraphs (2) and (3) the undertaker must in relation to the construction of the HE works indemnify Highways England from and against all costs, expenses, damages, losses and liabilities arising from any claim, demand, action or proceedings resulting from damage caused by the construction of the HE works.
  • (2) Sub-paragraph (1) does not apply if the costs, expenses, damages, losses and liabilities were caused by or arise out of the act, neglect or default of Highways England or its officers, servants, agents, contractors or any person or body for whom it is responsible.
  • (3) In no circumstances is the undertaker liable to Highways England under this Part of this Schedule for any indirect or consequential loss or loss of profits.
  • (4) If any person makes a claim or notifies an intention to make a claim against Highways England which may reasonably be considered likely to give rise to a liability under this paragraph then Highways England must—
  • (a) as soon as reasonably practicable give the undertaker reasonable notice of any such third party claim or demand, specifying the nature of the indemnity liability in reasonable detail;
  • (b) not make any admission of liability, agreement or compromise in relation to the indemnity liability without first consulting the undertaker and considering their representations.
  • (5) The undertaker acknowledges that Highways England may receive statutory compensation claims and that Highways England may not be able to comply with sub-paragraph (4) above in respect of such claims.
  • (6) Where Highways England considers that sub-paragraph (5) applies to any claim or demand it must give notice of that view as part of the relevant notice provided pursuant to sub-paragraph (4)(a) above.
  • (7) Highways England must use its reasonable endeavours to mitigate in whole or in part and to minimise any costs, expenses, loss, demands and penalties to which the indemnity under this paragraph applies where it is within Highways England's reasonable gift and control to do so and which expressly excludes any obligation to mitigate liability arising from third parties which is outside of Highways England's control. If reasonably requested to do so by the undertaker, Highways England must provide an explanation of how any claim has been mitigated or minimised or where mitigation or minimisation is not possible an explanation as to why.

Arbitration

166

Any difference or dispute arising between the undertaker and Highways England under this Part of this Schedule must, unless otherwise agreed in writing between the undertaker and Highways England, be determined by arbitration in accordance with article 42 (arbitration).

Notices

167

A notice or other document required to be served on Highways England under this Part of the Schedule must be served by post to Antony Firth, Head of Planning and Development, Operations, Yorkshire and the North East Region, Highways England, Lateral, 8 City Walk, Leeds, LS11 9AT or such other postal address which Highways England may from time to time notify to the undertaker.

PART 13 — FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC

168

For the protection of Northern Powergrid the following provisions have effect, unless otherwise agreed in writing between the undertaker and Northern Powergrid.

169

In this Part of this Schedule—

  • alternative apparatus” means alternative apparatus adequate to enable Northern Powergrid to fulfil its statutory functions in a manner not less efficient than previously;
  • apparatus” means electric lines or electrical plant (as defined in the Electricity Act 1989), belonging to or maintained by Northern Powergrid;
  • functions” includes powers and duties;
  • “in”, in a context referring to apparatus or alternative apparatus in land, includes a reference to apparatus or alternative apparatus under, over or upon land; and
  • Northern Powergrid” means Northern Powergrid (Yorkshire) Plc (company number 04112320) whose registered office is at Lloyds Court, 78 Grey Street, Newcastle Upon Tyne, NE1 6AF.
170

This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and Northern Powergrid are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.

171

Regardless of the temporary prohibition or restriction of use of streets under the powers conferred by article 11 (temporary prohibition or restriction of use of streets ), Northern Powergrid is at entitled at all times to take all necessary access across any such street and to execute and do all such works and things in, upon or under any such street as may be reasonably necessary or desirable to enable it to maintain any apparatus which at the time of the prohibition or restriction was in that street.

172

Regardless of any provision in this Order or anything shown on the land plans, the undertaker must not acquire any apparatus otherwise than by agreement.

173
  • (1) If, in the exercise of the powers conferred by this Order, the undertaker acquires any interest in any land in which any apparatus is placed or over which access to any apparatus is enjoyed or requires that Northern Powergrid's apparatus is relocated or diverted, that apparatus must not be removed under this Part of this Schedule, and any right of Northern Powergrid to maintain that apparatus in that land and to gain access to it must not be extinguished, until alternative apparatus has been constructed and is in operation, and access to it has been provided by virtue of an easement for a tenure no less than exists in relation to the apparatus being relocated or diverted, all to the reasonable satisfaction of Northern Powergrid in accordance with sub-paragraphs (2) to (7).
  • (2) If, for the purpose of executing any works in, on or under any land purchased, held, appropriated or used under this Order, the undertaker requires the removal of any apparatus placed in that land, the undertaker must give Northern Powergrid written notice of that requirement, together with a plan and section of the work proposed, and of the proposed position of the alternative apparatus to be provided or constructed and in that case (or if in consequence of the exercise of any of the powers conferred by this Order Northern Powergrid reasonably needs to remove any of its apparatus) the undertaker must, subject to sub-paragraph (3), afford to Northern Powergrid the necessary facilities and rights for the construction of alternative apparatus in other land of the undertaker and subsequently for the maintenance of that apparatus.
  • (3) If alternative apparatus or any part of such apparatus is to be constructed elsewhere than in other land of the undertaker, or the undertaker is unable to afford such facilities and rights as are mentioned in sub-paragraph (2) in the land in which the alternative apparatus or part of such apparatus is to be constructed, Northern Powergrid must, on receipt of a written notice to that effect from the undertaker, as soon as reasonably practicable and at the cost of the undertaker (subject to prior approval by the undertaker of its estimate of costs of doing so) use reasonable endeavours to obtain the necessary facilities and rights in the land in which the alternative apparatus is to be constructed.
  • (4) Any alternative apparatus to be constructed in land of the undertaker under this Part of this Schedule must be constructed in such manner and in such line or situation as may be agreed between Northern Powergrid and the undertaker or in default of agreement settled by arbitration in accordance with paragraph 185.
  • (5) Northern Powergrid must, after the alternative apparatus to be provided or constructed has been agreed or settled by arbitration in accordance with paragraph 185, and after the grant to Northern Powergrid of any such facilities and rights as are referred to in sub-paragraph (2) or (3) proceed without unnecessary delay to construct and bring into operation the alternative apparatus and subsequently to remove any apparatus required by the undertaker to be removed under the provisions of this Part of this Schedule.
  • (6) Regardless of anything in sub-paragraph (5), if the undertaker gives notice in writing to Northern Powergrid that it desires itself to execute any work, or part of any work, in connection with the construction or removal of apparatus in any land controlled by the undertaker, that work, instead of being executed by Northern Powergrid, must be executed by the undertaker without unnecessary delay under the superintendence, if given, and to the reasonable satisfaction of Northern Powergrid.
  • (7) Nothing in sub-paragraph (6) authorises the undertaker to place, install, bed, pack, remove, connect or disconnect any apparatus, or any fill around the apparatus (where the apparatus is laid in a trench) within 300 millimetres of the apparatus.
174
  • (1) Where, in accordance with the provisions of this Part of this Schedule, the undertaker affords to Northern Powergrid facilities and rights for the construction and maintenance in land of the undertaker of alternative apparatus in substitution for apparatus to be removed, those facilities and rights must be granted upon such terms and conditions as may be agreed between the undertaker and Northern Powergrid or in default of agreement settled by arbitration in accordance with paragraph 185.
  • (2) If the facilities and rights to be afforded by the undertaker in respect of any alternative apparatus, and the terms and conditions subject to which those facilities and rights are to be granted, are in the opinion of the arbitrator less favourable on the whole to Northern Powergrid than the facilities and rights enjoyed by it in respect of the apparatus to be removed and the terms and conditions to which those facilities and rights are subject, the arbitrator must make such provision for the payment of compensation by the undertaker to Northern Powergrid as appears to the arbitrator to be reasonable having regard to all the circumstances of the particular case.
175
  • (1) Not less than 90 days before starting the execution of any works in, on or under any land purchased, held, appropriated or used under this Order that are near to, or will or may affect, any apparatus the removal of which has not been required by the undertaker under paragraph 173(2), the undertaker must submit to Northern Powergrid a plan, section and description of the works to be executed.
  • (2) Those works must be executed only in accordance with the plan, section and description submitted under sub-paragraph (1) and in accordance with such reasonable requirements as may be made in accordance with sub-paragraph (3) by Northern Powergrid for the alteration or otherwise for the protection of the apparatus, or for securing access to it, and Northern Powergrid is entitled to watch and inspect the execution of those works.
  • (3) Any requirements made by Northern Powergrid under sub-paragraph (2) must be made within a period of 21 days beginning with the date on which a plan, section and description under sub-paragraph (1) are submitted to it.
  • (4) If Northern Powergrid in accordance with sub-paragraph (3) and in consequence of the works proposed by the undertaker, reasonably requires the removal of any apparatus and gives written notice to the undertaker of that requirement, paragraphs 168 to 174 apply as if the removal of the apparatus had been required by the undertaker under paragraph 173(2).
  • (5) Nothing in this paragraph precludes the undertaker from submitting at any time or from time to time, but in no case less than 28 days before commencing the execution of any works, a new plan, section and description instead of the plan, section and description previously submitted, and having done so the provisions of this paragraph apply to and in respect of the new plan, section and description.
  • (6) The undertaker is not required to comply with sub-paragraph (1) in a case of emergency but in that case it must give to Northern Powergrid notice as soon as is reasonably practicable and subsequently a plan, section and description of those works as soon as reasonably practicable and must comply with sub-paragraph (2) in so far as is reasonably practicable in the circumstances.
176
  • (1) Subject to the following provisions of this paragraph, the undertaker must repay to Northern Powergrid the reasonable expenses incurred by Northern Powergrid—
  • (a) in, or in connection with, the inspection, removal, alteration or protection of any apparatus or the construction of any new apparatus which may be required in consequence of the execution of any such works as are referred to in paragraph 173(2);and
  • (b) in assessing and preparing a design for its apparatus to address and accommodate the proposals of the undertaker whether or not the undertaker proceeds to implement those proposals or alternative or none at all,

provided that if it so prefers Northern Powergrid may abandon apparatus that the undertaker does not seek to remove in accordance with paragraph 173(2) having first decommissioned such apparatus.

  • (2) There is to be deducted from any sum payable under sub-paragraph (1) the value of any apparatus removed under the provisions of this Part of this Schedule, that value being calculated after removal and, if the apparatus removed under the provisions of this Part of this Schedule has no value, no sum is to be deducted from the amount payable under sub-paragraph (1).
  • (3) If in accordance with the provisions of this Part of this Schedule—
  • (a) apparatus of better type, of greater capacity or of greater dimensions is placed in substitution for existing apparatus of worse type, of smaller capacity or of smaller dimensions; or
  • (b) apparatus (whether existing apparatus or apparatus substituted for existing apparatus) is placed at a depth greater than the depth at which the existing apparatus was,

and the placing of apparatus of that type or capacity or of those dimensions or the placing of apparatus at that depth, as the case may be, is not agreed by the undertaker or, in default of agreement, is not determined by arbitration in accordance with paragraph 185 to be necessary, then, if such placing involves cost in the construction of works under this Part of this Schedule exceeding that which would have been involved if the apparatus placed had been of the existing type, capacity or dimensions, or at the existing depth, as the case may be, the amount which apart from this sub-paragraph would be payable to Northern Powergrid by virtue of sub-paragraph (1) is to be reduced by the amount of that excess save where it is not possible in the circumstances to obtain the existing type capacity or dimensions of apparatus or to lay it at the same depth as the existing apparatus being replaced in which case the full costs are to be borne by the undertaker.

  • (4) For the purposes of sub-paragraph (3)—
  • (a) an extension of apparatus to a length greater than the length of existing apparatus is not to be treated as a placing of apparatus of greater dimensions than those of the existing apparatus where such extension is required in consequence of the execution of any such works as are referred to in paragraph 173(2); and
  • (b) where the provision of a joint in a cable is agreed, or is determined to be necessary, the consequential provision of a jointing chamber or of a manhole is to be treated as if it also had been agreed or had been so determined.
  • (5) An amount which apart from this sub-paragraph would be payable to Northern Powergrid in respect of works by virtue of sub-paragraph (1) is to be reduced by the amount which represents that benefit if the works include the placing of apparatus provided in substitution for apparatus placed more than seven years and six months earlier so as to confer on Northern Powergrid any financial benefit by deferment of the time for renewal of the apparatus in the ordinary course....
177
  • (1) Subject to sub-paragraphs (2) and (3), if by reason or in consequence of the construction of any of the works referred to in paragraph 173(2), any damage is caused to any apparatus (other than apparatus the repair of which is not reasonably necessary in view of its intended removal for the purposes of those works) or property of Northern Powergrid, or there is any interruption in any service provided by Northern Powergrid, the undertaker must—
  • (a) bear and pay the cost reasonably incurred by Northern Powergrid in making good such damage or restoring the supply; and
  • (b) make reasonable compensation to Northern Powergrid for any other expenses, loss, damages, penalty or costs incurred by Northern Powergrid,

by reason or in consequence of any such damage or interruption.

  • (2) Nothing in sub-paragraph (1) imposes any liability on the undertaker with respect to any damage or interruption to the extent that it is attributable to the act, neglect or default of Northern Powergrid, its officers, servants, contractors or agents.
  • (3) Northern Powergrid must give the undertaker reasonable notice of any such claim or demand and no settlement or compromise is to be made without the consent of the undertaker which, if it withholds such consent, has the sole conduct of any settlement or compromise or of any proceedings necessary to resist the claim or demand.
178

Nothing in this Part of this Schedule affects any enactment or agreement regulating the relations between the undertaker and Northern Powergrid in respect of any apparatus laid or erected in land belonging to the undertaker on the date on which this Order is made.

179
  • (1) Without prejudice to the generality of this Part of this Schedule, Northern Powergrid must from time to time submit to the undertaker estimates of reasonable costs and expenses it expects to incur in relation to the implementation of any diversions or relocation of apparatus contemplated under this Part of this Schedule including without limitation—
  • (a) in assessing and preparing a design for its apparatus to address and accommodate the proposals of the undertaker under paragraph 176;
  • (b) costs incurred in fulfilling its obligations in paragraph 173(3);
  • (c) fees incurred in settling and completing and registering any documentation to secure rights for its diverted or relocated apparatus; and
  • (d) costs and expenses of contractors required to undertake any works for which Northern Powergrid is responsible and of purchasing the necessary cabling and associated apparatus,

provided that Northern Powergrid must use reasonable endeavours to minimise to a proper and reasonable level any charges, costs, fees and expenses to the extent that they are incurred.

180

Northern Powergrid and the undertaker must use their reasonable endeavours to agree the amount of any estimates submitted by Northern Powergrid under paragraph 179 within 15 working days following receipt of such estimates by the undertaker. The undertaker must confirm whether it agrees to the amount of such estimates in writing and must not unreasonably withhold or delay such agreement. If the parties are unable to agree the amount of an estimate, the dispute must be dealt with in accordance with paragraph 185.

181

Work in relation to which an estimate is submitted must not be commenced by Northern Powergrid until that estimate is agreed with the undertaker in writing and a purchase order up to the value of the approved estimate has been issued by the undertaker to Northern Powergrid and an easement for the routes of the apparatus has been granted to Northern Powergrid under paragraph 173(1) for the benefit of its statutory undertaking.

182

If Northern Powergrid at any time becomes aware that an estimate agreed is likely to be exceeded, it must forthwith notify the undertaker and must submit a revised estimate of the relevant costs and expenses to the undertaker for agreement.

183

Northern Powergrid may from time to time, and at least monthly, from the date of this Order issue to the undertaker invoices for costs and expenses incurred up to the date of the relevant invoice, for the amount of the relevant estimate agreed. Invoices issued to the undertaker for payment must—

  • (a) specify the approved purchase order number; and
  • (b) be supported by timesheets and narratives that demonstrate that the work invoiced has been completed in accordance with the agreed estimate.
184

The undertaker is not responsible for meeting costs or expenses in excess of an agreed estimate, other than where agreed under paragraph 181 or determined in accordance with paragraph 185.

185

Any difference under the provisions of this Part of this Schedule, unless otherwise provided for, is to be referred to and settled by a single arbitrator to be agreed between the parties or, failing agreement, to be appointed on the application of either party (after giving notice in writing to the other) by an independent electrical engineer by or on behalf of the President for the time being of the Institute of Engineering and Technology.

PART 14 — FOR THE PROTECTION OF HORNSEA 1 LIMITED

186

For the protection of Hornsea 1 referred to in this Part of this Schedule the following provisions shall, unless otherwise agreed in writing between the undertaker and Hornsea 1, have effect.

187

In this Part of this Schedule—

  • Hornsea 1” means Hornsea 1 Limited (registered number 07640868) and in substitution therefor their successors to Hornsea 1 Limited's interests and/or the Hornsea 1 apparatus;
  • Hornsea 1 apparatus” means any conduit cables ducts pipes or other apparatus or equipment belonging to or maintained by Hornsea 1 for the purposes of the transmission of electricity and includes any structure in which such apparatus is lodged and where such apparatus is or is to be maintained within plots 59, 60, 61, 62, 63, 64, 68, 69, 70, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 90, 91, and 92;
  • Hornsea 1 Limited's interests” means any interest or right held by Hornsea 1 or which Hornsea 1 has the right or power to obtain within plots 59, 60, 61, 62, 63, 64, 68, 69, 70, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 90, 91, and 92;
  • “in” in a context referring to rights, interests or apparatus in land includes a reference to under, over, across, along or upon such land;
  • “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
  • protected area” means the area within 20 metres in all directions of each point from the Hornsea 1 apparatus or Hornsea 1 interests; and
  • works” means any future works undertaken by or on behalf of the undertaker to install, maintain, alter, inspect, repair, renew, decommission or remove in whole or in part land or apparatus in the protected area.

Acquisition of land

188

Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not appropriate or acquire or take temporary possession of any land interest or appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or cables of Hornsea 1 other than by agreement, such agreement not to be unreasonably withheld.

Protection of Hornsea 1 from works

189
  • (1) Before any works are commenced the undertaker must submit to Hornsea 1 plans and sections of the proposed works and such further particulars as Hornsea 1 may, within 14 days from the day on which plans and sections are submitted under this paragraph, reasonably require.
  • (2) The undertaker must not commence any works to which sub-paragraph (1) applies until Hornsea 1 has given written approval of the plan so submitted.
  • (3) Any approval of Hornsea 1 required under sub-paragraph (2)—
  • (a) may be given subject to reasonable conditions; and
  • (b) must not be unreasonably withheld.

Costs

190
  • (1) The undertaker must repay to Hornsea 1 all reasonable fees, costs, charges and expenses properly and reasonably incurred by them in relation to these protective provisions, in respect of—
  • (a) the consideration and approval of the works under paragraph 189; and
  • (b) the attendance of a representative of Hornsea 1 during the undertaking of any works in the protected area.
  • (2) Hornsea 1 must provide the undertaker with such estimates of and evidence in relation to any fees, costs, charges or expenses to which sub-paragraph (1) does or may apply as the undertaker may reasonably request.
  • (3) The undertaker will indemnify and keep Hornsea 1 indemnified against all reasonable costs, charges, damages, expenses, loss, demands, proceedings, claims or penalty which may be reasonably incurred by Hornsea 1—
  • (a) by reason of the works or the failure of them; and/or
  • (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon the works.
  • (4) Hornsea 1 must give the undertaker reasonable notice of any claim or demand under sub-paragraph (3) and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertaker.

Access

191

If in consequence of the powers granted under this Order the access to any Hornsea 1 apparatus is materially obstructed the undertaker must provide such alternative means of access to such apparatus as will enable Hornsea 1 to maintain or use the apparatus no less effectively than was possible before such obstruction.

Expert determination

192
  • (1) Except as provided in sub-paragraph (7), article 42 (arbitration) does not apply to this Part of this Schedule.
  • (2) Any difference under this Part of this Schedule must be referred to and settled by a single independent and suitable person who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.
  • (3) All parties involved in settling any difference must use best endeavours to do so within 21 days from the date of a dispute first being notified in writing by one party to the other and in the absence of the difference being settled within that period the expert must be appointed within 28 days of the notification of the dispute.
  • (4) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.
  • (5) The expert must—
  • (a) invite the parties to make submission to the expert in writing and copied to the other party to be received by the expert within 21 days of the expert's appointment;
  • (b) permit a party to comment on the submissions made by the other party within 21 days of receipt of the submission;
  • (c) issue a decision within 42 days of receipt of the submissions under sub-paragraph (b); and
  • (d) give reasons for the decision.
  • (6) The expert must consider where relevant—
  • (a) the development outcome sought by the undertaker;
  • (b) the ability of the undertaker to achieve its outcome in a timely and cost-effective manner;
  • (c) the nature of the power sought to be exercised by the undertaker;
  • (d) the nature of any operation or development undertaken or proposed to be undertaken by any party other than the undertaker;
  • (e) the ability of any party other than the undertaker to undertake a relevant operation or development in a timely and cost-effective manner, while giving consideration to any restriction or limitation which might be caused to the ability of any party to carry out their statutory or regulatory duties, requirements or obligations;
  • (f) the effects of the undertaker's proposals on any party other than the undertaker and the effects of any operation or development undertaken by any party other than the undertaker;
  • (g) whether this Order provides any alternative powers by which the undertaker could reasonably achieve the development outcome sought in a manner that would reduce or eliminate adverse effects on any party other than the undertaker;
  • (h) the effectiveness, cost and reasonableness of proposals for mitigation arising from any party;
  • (i) the constructability notes; and
  • (j) any other important and relevant consideration.
  • (7) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 42 (arbitration).

PART 15 — FOR THE PROTECTION OF HORNSEA 2 COMPANIES

Application

193

For the protection of Hornsea 2 referred to in this Part of this Schedule the following provisions shall, unless otherwise agreed in writing between the undertaker and Hornsea 2, have effect.

Interpretation

194

In this Part of this Schedule—

  • Hornsea 2” means Optimus Wind Limited (registered number 07883284), Breesea Limited (registered number 07883217), Sonningmay Wind Limited (registered number 10722635) and Soundmark Wind Limited (registered number 10721881) and in substitution therefor their successors to Hornsea 2's interests and/or the Hornsea 2 apparatus;
  • Hornsea 2 apparatus” means any conduit cables ducts pipes or other apparatus or equipment belonging to or maintained by Hornsea 2 for the purposes of the transmission of electricity and includes any structure in which such apparatus is lodged and where such apparatus is or is to be maintained within plots 59, 60, 61, 62, 63, 64, 68, 69, 70, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 90, 91, and 92;
  • Hornsea 2's interests” means any interest or right held by Hornsea 2 or which Hornsea 2 has the right or power to obtain within plots 59, 60, 61, 62, 63, 64, 68, 69, 70, 72, 73, 74, 75, 76, 77, 78, 79, 80, 81, 82, 83, 90, 91, and 92;
  • “in” in a context referring to rights, interests or apparatus in land includes a reference to under, over, across, along or upon such land;
  • “plan” or “plans” include all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe and assess the works to be executed;
  • protected area” means the area within 20 metres in all directions of each point from the Hornsea 2 apparatus or Hornsea 2 interests; and
  • works” means any future works undertaken by or on behalf of the undertaker to install, maintain, alter, inspect, repair, renew, decommission or remove in whole or in part land or apparatus in the protected area.

Acquisition of land

195

Regardless of any provision in this Order or anything shown on the land plans or contained in the book of reference to the Order, the undertaker may not appropriate or acquire or take temporary possession of any land interest or appropriate, acquire, extinguish, interfere with or override any easement, other interest or right and/or cables of Hornsea 2 other than by agreement, such agreement not to be unreasonably withheld.

Protection of Hornsea 2 from works

196
  • (1) Before any works are commenced the undertaker must submit to Hornsea 2 plans and sections of the proposed works and such further particulars as Hornsea 2 may, within 14 days from the day on which plans and sections are submitted under this paragraph, reasonably require.
  • (2) The undertaker must not commence any works to which sub-paragraph (1) applies until Hornsea 2 has given written approval of the plan so submitted.
  • (3) Any approval of Hornsea 2 required under sub-paragraph (2)—
  • (a) may be given subject to reasonable conditions; and,
  • (b) must not be unreasonably withheld.

Costs

197
  • (1) The undertaker must repay to Hornsea 2 all reasonable fees, costs, charges and expenses properly and reasonably incurred by them in relation to these protective provisions, in respect of—
  • (a) the consideration and approval of the works under paragraph 196; and
  • (b) the attendance of a representative of Hornsea 2 during the undertaking of any works in the protected area.
  • (2) Hornsea 2 must provide the undertaker with such estimates of and evidence in relation to any fees, costs, charges or expenses to which sub-paragraph (1) does or may apply as the undertaker may reasonably request.
  • (3) The undertaker will indemnify and keep Hornsea 2 indemnified against all reasonable costs, charges, damages, expenses, loss, demands, proceedings, claims or penalty which may be reasonably incurred by Hornsea 2—
  • (a) by reason of the works or the failure of them; and/or
  • (b) by reason of any act or omission of the undertaker or of any person in its employ or of its contractors or others whilst engaged upon the works.
  • (4) Hornsea 2 must give the undertaker reasonable notice of any claim or demand under sub-paragraph (3) and no settlement or compromise of such a claim or demand is to be made without the prior consent of the undertaker.

Access

198

If in consequence of the powers granted under this Order the access to any Hornsea 2 apparatus is materially obstructed the undertaker must provide such alternative means of access to such apparatus as will enable Hornsea 2 to maintain or use the apparatus no less effectively than was possible before such obstruction.

Expert determination

199
  • (1) Except as provided in sub-paragraph (7), article 42 (arbitration) does not apply to this Part of this Schedule.
  • (2) Any difference under this Part of this Schedule must be referred to and settled by a single independent and suitable person who holds appropriate professional qualifications and is a member of a professional body relevant to the matter in dispute acting as an expert, such person to be agreed by the differing parties or, in the absence of agreement, identified by the President of the Institution of Civil Engineers.
  • (3) All parties involved in settling any difference must use best endeavours to do so within 21 days from the date of a dispute first being notified in writing by one party to the other and in the absence of the difference being settled within that period the expert must be appointed within 28 days of the notification of the dispute.
  • (4) The fees of the expert are payable by the parties in such proportions as the expert may determine or, in the absence of such determination, equally.
  • (5) The expert must—
  • (a) invite the parties to make submission to the expert in writing and copied to the other party to be received by the expert within 21 days of the expert's appointment;
  • (b) permit a party to comment on the submissions made by the other party within 21 days of receipt of the submission;
  • (c) issue a decision within 42 days of receipt of the submissions under sub-paragraph (b); and
  • (d) give reasons for the decision.
  • (6) The expert must consider where relevant—
  • (a) the development outcome sought by the undertaker;
  • (b) the ability of the undertaker to achieve its outcome in a timely and cost-effective manner;
  • (c) the nature of the power sought to be exercised by the undertaker;
  • (d) the nature of any operation or development undertaken or proposed to be undertaken by any party other than the undertaker;
  • (e) the ability of any party other than the undertaker to undertake a relevant operation or development in a timely and cost-effective manner, while giving consideration to any restriction or limitation which might be caused to the ability of any party to carry out their statutory or regulatory duties, requirements or obligations;
  • (f) the effects of the undertaker's proposals on any party other than the undertaker and the effects of any operation or development undertaken by any party other than the undertaker;
  • (g) whether this Order provides any alternative powers by which the undertaker could reasonably achieve the development outcome sought in a manner that would reduce or eliminate adverse effects on any party other than the undertaker;
  • (h) the effectiveness, cost and reasonableness of proposals for mitigation arising from any party;
  • (i) the constructability notes; and
  • (j) any other important and relevant consideration.
  • (7) Any determination by the expert is final and binding, except in the case of manifest error in which case the difference that has been subject to expert determination may be referred to and settled by arbitration under article 42 (arbitration).

SCHEDULE 10 — PROCEDURE FOR DISCHARGE OF REQUIREMENTS

1

In this Schedule—

  • business day” means a day other than a Saturday or Sunday which is not Christmas Day, Good Friday or a bank holiday under section 1 (bank holidays) of the Banking and Financial Dealings Act 1971 ;
  • requirement consultee” means any body named in a requirement as a body to be consulted by the relevant planning authority in discharging that requirement; and
  • start date” means the date of the notification given by the Secretary of State under paragraph 5(2)(b).

Applications made under requirement

2
  • (1) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement the relevant planning authority must give notice to the undertaker of its decision on the application within a period of eight weeks beginning with the later of—
  • (a) the day immediately following that on which the application is received by the authority; or
  • (b) the day immediately following that on which further information has been supplied by the undertaker under paragraph 3,

or such longer period as may be agreed in writing by the undertaker and the relevant planning authority.

  • (2) Subject to paragraph 5, in the event that the relevant planning authority does not determine an application within the period set out in sub-paragraph (1), the relevant planning authority is to be taken to have granted all parts of the application (without any condition or qualification) at the end of that period.
  • (3) Any application made to the relevant planning authority pursuant to sub-paragraph (1) must include a statement to confirm whether it is likely that the subject matter of the application will give rise to any materially new or materially different environmental effects compared to those in the environmental statement and if it will then it must be accompanied by information setting out what those effects are.
  • (4) Where an application has been made to the relevant planning authority for any consent, agreement or approval required by a requirement included in this Order and the relevant planning authority does not determine the application within the period set out in sub-paragraph (1)—
  • (a) and the application is accompanied by a report pursuant to sub-paragraph (3) which states that the subject matter of such application is likely to give rise to any materially new or materially different environmental effects compared to those in the environmental statement; or
  • (b) the relevant planning authority considers that the subject matter of such application will give rise to any materially new or materially different environmental effects compared to those in the environmental statement,

Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.

This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence. legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.