The A12 Chelmsford to A120 Widening Development Consent Order 2024
SCHEDULE 6 — MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS AND IMPOSITION OF RESTRICTIVE COVENANTS
Compensation enactments
1
The enactments for the time being in force with respect to compensation for the compulsory purchase of land apply, with the necessary modifications as respects compensation, in the case of a compulsory acquisition under this Order of a right by the creation of a new right or imposition of a restrictive covenant as they apply in respect of compensation on the compulsory purchase of land and interests in land.
2
- (1) Without limitation on the scope of paragraph 1, the 1961 Act has effect subject to the modification set out in sub-paragraph (2).
- (2) For section 5A(5A) (relevant valuation date) of the 1961 Act substitute—
(5A) If— (a) the acquiring authority enters on land for the purposes of exercising a right in pursuance of a notice of entry under section 11(1) of the 1965 Act (as modified by paragraph 5(5) of Schedule 6 (modification of compensation and compulsory purchase enactments for creation of new rights and imposition of restrictive covenants) to the A12 Chelmsford to A120 Widening Development Consent Order 2024 (“the A12 Chelmsford to A120 Widening Order”)); (b) the acquiring authority is subsequently required by a determination under paragraph 12 of Schedule 2A to the 1965 Act (as substituted by paragraph 5(8) of Schedule 6 to the A12 Chelmsford to A120 Widening Order 2024) to acquire an interest in the land; and (c) the acquiring authority enter on and take possession of that land, the authority is deemed for the purposes of subsection (3)(a) to have entered on that land when it entered on that land for the purpose of exercising that right.
3
- (1) Without limitation on the scope of paragraph 1, the Land Compensation Act 1973[^f00112] has effect subject to the modifications set out in sub-paragraph (2).
- (2) In section 44(1) (compensation for injurious affection), as it applies to compensation for injurious affection under section 7 (measure of compensation in case of severance) of the 1965 Act as substituted by paragraph 5(3)—
- (a) for “land is acquired or taken from” substitute “a right or restrictive covenant over land is purchased from or imposed on”; and
- (b) for “acquired or taken from him” substitute “over which the right is exercisable or the restrictive covenant enforceable”.
Application of Part 1 of the 1965 Act
4
Part 1 (compulsory purchase under Acquisition of Land Act 1946) of the 1965 Act, as applied by section 125 (application of compulsory acquisition provisions) of the 2008 Act (and modified by article 36 (modification of Part 1 of the 1965 Act)) to the acquisition of land under article 27 (compulsory acquisition of land), applies to the compulsory acquisition of a right by the creation of a new right, or to the imposition of a restrictive covenant under article 30(1) (compulsory acquisition of rights and imposition of restrictive covenants)—
- (a) with the modifications specified in paragraph 5; and
- (b) with such other modifications as may be necessary.
5
- (1) The modifications referred to in paragraph 4(a) are as follows.
- (2) References in the 1965 Act to land are, in the appropriate contexts, to be read (according to the requirements of the particular context) as referring to, or as including references to—
- (a) the right acquired or to be acquired, or the restrictive covenant imposed or to be imposed; or
- (b) the land over which the right is or is to be exercisable, or the restriction is or is to be enforceable.
- (3) For Section 7 (measure of compensation in case of severance) of the 1965 Act substitute—
(7) In assessing the compensation to be paid by the acquiring authority under this Act, regard must be had not only to the extent (if any) to which the value of the land over which the right is to be acquired or the restrictive covenant is to be imposed is depreciated by the acquisition of the right or the imposition of the restrictive covenant but also to the damage (if any) to be sustained by the owner of the land by reason of its severance from other land of the owner, or injuriously affecting that other land by the exercise of the powers conferred by this or the Special Act.
- (4) The following provisions of the 1965 Act which state the effect of a deed poll executed in various circumstances where there is no conveyance by persons with interests in the land), that is to say—
- (a) section 9(4) (failure by owners to convey);
- (b) paragraph 10(3) of Schedule 1 (owners under incapacity);
- (c) paragraph 2(3) of Schedule 2 (absent and untraced owners); and
- (d) paragraphs 2(3) and 7(2) of Schedule 4 (common land),
are modified so as to secure that, as against persons with interests in the land which are expressed to be overridden by the deed, the right which is to be compulsorily acquired or the restrictive covenant which is to be imposed is vested absolutely in the acquiring authority.
- (5) Section 11[^f00113] (powers of entry) of the 1965 Act is modified so as to secure that, where the acquiring authority has served notice to treat in respect of any right or restrictive covenant, as well as the notice of entry required by subsection (1) of that section (as it applies to a compulsory acquisition under article 27 (compulsory acquisition of land)), it has power, exercisable in equivalent circumstances and subject to equivalent conditions, to enter for the purpose of exercising that right or enforcing that restrictive covenant; and sections 11A[^f00114] (powers of entry: further notices of entry), 11B[^f00115] (counter-notice requiring possession to be taken on specified date), 12[^f00116] (unauthorised entry) and 13[^f00117] (refusal to give possession to acquiring authority) of the 1965 Act are modified correspondingly.
- (6) Section 20[^f00118] (tenants at will, etc.) of the 1965 Act applies with the modifications necessary to secure that persons with such interests in land as are mentioned in that section are compensated in a manner corresponding to that in which they would be compensated on a compulsory acquisition under this Order of that land, but taking into account only the extent (if any) of such interference with such an interest as is actually caused, or likely to be caused, by the exercise of the right or the enforcement of the restrictive covenant in question.
- (7) Section 22 (interests omitted from purchase) of the 1965 Act as modified by article 36(4) (modification of Part 1 of the 1965 Act) is also modified so as to enable the acquiring authority in circumstances corresponding to those referred to in that section, to continue to be entitled to exercise the right acquired, subject to compliance with that section as respects compensation.
- (8) For Schedule 2A of the 1965 Act substitute—
SCHEDULE 2A (1) (1) This Schedule applies where an undertaker serves a notice to treat in respect of a right over, or a restrictive covenant affecting, the whole or part of a house, building or factory and has not executed a general vesting declaration under section 4 of the Compulsory Purchase (Vesting Declarations) Act 1981 as applied by article 37(5) (application of the 1981 Act) of the A12 Chelmsford to A120 Widening Development Consent Order 2024 in respect of the land to which the notice to treat relates. (2) But see article 38(3) (acquisition of subsoil or airspace only) of the A12 Chelmsford to A120 Widening Development Consent Order 2024 which excludes the acquisition of subsoil or airspace only from this Schedule. (2) In this Schedule, “house” includes any park or garden belonging to a house. (3) A person who is able to sell the house, building or factory (“the owner”) may serve a counter-notice requiring the acquiring authority to purchase the owner’s interest in the house, building or factory. (4) A counter-notice under paragraph 3 must be served within the period of 28 days beginning with the day on which the notice to treat was served. (5) On receiving a counter-notice, the acquiring authority must decide whether to— (a) withdraw the notice to treat, (b) accept the counter-notice, or (c) refer the counter-notice to the Upper Tribunal. (6) The acquiring authority must serve notice of their decision on the owner within the period of 3 months beginning with the day on which the counter-notice is served (“the decision period”). (7) If the acquiring authority decides to refer the counter-notice to the Upper Tribunal it must do so within the decision period. (8) If the acquiring authority does not serve notice of a decision within the decision period it is to be treated as if it had served notice of a decision to withdraw the notice to treat at the end of that period. (9) If the acquiring authority serves notice of a decision to accept the counter-notice, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in the house, building or factory. (10) On a referral under paragraph 7, the Upper Tribunal must determine whether the acquisition of the right or the imposition of the restrictive covenant would— (a) in the case of a house, building or factory, cause material detriment to the house, building or factory, or (b) in the case of a park or garden, seriously affect the amenity or convenience of the house to which the park or garden belongs. (11) In making the determination, the Upper Tribunal must take into account— (a) the effect of the acquisition of the right or the imposition of the covenant, (b) the use to be made of the right or covenant proposed to be acquired or imposed, and (c) if the right or covenant is proposed to be acquired or imposed for works or other purposes extending to other land, the effect of the whole of the works and the use of the other land. (12) If the Upper Tribunal determines that the acquisition of the right or the imposition of the covenant would have either of the consequences described in paragraph 10, it must determine how much of the house, building or factory the acquiring authority ought to be required to take. (13) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the compulsory purchase order and the notice to treat are to have effect as if they included the owner’s interest in that land. (14) (1) If the Upper Tribunal determines that the acquiring authority ought to be required to take some or all of the house, building or factory, the acquiring authority may at any time within the period of 6 weeks beginning with the day on which the Upper Tribunal makes its determination withdraw the notice to treat in relation to that land. (2) If the acquiring authority withdraws the notice to treat under this paragraph it must pay the person on whom the notice was served compensation for any loss or expense caused by the giving and withdrawing of the notice. (15) Any dispute as to the compensation is to be determined by the Upper Tribunal.
SCHEDULE 7 — LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN
| (1)Plot reference number shown on land plans | (2)Purpose for which temporary possession may be taken | (3)Relevant part of the authorised development |
|---|---|---|
| 1/5a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(i)All works |
| 1/10f | Access for utility diversion works. | Work No. U2 |
| 1/10g | Access for utility diversion works. | Work No. U2 |
| 1/11e | Temporary haul road.Access and working area for construction of temporary soil storage bunds. Soil storage area during construction works.Access and working area for repositioning private irrigation pipe. | Work No. U1AWork No. T1All works inrespect of bunds, storage and haul road |
| 1/12c | Access and working area for utility diversion works. | Work No. U2 |
| 1/13f | Access and working area for utility diversion works. | Work No. U2AWork No. 1(a) |
| 1/16a | Access and working area for utility diversion works. | Work No. U2 |
| 2/1d | Improvements to existing highway and installation of signage and associated works. | All works |
| 2/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary traffic management. | All works |
| 2/2i | Access and working area for utility diversion works. | Work No. U21Work No. U22 |
| 2/2j | Access and working area for utility diversion works. | Work No. U21Work No. U22 |
| 2/7b | Access and working area for utility diversion works. | Work No. U21Work No. U22 |
| 2/10a | Access and working area for utility diversion works. | Work No. U21Work No. U22 |
| 2/12i | Compound and traffic management and recovery yard. | Work No. T6All works |
| 2/12m | Temporary storage, laydown areas, access and working space to facilitate the construction of Paynes Lane Bridge.Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 5All works |
| 2/15b | Temporary haul road.Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5Work No. 5 |
| 2/15f | Temporary haul road.Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5Work No. 5 |
| 2/15g | Temporary haul road.Temporary storage, laydown areas, access and working space to facilitate the construction of Work No. 5. | Work No. T5Work No. 5 |
| 2/17b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c)Work No. 5All works |
| 2/17h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 1(c)Work No. 5All works |
| 2/17k | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 1(c)All works |
| 2/17n | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 1(c) |
| 2/17o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(c)All works |
| 2/18a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 1(c)Work No. 2(b)All works |
| 2/18c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 1(a)Work No. 1(c)All works |
| 3/1a | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/1b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/1c | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3a | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3d | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3e | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/3f | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/4a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/5a | Improvements to existing highway and installation of signage and associated works.Access and working area for utility diversion works. | Work No. U21Work No. U22All works |
| 3/5b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 3/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Improvements to existing highway and installation of signage and associated works. | All works |
| 4/1a | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 4/1b | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 4/1c | Improvements to existing highway and installation of signage and associated works. | Work No. 12 |
| 4/1d | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | Work No. 12 |
| 4/2a | Access and working area for utility diversion works. | Work No. U22 |
| 4/2b | Access and working area for utility diversion works. | Work No. U22 |
| 4/3a | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | Work No. 12 |
| 4/3b | Access and working area for utility diversion works. | Work No. U22 |
| 4/3c | Temporary traffic management.Improvements to existing highway and installation of signage and associated works. | All works |
| 4/4a | Access and working area.Improvements to existing highway and installation of signage and associated works. | Work No. 9Work No. 10Work No. 12Work No. 18(b) |
| 4/5a | Improvements to existing highway and installation of signage and associated works.Access and working area for utility diversion works. | Work No. U21Work No. U22Work No. 12 |
| 4/5b | Ecology Mitigation.Access and working area.Improvements to existing highway and installation of signage and associated works. | Work No. 9Work No. 10Work No. 12Work No. 18(b) |
| 4/9b | Access and working area.Ecology Mitigation. | Work No. 9Work No. 10Work No. 18(b) |
| 5/2b | Access and working area for utility diversion works. | Work No. U22Work No. U22AWork No. U35 |
| 5/2c | Access and working area for utility diversion works. | Work No. U22Work No. U22AWork No. U35 |
| 5/2f | Access and working area for utility diversion works. | Work No. U22Work No. U27Work No. U28Work No. U35Work No. U36 |
| 5/2h | Access and working area for utility diversion works. | Work No. U22Work No. U27Work No. U28Work No. U35Work No. U36 |
| 5/2j | To maintain access to properties (Moorings) during demolition and construction of Bury Lane bridge structure.Access and working area for utility diversion works. | Work No. 9Work No. U27Work No. U28Work No. U29Work No. U36 |
| 5/2k | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2l | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2m | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2n | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2o | Access and working area for utility diversion works. | Work No. U22Work No. U30Work No. U31Work No. U33Work No. U35 |
| 5/2r | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2s | Access and working area for utility diversion works. | Work No. U22Work No. U35 |
| 5/2t | Access and working area for utility diversion works. | Work No. U22Work No. U35Work No. U37 |
| 5/6a | Access and working area for utility diversion works.Temporary access to property. | Work No. 9Work No. 10Work No. U22Work No. U22AWork No. U23Work No. U24Work No. U26Work No. U27Work No. U28Work No. U29Work No. U35Work No. U36Work No. T10Work No. T12 |
| 5/6c | Access and working area for utility diversion works. | Work No. U22Work No. U30Work No. U31Work No. U33Work No. U35Work No. T9 |
| 5/6d | Access to temporary car park.Access for bus shuttle service.To maintain access to properties adjoining Station Road.Access and working area for utility diversion works. | Work No. 10Work No. T9 |
| 5/6e | Installation of traffic signs.Access and working area. | Work No. 18(a) |
| 5/12f | Access to temporary car park.Access for bus shuttle service. | Work No. 9Work No. 10 |
| 5/12g | Access to properties adjoining Station Road.Access to temporary car park.Access for bus shuttle service. | Work No. T13Work No. 9Work No. 10 |
| 5/12i | Laydown areas, storage, access and working space. | Work No. 8(b)Work No. 9 |
| 5/16a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access.Access and working area for utility diversion works. | Work No. U23Work No. U25Work No. 12(a)All Works |
| 5/20a | Temporary road.Access and diversion route for properties to the north of the A12 in Hatfield Peverel. | Work No. T8Work No. 9Work No. 10 |
| 5/21a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access.Temporary access to adjoining land.Working area for the construction of retaining structure works. | Work No. 9All Works |
| 5/25a | Temporary access to adjoining land. | Work No. T10Work No. 9 |
| 5/27a | Access and working area to construct temporary footbridge.Temporary path.Access and working area for utility diversion works. | Work No. T9Work No. 10Work No. U30Work No. U31Work No. U33 |
| 5/27b | Access and working area to construct temporary footbridge.Temporary path.Access and working area for utility diversion works. | Work No. T11Work No. 10 |
| 5/28a | Access and working area to construct temporary footbridge.Temporary path.Access and working area for utility diversion works. | Work No. U22AWork No. U30Work No. U31Work No. U33Work No. T9Work No. T11 |
| 5/29a | Access and working area to construct temporary footbridge.Temporary path.Access and working area for utility diversion works. | Work No. U22Work No. U22AWork No. U30Work No. U31Work No. U33Work No. T9 |
| 5/30a | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 |
| 5/34a | Temporary access to adjoining land.Access and working area for construction of retaining structures on adjoining land. | Work No. T12Work No. 10 |
| 5/35a | Temporary car park.Access to temporary car park.Access for bus shuttle service. | Work No. T13Work No. 9Work No. 10Work No. 18 |
| 5/35d | Temporary car park. | Work No. T13Work No. 9Work No. 10Work No. 18 |
| 5/36b | Temporary access.Access and working area for construction of temporary soil storage bunds and soil storage area.Temporary construction area for off-line construction of Hatfield Peverel bridge superstructures. | Work No. T7Work No. 9Work No. 10Work No. 18(b)All works inrespect of bunds |
| 5/38a | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access. | Work No. 10Work No. 12(a)All works |
| 5/38b | Access and working area for construction of retaining structures on adjoining land. | Work No. 10 |
| 6/11a | Temporary car park.Temporary roads.Temporary path and footway diversion routes.Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T13Work No. T14Work No. 18All works |
| 6/12a | Temporary roads.Temporary path and footway diversion routes.Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Construction of temporary soil storage bunds and soil storage area during construction works.Access and working area for repositioning private irrigation pipe. | Work No. U41AWork No. T13Work No. T14Work No. T16All works. |
| 6/12e | Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing.Maintenance of access to adjoining land. | Work No. T17Work No. 17All works |
| 6/12f | Temporary roads.Temporary path and footway diversion routes.Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14Work No. T18All works |
| 6/12h | Temporary roads.Temporary path and footway diversion routes.Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T14Work No. T16All works |
| 6/15a | Temporary roads.Temporary path and footway diversion routes. | Work No. T14All works |
| 6/15d | Temporary roads.Temporary path and footway diversion routes. | Work No. T14All works |
| 6/18b | Temporary roads.Construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T15Work No. 23(a) |
| 6/18d | Access and working area for construction of drainage infrastructure.Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 23(a)Work No. 23(b) |
| 6/18f | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, temporary pond, storage of plant and construction access. | Work No. 12(b)Work No. 18(a)All works |
| 6/20c | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Haul road and construction access.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20All works |
| 7/4b | Access and working area. | Work No. 25Work No. 29(a)Work No. 29(b) |
| 7/4c | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 7/8a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 7/8b | Access and working area for utility diversion works. | Work No. U44Work No. U54Work No. U56 |
| 7/8c | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 7/10b | Haul road and construction access.Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T20Work No. T21All works |
| 7/10g | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities, storage of plant and construction access.Haul road and construction access. | Work No. T23All works |
| 7/10h | Access and working area for works on adjoining land. | Work No. 25Work No. 29(a)Work No. 29(b) |
| 7/10l | Haul road and construction access. | Work No. T23All works |
| 7/12a | Access and working area for utility diversion works. | Work No. U44Work No. U54Work No. U56 |
| 7/13a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of drainage infrastructure.Access and working area for the construction of a retaining structure. | Work No. 12(c)All works |
| 7/16a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Access and working area for the construction of a retaining structure. | Work No. U54Work No. U56Work No. 12(c)All works |
| 7/16b | Temporary traffic management and recovery area. | Work No. T22All works |
| 7/16c | Temporary traffic management and recovery area. | Work No. T22All works |
| 7/16g | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Access and working area for construction of drainage infrastructure. | Work No. U54Work No. U56Work No. 12(c)All works |
| 7/17a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Access and working area for construction of drainage infrastructure. | Work No. U54Work No. U56Work No. 12(c)All works |
| 7/17b | Temporary traffic management and recovery area. | Work No. T22All works |
| 7/17c | Access and working area for utility diversion works. | Work No. U44Work No. U56Work No. 27 |
| 7/18a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 7/19b | Temporary traffic management and recovery area. | Work No. T22All works |
| 7/19c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 12(c)All works |
| 7/19d | Temporary haul road.Access for construction of northern abutment, northern ramps and approach for Gershwin Boulevard Bridge. | Work No. T24Work No. 27 |
| 7/21a | Ecology Mitigation. | All works |
| 7/21d | Temporary haul road. | Work No. T23All works |
| 8/1l | Access and working area for construction of drainage infrastructure.Access and working area for construction of a retaining structure. | Work No. 12(c) |
| 8/1o | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary haul road. | Work No. T23Work No. 12(c)All works |
| 8/2a | Access, storage and working area for the construction of a retaining structure.Access and working area for utility diversion works. | Work No. U60Work No. U61Work No. U62Work No. 24 |
| 8/2d | Access, storage and working area for the construction of a retaining structure.Access and working area for utility diversion works.Temporary haul road. | Work No. U22AWork No. U49Work No. U51Work No. U60Work No. U62Work No. U64Work No. U71Work No. T23All works |
| 8/7a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/8a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/9a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/9b | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/10a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/10b | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/10c | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/11a | Temporary haul road.Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge.Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24Work No. 27 |
| 8/11c | Temporary haul road.Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge.Temporary storage, laydown areas, access and working space to facilitate the construction of Gershwin Boulevard Bridge. | Work No. T24Work No. 12Work No. 27 |
| 8/11v | Temporary haul road and bridge over the River Brain.Access and working area for construction activities at Brain Bridge structure.Temporary storage, laydown areas, access and working space. | Work No. T25Work No. 24(e)All works |
| 8/11aj | Temporary haul road. | Work No. T24Work No. 27 |
| 8/11am | Access for construction of northern abutment, approaches and northern ramps for Gershwin Boulevard Bridge.Temporary storage, laydown areas, access and working area to facilitate the construction of Gershwin Boulevard Bridge. | Work No. 12(c)Work No. 27 |
| 8/12a | Access and working area for utility diversion works. | Work No. U59 |
| 8/12b | Temporary haul road.Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge. | Work No.27Work No. T24 |
| 8/13a | Access for construction of northern abutment approaches and northern ramps for Gershwin Boulevard Bridge.Temporary haul road. | Work No. 27Work No. T24 |
| 8/13c | Access, storage and working area for the construction of a retaining structure.Access and working area for construction activities at Brain Bridge structure.Temporary haul road including temporary bridge over the River Brain. | Work No. 12(c)Work No. 24(e)Work No. T25 |
| 8/15a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/16a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/19d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary haul road. | Work No. T23Work No. 12(c)All works |
| 8/21a | Access and working area for utility diversion works. | Work No. U60Work No. U61Work No. U62 |
| 8/21c | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/21d | Access, storage and working area for the construction of a retaining structure.Access and working area for utility diversion works.Temporary haul road.Temporary path and footway diversion routes. | Work No. U22AWork No. U49Work No. U51Work No. U60Work No. U62Work No. U64Work No. U71Work No. T23All works |
| 8/21h | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/23c | Temporary haul road.Access, storage and working area for the construction of a retaining structure.Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. T23Work No. 12(c)Work No. 24(c)All works |
| 8/25d | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/28a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 8/29a | Access, storage and working area for the construction of a retaining structure.Access storage and working area for construction activities at Brain Bridge structure.Temporary haul road including a temporary bridge over the River Brain. | Work No. 12(c)Work No. 24(e)Work No. T25All works |
| 8/30a | Temporary haul road including a temporary bridge over the River Brain.Access, storage and working area for the construction of a retaining structure.Access, storage and working area for the reconstruction of Brain Bridge. | Work No. T25Work No. 12(c)Work No. 24(e) |
| 8/30b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) |
| 8/31b | Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) |
| 8/41d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary haul road. | Work No. T23Work No. 12(c)All works |
| 8/42a | Access, storage and working area for the construction of a retaining structure.Temporary storage, laydown areas, access and working space to facilitate the construction of Oliver’s Bridge. | Work No. 12(c)Work No. 24(c) |
| 8/47i | Temporary haul road and bridge over the River Brain.Access and working area for construction activities at Brain Bridge structure.Temporary storage, laydown areas, access and working space.Access, storage and working area for the construction of a retaining structure. | Work No. T25Work No. 24(e)All works |
| 8/68a | Access and working area for construction of drainage infrastructure.Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) |
| 8/68b | Access and working area for construction of drainage infrastructure.Access, storage and working area for the construction of a retaining structure. | Work No. 12(c) |
| 8/68d | Access and working area for construction of drainage infrastructure.Access, storage and working area for the construction of a retaining structure.Access and working area for utility diversion works. | Work No. U60Work No. U61Work No. U62 |
| 9/4a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/5a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/6a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/6b | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/6c | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/7a | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/8b | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/8d | Access and working area for utility diversion works. | Work No. U44Work No. U56 |
| 9/13c | Temporary haul road. | Work No. T26All works |
| 10/5a | Access and working area for utility diversion works. | Work No. U22AWork No. U44Work No. U49Work No. U56Work No. U76Work No. U77 |
| 10/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works. | Work No. U22AWork No. U44Work No. U49Work No. U56Work No. 24(a)Work No. 24(b)Work No. 32(c)All works |
| 10/8e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works. | Work No. U22AWork No. U44Work No. U49Work No. U56Work No. U76Work No. U95Work No. 24(a)Work No. 24(b)All works |
| 10/11b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Temporary path and footway diversion routes. | Work No. U81Work No. U84AAll works |
| 10/12c | Temporary path and footway diversion routes.Access and working area for utility diversion works. | Work No. U85Work No. U85AWork No. 32(c) |
| 10/12d | Temporary path and footway diversion routes.Access and working area for utility diversion works. | Work No. U85Work No. U85BWork No. 32(c) |
| 10/12e | Temporary path and footway diversion routes.Access and working area for utility diversion works. | Work No. U85AWork No. 32(c) |
| 10/20b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T29All works |
| 10/20d | Temporary path and footway diversion routes.Access and working area for construction of drainage infrastructure.Access and working area for the construction of a new roundabout.Access and working area for the construction of Farm access.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a) |
| 10/21a | Access and working area for construction of modifications to existing bell mouth. | Work No. 32(c) |
| 11/2a | Installation of traffic signs.Access and working area for installation of traffic signs. | Work No. 37(a) |
| 11/4a | Ecology Mitigation.Temporary path and footway diversion routes.Access and working area for construction of drainage infrastructure.Access and working area for the construction of a new roundabout.Access and working area for the construction of farm access.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 37(a)All works |
| 11/4e | Temporary works associated with borrow pit excavation, maintenance and decommissioning. | Work No. 48All works |
| 11/4l | Access and working area for construction of drainage infrastructure. | Work No. 46(a) |
| 11/5a | Temporary path and footway diversion routes. | Work No. 37(a) |
| 11/5b | Ecology Mitigation. | All works |
| 11/7a | Temporary road. | Work No. T30All works |
| 11/12a | Temporary road. | Work No. T30All works |
| 11/24a | Installation of traffic signs. | All works |
| 11/24b | Installation of traffic signs. | All works |
| 12/1j | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) |
| 12/2c | Access and working area for utility diversion works. | Work No. U124AWork No. U128Work No. U128A |
| 12/5b | Temporary haul road.Access and working area for construction of drainage infrastructure.Access and working area for construction of local access road into Kelvedon.Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T34All works |
| 12/6b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111AWork No. U111BWork No. 52All works |
| 12/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works.Access and working are for the construction of an upgraded access into Essex County Fire & Rescue Centre. | Work No. U111AWork No. U111BWork No. 52All works |
| 12/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 52All works |
| 12/13a | Access and working area for construction of drainage infrastructure. | Work No. 45(a) |
| 12/14a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of drainage infrastructure. | Work No. 45(a)All works |
| 12/19b | Access and working area for construction of drainage infrastructure.Access and working area for construction of local access road.Temporary storage, laydown areas, access and working space to facilitate the construction of Sniveller’s Lane Bridge.Access and working area for utility diversion works.Temporary works ... associated with the excavation of a borrow pit including, access routes, temporary diversion of private rights of way, water management, soil storage and material processing.Temporary haul road. | Work No. U123Work No. U124Work No. T32Work No. T34All works |
| 12/19c | Access and working area for utility diversion works. | Work No. U124AWork No. U128Work No. U128A |
| 12/28a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) |
| 13/1f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 45(a) |
| 13/1h | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 54(b)Work No. 55(a)All works |
| 13/5b | Temporary haul road.Access and working area for the construction of the realigned Highfield Lane. | Work No. T37All works |
| 13/8b | Access and working area for utility diversion works. | Work No. U124AWork No. U128A |
| 13/8c | Access and working area for the construction of the realigned Highfield Lane.Access and working area for utility diversion works.Temporary haul road. | Work No. U134Work No. U139Work No. T37All works |
| 13/11c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary haul road.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T38All works |
| 13/13b | Temporary haul road.Access and working area for the construction of the realigned Highfield Lane. | Work No. T37 |
| 13/14l | Temporary path and footway diversion routes.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 60AWork No. 61(d)Work No. 62(a)All works |
| 14/3b | Temporary haul road.Access and working area for construction of a maintenance access track to drainage infrastructure.Access and working area for utility diversion works. | Work No. U142Work No. T43All works |
| 14/3d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Temporary haul road.Temporary path and footway diversion routes. | Work No. T39Work No. 59All works |
| 14/3f | Temporary haul road.Access and working area for construction of drainage infrastructure.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. T39All works |
| 14/3l | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Access and working area for construction of a maintenance access track to drainage infrastructure. | Work No. 69(a)Work No. 69(b)All works |
| 14/5a | Access and working area for maintenance of existing watercourse. | Work No. 67(b)Work No. 68(a) |
| 14/5c | Access and working area for construction of access track. | Work No. 79(c) |
| 14/5e | Access and working area for construction of drainage infrastructure.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a)Work No. 66(b) |
| 14/5f | Access and working area for construction of drainage infrastructure.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a)Work No. 66(b) |
| 14/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for maintenance of existing watercourse. | Work No. 67(b)Work No. 68(a)All works |
| 14/8a | Access and working area for maintenance of existing watercourse. | Work No. 67(b)Work No. 68(a) |
| 14/9a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access, storage and working area for the construction of a retaining structure.Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a)Work No. 45(b)All works |
| 14/12a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of access track. | Work No. 79(c)All works |
| 14/24a | Access, storage and working area for the construction of a retaining structure.Temporary storage, laydown areas, access and working space to facilitate the construction of Park Bridge. | Work No. 45(a)Work No. 45(f)Work No. 65(b) |
| 15/4a | Installation of traffic signs.Access and working area for utility diversion works. | Work No. 74(c)Work No. U124AWork No. U128A |
| 15/4b | Installation of traffic signs.Access and working area for the construction works at traffic sign locations. | Work No. 82(a) |
| 15/7a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of access track. | Work No. 79(c)All works |
| 15/8a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of access track. | Work No. 79(c)All works |
| 15/8c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Access and working area for construction of access track. | Work No. 79(c) |
| 15/8e | Access and working area for construction of drainage infrastructure.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 66(a)Work No. 66(b) |
| 16/5c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) |
| 16/5d | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access to properties. | Work No. 68(a)All works |
| 16/5f | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a)Work No. 88(b)All works |
| 16/5g | Temporary road.Compound and traffic management and recovery yard.Access and working area for repositioning private irrigation pipe.Access and working area for utility diversion works. | Work No. U167BWork No. U167CWork No. T48Work No. T49All works |
| 16/5h | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a)Work No. 88(a)Work No. 88(c)Work No. 99(b)All works |
| 16/5k | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a)Work No. 88(a)Work No. 88(c)Work No. 99(b)All works |
| 17/3a | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a) |
| 17/3b | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Temporary storage, laydown areas, access and working space to facilitate construction of Easthorpe Road Bridge. | Work No. 68(a)Work No. 88(c)Work No. 99(a)Work No. 99(b)All works |
| 18/1l | Access and working area for utility diversion works. | Work No. U185Work No. U186Work No. U187Work No. U191Work No. U192 |
| 18/2a | Access and working area for utility diversion works. | Work No. U185Work No. U186Work No. U187Work No. U191Work No. U192 |
| 18/3e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104All works |
| 18/6a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of temporary soil storage bunds and soil storage area during construction works.Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 68(a)Work No. 100All works |
| 18/6d | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a)Work No. 68(b)Work No. 101 |
| 18/6e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for construction of drainage infrastructure. | Work No. 101Work No. 102(c)All works |
| 18/6i | Temporary path and footway diversion routes.Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 |
| 18/8a | Temporary storage, laydown areas, access and working space to facilitate the construction of Potts Green Bridge. | Work No. 100 |
| 18/13c | Access and working area for construction of temporary soil storage bunds and soil storage area during construction works. | Work No. 68(a)Work No. 68(b) |
| 18/13e | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 68(b)All works |
| 18/18b | Construction compound including material storage, laydown areas, temporary buildings, welfare facilities storage of plant and construction access. | Work No. T52All works |
| 18/20c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104All works |
| 19/1g | Compound and traffic management and recovery yard. | Work No. T54All works |
| 19/2f | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 104All works |
| 19/6b | Access and working area for utility diversion works. | Work No. U202Work No. U203Work No. U206Work No. U207 |
| 19/6c | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant. | Work No. 112All works |
| 19/17a | Ecology Mitigation.Access to works. | All works |
| 20/2a | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access and working area for utility diversion works. | Work No. U147AWork No. U147BWork No. U147CWork No. 122All works |
| 20/7a | Access and working area for widening B1023 Kelvedon Road.Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 |
| 20/8a | Access and working area for widening B1023 Kelvedon Road.Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 |
| 20/9b | Construction material storage, construction access, laydown areas, welfare facilities, working area and storage of plant.Access / working room for construction of drainage infrastructure. | All Works |
| 20/13a | Access and working area for widening B1023 Kelvedon Road.Access and working area to allow for vegetation clearance to enable the construction of the permanent works. | Work No. 122 |
| 21/1a | Access and working area for utility diversion works. | Work No. U124AWork No. U128A |
SCHEDULE 8 — SPECIAL CATEGORY LAND
PART 1 — SPECIAL CATEGORY LAND FOR WHICH REPLACEMENT LAND IS PROVIDED
| Sheet of Special Category Land Plan | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| 7 | 7/16d, 7/16f, 7/17d, 7/19g, 7/19h |
| 8 | 8/6h, 8/6i,8/11b, 8/11d, 8/11r, 8/11s8/12d, 8/13b, 8/14a, 8/47a, 8/47f, 8/47k, 8/47m, 8/47o, 8/47p |
| 9 | 9/8c, 9/8e, 9/10d, 9/11a |
| 10 | 10/8d |
| 19 | 19/2g, 19/2h, 19/4d, 19/4e, 19/7a, 19/7c19/17b |
PART 2 — SPECIAL CATEGORY (RIGHTS) LAND FOR WHICH REPLACEMENT LAND IS PROVIDED
| Sheet of Special Category Land Plan | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| 8 | 8/6j, 8/6m, 8/27a, 8/47c, 8/47d |
PART 3 — SPECIAL CATEGORY (RIGHTS) LAND FOR WHICH REPLACEMENT LAND IS NOT PROVIDED
| Sheet of Special Category Land Plan | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| 1 | 1/11g, 1/14a |
| 7 | 7/16e |
| 8 | 8/3a, 8/6b, 8/6d, 8/6k8/11f, 8/11g, 8/11u8/11al8/47b, 8/47e, 8/47j, 8/47l, 8/47n |
| 9 | 9/10e, 9/11b |
| 10 | 10/8a |
PART 4 — REPLACEMENT LAND
| Sheet of Special Category Land Plan | Plot reference number shown on Special Category Land Plans and in the book of reference |
|---|---|
| 8 | 8/1d, 8/1n, 8/17b, 8/19b, 8/33f, 8/33g, 8/33i, 8/33m, 8/41b8/43d, 8/43e, 8/44c, 8/45e, 8/45f |
| 9 | 9/1a, 9/1o, 9/1q |
| 10 | 10/1b, 10/1k, 10/1l, 10/1n, 10/1o, 10/1s, 10/2c, 10/2f, 10/3b, 10/3d, 10/4b, 10/20g |
| 18 | 18/1u |
| 19 | 19/18d |
SCHEDULE 9 — HEDGEROWS AND TREES
The hedgerow reference numbers in the tables below are taken from the Hedgerow Survey Report at Appendix 9.7 of Chapter 9: Biodiversity of the Environmental Statement, the Supplementary Hedgerow Survey Report (Application Document Reference No. TR010060/EXAM/9.50, version Rev 1, dated 11/04/2023) and the Supplementary Botanical Survey Report (Application Document Reference No. TR010060/EXAM/9.16, version Rev 2, dated 13/02/2023).
The location of the hedgerows is shown on the Retained and Removed Vegetation Plans, on the Figures at Annex A of the Hedgerow Survey Report (Sheets 1 to 27), on Figure 1 at Appendix A of the Supplementary Hedgerow Survey Report, and on Figure 2 at Appendix A of the Supplementary Botanical Survey Report.
PART 1 — REMOVAL OF IMPORTANT HEDGEROWS
| (1)Reference No. (Location of hedgerow) | (2)Work to be carried out | (3)Relevant part of the authorised development |
|---|---|---|
| Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheet 20 | Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheet 20 | Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheet 20 |
| I2 (East of B1023, north-east of Inworth) | Partial removal | Work No. 117 |
| I3 (East of B1023, north-east of Inworth) | Partial removal | Work No. 122 |
| I4 (East of B1023, north-east of Inworth) | Partial removal | Work Nos. 117 and 122 |
| I6 (East of B1023, north-east of Inworth) | Full removal | Work No. 122 |
| I7 (East of B1023, north of Well Cottage, Inworth) | Partial removal | Work Nos. 117 and 122 |
| I8 (West of B1023, south of All Saints Church) | Full removal | Work Nos. 122 and 114 |
| I10 (West of B1023, north of Windmill Hill) | Partial removal | Work No. 114 |
| I12 (East of B1023 and Marlborough Lodge) | Full removal | Work No. 122 |
| I13 (East of B1023, south-east of Marlborough Lodge) | Partial removal | Work No. 120 |
| I14 (West of B1023, south of Marlborough Lodge) | Partial removal | Work No. 113 |
| I15 (West of B1023, south-west of Marlborough Lodge) | Partial removal | Work No. 113 |
| I16 (West of B1023, south of Marlborough Lodge) | Partial removal | Work No. 113 |
| I17 (East of B1023, south-east of Marlborough Lodge) | Partial removal | Work No. 122 |
| Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 | Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 | Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 |
| 335 (West of Boreham House) | Partial removal | Work Nos. 2(b) and 3(b) |
| Hedgerow Survey Report – Sheets 9, 10, 11, 12 and 13 Retained and Removed Vegetation Plans – Sheet 6 | Hedgerow Survey Report – Sheets 9, 10, 11, 12 and 13 Retained and Removed Vegetation Plans – Sheet 6 | Hedgerow Survey Report – Sheets 9, 10, 11, 12 and 13 Retained and Removed Vegetation Plans – Sheet 6 |
| 8275 (South-east of The Vineyards) | Partial removal | Work No. 18(b) |
| 263 (East of hedgerow 2963) | Partial removal | Work Nos. 12(a), 12(b), 16, 18(b), and 18(e) |
| 9263 (Parallel to hedgerow 8265) | Partial removal | Work Nos. 12(a), 12(b), 14(a), and 18(b) |
| 271 (South of hedgerow 264) | Partial removal | Work Nos. 12(b) and 18(f) |
| 259 (South-west of Kingswood Gateway) | Partial removal | Work Nos. 18(e) and 20 |
| 257 (Along length of A12) | Full removal | Work Nos. 12(a), 12(b), and 18(a) |
| 9275 (east of The Vineyards) | Full removal | Work Nos. T14, T16 |
| Hedgerow Survey Report – Sheet 11, Retained and Removed Vegetation Plans – Sheets 6 and 7 | Hedgerow Survey Report – Sheet 11, Retained and Removed Vegetation Plans – Sheets 6 and 7 | Hedgerow Survey Report – Sheet 11, Retained and Removed Vegetation Plans – Sheets 6 and 7 |
| 247 (North of Latneys) | Full removal | Work No. 12(c) |
| Hedgerow Survey Report – Sheets 12 and 13, Retained and Removed Vegetation Plans – Sheet 7 | Hedgerow Survey Report – Sheets 12 and 13, Retained and Removed Vegetation Plans – Sheet 7 | Hedgerow Survey Report – Sheets 12 and 13, Retained and Removed Vegetation Plans – Sheet 7 |
| 244 (North of Latneys) | Partial removal | Work Nos. 12(c) and 21A |
| 230 (South-west of Dengie Farm) | Partial removal | Work No. 26 |
| 219 (South-east of Dengie Farm) | Partial removal | Work No. 26 |
| 256 (South-west of Kingswood Gateway) | Partial removal | Work Nos. 18(c) and 18(e) |
| 23001 (South-west of Dengie Farm) | Partial removal | Work No. 26 |
| 211 (Along Howbridge Hall Road) | Partial removal | Work Nos. 25 and 29(b) |
| Hedgerow Survey Report – Sheet 16, Retained and Removed Vegetation Plans – Sheet 8 | Hedgerow Survey Report – Sheet 16, Retained and Removed Vegetation Plans – Sheet 8 | Hedgerow Survey Report – Sheet 16, Retained and Removed Vegetation Plans – Sheet 8 |
| 209 (North-west of Benton Hall) | Partial removal | Work Nos. 12(c)..., and 28(b) |
| 206 (North-west of Benton Hall) | Partial removal | Work No. U96 |
| 205 (North of Benton Hall) | Full removal | Work No. U96 |
| Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheets 10 and 11 | Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheets 10 and 11 | Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheets 10 and 11 |
| 200 (Along Gas Governor, north-west of Coleman’s Cottage) | Partial removal | Work Nos. 24(b) and 32(d) |
| 199 (Along hedgerow 200) | Partial removal | Work No. 32(d) |
| 195 (North of Little Braxted Lane) | Partial removal | Work Nos. 24(b) and 32(d) |
| 194 (North of hedgerow 195) | Partial removal | Work Nos. 24(a), 24(b), and 32(d) |
| 192 (North of hedgerow 194) | Partial removal | Work Nos. 24(a), 24(b), and 32(d) |
| 187 (South of Burghey Brook Cottages) | Full removal | Work Nos. 24(a) and 24(b) |
| 186 (South of hedgerow 187) | Partial removal | Work Nos. 24(b) and 32(a) |
| 185 (East of hedgerow 187) | Full removal | Work Nos. 24(a) and 24(b) |
| Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 | Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 | Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 |
| 175 (West of Garden Cottage) | Full removal | Work No. 37(e) |
| 168 (South of Rivenhall Bridge) | Partial removal | Work Nos. 24(g), 42(a), and 42(b) |
| 167 (East of Rivenhall Bridge) | Partial removal | Work No. 24(g) |
| 171 (North-east of hedgerow 166) | Partial removal | Work No. 48 |
| 170 (East of Rivenhall End) | Full removal | Work No. 24(g) |
| 163 (East of hedgerow 164) | Partial removal | Work No. 41(b) |
| Hedgerow Survey Report – Sheet 18, Retained and Removed Vegetation Plans – Sheet 12 | Hedgerow Survey Report – Sheet 18, Retained and Removed Vegetation Plans – Sheet 12 | Hedgerow Survey Report – Sheet 18, Retained and Removed Vegetation Plans – Sheet 12 |
| 158 (Along Sniveller’s Lane) | Partial removal | Work Nos. 24(g), 39(c), and 47 |
| 157 (Along Sniveller’s Lane) | Partial removal | Work Nos. 24(g), 39(c), and 47 |
| 8161 (East of hedgerow 9166) | Full removal | Work Nos. 24(g) and 39(c) |
| 9166 (North of Essex County Fire and Rescue Service Headquarters) | Full removal | Work No. 39(c) |
| 160 (West of Sniveller’s Lane) | Full removal | Work Nos. 24(g) and 39(c) |
| 159 (Along Sniveller’s Lane) | Full removal | Work Nos. 24(g), 39(c), and 53 |
| 156 (East of Sniveller’s Lane) | Partial removal | Work Nos. 39(c) and 47 |
| 9161 (North of hedgerow 8161) | Full removal | Work Nos. 39(c) and 48 |
| Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 |
| 103 (North-east of Ewell Hall) | Partial removal | Work No. 58 |
| 133 (South-west of Bridgefoot House) | Partial removal | Work No. 55(a) |
| 134 (West of Maldon Road) | Partial removal | Work No. 45(a) |
| 135 (East of hedgerow 136) | Partial removal | Work No. 55(c) |
| Hedgerow Survey Report – Sheet 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheet 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheet 20, Retained and Removed Vegetation Plans – Sheet 13 |
| 130 (South-west of Koorbaes Cottages) | Partial removal | Work No. 61(a) |
| Hedgerow Survey Report – Sheets 20 and 21, Retained and Removed Vegetation Plans – Sheet 14 | Hedgerow Survey Report – Sheets 20 and 21, Retained and Removed Vegetation Plans – Sheet 14 | Hedgerow Survey Report – Sheets 20 and 21, Retained and Removed Vegetation Plans – Sheet 14 |
| 86 (Along B1023) | Full removal | Work No. 122 |
| 94 (West of Inworth Hall) | Full removal | Work No. 59 |
| 88 (West of Inworth Hall) | Partial removal | Work Nos. 74(a) and 59 |
| 84 (Along B1023)(Unable to be surveyed) | Partial removal | Work Nos. 74(c) and 122 |
| 83 (Along B1023)(Unable to be surveyed) | Partial removal | Work Nos. 74(c) and 122 |
| 85 (Along B1023) | Partial removal | Work No. 116 |
| 95 (Opposite hedgerow 994) | Partial removal | Work No. 45(b) |
| 78 (South of Domsey Brook) | Partial removal | Work No. 67(b) |
| 994 (West of Inworth Hall) | Partial removal | Work Nos. 45(b), 75 and 76A |
| Hedgerow Survey Report – Sheet 22 and 23, Retained and Removed Vegetation Plans – Sheet 15 | Hedgerow Survey Report – Sheet 22 and 23, Retained and Removed Vegetation Plans – Sheet 15 | Hedgerow Survey Report – Sheet 22 and 23, Retained and Removed Vegetation Plans – Sheet 15 |
| 71 (North-west of Prested Hall) | Partial removal | Work Nos. 68(a) and 78(a) |
| 67 (Along the western side of the driveway to Prested Hall) | Partial removal | Work No. 68(a) |
| 64 (Along the eastern side of the driveway to Prested Hall) | Partial removal | Work No. 68(a) |
| 63 (South of Prested Hall Farm) | Partial removal | Work No. 68(a) |
| 68 (Along the western side of the driveway to Prested Hall) | Partial removal | Work No. 79(a) |
| 66 (Along the eastern side of the driveway to Prested Hall) | Partial removal | Work No. 87(b) |
| 59 (East of Prested Hall Farm) | Partial removal | Work Nos. 68(a) and 91(c) |
| 57 (South-east of Travelodge Colchester Feering) | Partial removal | Work No. 68(a) |
| 70 (Along London Road east of Feering) | Partial removal | Work No. 82(c) |
| 69 (Along New Lane) | Partial removal | Work No. 82(d) |
| Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 | Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 | Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 |
| 51 (Along the southern side of Easthorpe Road, south-east of Little Domsey) | Partial removal | Work Nos. 68(a) and 91(b) |
| 54 (Along the southern side of Easthorpe Road, south-west of Little Domsey) | Partial removal | Work Nos. 68(a), 88(d), and 91(b) |
| 52 (Along the northern side of Easthorpe Road) | Partial removal | Work Nos. 68(a), 88(d), and 91(b) |
| 46 (Along the southern side of Easthorpe Road, north-west of Badcock’s Farm) | Partial removal | Work Nos. 88(c) and 91(b) |
| 48 (Along the northern side of Easthorpe Road, north-west of Badcock’s Farm) | Partial removal | Work Nos. 88(c) and 91(b) |
| Hedgerow Survey Report – Sheets 24 and 25, Retained and Removed Vegetation Plans – Sheet 17 | Hedgerow Survey Report – Sheets 24 and 25, Retained and Removed Vegetation Plans – Sheet 17 | Hedgerow Survey Report – Sheets 24 and 25, Retained and Removed Vegetation Plans – Sheet 17 |
| 45 (South of Domsey Brook, east of the A12) | Partial removal | Work Nos. 68(a) and 99(b) |
| 941 (Along the southern branch of Domsey Brook south of the A12) | Partial removal | Work No. 68(a) |
| 942 (Along Domsey Brook, south of the A12) | Partial removal | Work No. 68(a) |
| 32 (North-east of Easthorpegreen Farm) | Partial removal | Work No. 94(d) |
| 35 (Along southern side of the A12, north-east of Easthorpegreen Farm) | Partial removal | Work No. 94(b) |
| 38 (Along the western side of the access track to Easthorpegreen Farm) | Partial removal | Work No. 68(a) |
| 39 (Along the eastern side of the access track to Easthorpegreen Farm) | Partial removal | Work No. 68(a) |
| 37 (North-east of Easthorpegreen Farm) | Partial removal | Work No. 97 |
| 36 (North-east of Easthorpegreen Farm) | Partial removal | Work Nos. 68(a), 93(a), 93(b), 94(d), and 97 |
| 34 (North-east of Easthorpegreen Farm) | Partial removal | Work Nos. 94(c), 94(d), and 97 |
| 33 (North-east of Easthorpegreen Farm) | Partial removal | Work No. 94(d) |
| 30 (North-east of Easthorpegreen Farm) | Partial removal | Work Nos. 68(a) and 95 |
| 27 (South-west of Wishingwell Farm) | Partial removal | Work No. 96(a) |
| Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 | Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 | Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 |
| 24 (North of Damyon’s Farm) | Partial removal | Work No. 68(a) |
| 9 (North-west of Marks Tey Hall) | Partial removal | Work No. 105(c) |
| 23 (North-east of Damyon’s Farm) | Partial removal | Work Nos. 68(a) and 100 |
| 20 (South of Potts Green) | Partial removal | Work Nos. 68(a) and 100 |
| 16 (East of Shell petrol station) | Partial removal | Work No. 68(a) |
| 26 (West of Damyon’s Farm) | Partial removal | Work Nos. 68(a) and 94(d) |
| Hedgerow Survey Report – Sheet 27, Retained and Removed Vegetation Plans – Sheet 19 | Hedgerow Survey Report – Sheet 27, Retained and Removed Vegetation Plans – Sheet 19 | Hedgerow Survey Report – Sheet 27, Retained and Removed Vegetation Plans – Sheet 19 |
| 5 (North side of London Road, Copford) | Partial Removal | Works Nos. 110(b), U202 and U203 |
PART 2 — REMOVAL OF OTHER HEDGEROWS
| (1)Reference No. (Location of hedgerow) | (2)Work to be carried out | (3)Relevant part of the authorised development |
|---|---|---|
| Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheets 8 and 9 | Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheets 8 and 9 | Supplementary Hedgerow Survey Report – Sheet 1, Retained and Removed Vegetation Plans – Sheets 8 and 9 |
| 001 (east of River Blackwater) | Partial removal | Work No. U69 |
| 002 (east of River Blackwater) | Partial removal | Work No. U69 |
| Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 | Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 | Hedgerow Survey Report – Sheet 2, Retained and Removed Vegetation Plans – Sheet 1 |
| 337 (East of the A12) | Full removal | Work No. 2(b) |
| Hedgerow Survey Report – Sheet 3, Retained and Removed Vegetation Plans – Sheet 2 | Hedgerow Survey Report – Sheet 3, Retained and Removed Vegetation Plans – Sheet 2 | Hedgerow Survey Report – Sheet 3, Retained and Removed Vegetation Plans – Sheet 2 |
| 327 (North-east of Police House) | Partial removal | Work No. 6(b) |
| Hedgerow Survey Report – Sheets 9, 10 and 11, Retained and Removed Vegetation Plans – Sheet 6 | Hedgerow Survey Report – Sheets 9, 10 and 11, Retained and Removed Vegetation Plans – Sheet 6 | Hedgerow Survey Report – Sheets 9, 10 and 11, Retained and Removed Vegetation Plans – Sheet 6 |
| 9265 (North-east of Lawrence Court) | Full removal | Work Nos. 12(a) and 12(b) |
| 8265 (Perpendicular to hedgerow 9265) | Full removal | Work Nos. 12(b), 14(a), and 18(b) |
| 264 (Along length of A12) | Full removal | Work No. 12(a) |
| 9259 (South-west of Kingswood Gateway) | Full removal | Work Nos. 12(b) and 18(c) |
| 270 (South of hedgerow 264) | Full removal | Work Nos. 12(a), 12(b), and 18(a) |
| 9270 (South of hedgerow 9265) | Full removal | Work No. 18(f) |
| 8270 (North of hedgerow 9270) | Full removal | Work No. 18(f) |
| Hedgerow Survey Report – Sheet 13, Retained and Removed Vegetation Plans – Sheet 7 | Hedgerow Survey Report – Sheet 13, Retained and Removed Vegetation Plans – Sheet 7 | Hedgerow Survey Report – Sheet 13, Retained and Removed Vegetation Plans – Sheet 7 |
| 226 (South of Gershwin Boulevard) | Full removal | Work No. 12(c) |
| Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheet 10 | Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheet 10 | Hedgerow Survey Report – Sheet 17, Retained and Removed Vegetation Plans – Sheet 10 |
| 193 (South-east of Rosewood Business Park) | Partial removal | Work Nos. 32(a), 32(b), and 32(c) |
| 188 (North of hedgerow 193) | Full removal | Work No. 32(c) |
| 180 (South of Pond Farm) | Full removal | Work No. T29 |
| Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 | Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 | Hedgerow Survey Report – Sheets 17 and 18, Retained and Removed Vegetation Plans – Sheet 11 |
| 9167 (North-east of Rivenhall Bridge) | Partial removal | Work No. 39(b) |
| 166 (North of hedgerow 9167) | Full removal | Work Nos. 39(a) and 39(b) |
| 164 (West of Essex County Fire and Rescue Service Headquarters) | Full removal | Work Nos. 24(g), 39(a), and 39(c) |
| 176 (South of hedgerow 178) | Full removal | Work Nos. 37(a), 37(b), and 38(b) |
| Hedgerow Survey Report – Sheet 18 and 19, Retained and Removed Vegetation Plans – Sheet 12 | Hedgerow Survey Report – Sheet 18 and 19, Retained and Removed Vegetation Plans – Sheet 12 | Hedgerow Survey Report – Sheet 18 and 19, Retained and Removed Vegetation Plans – Sheet 12 |
| 139 (East of hedgerow 144) | Full removal | Work Nos. 45(a) and 50A |
| 144 (North-east of Crabbs Lane) | Partial removal | Work Nos. 39(c) and 49 |
| Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 | Hedgerow Survey Report – Sheets 19 and 20, Retained and Removed Vegetation Plans – Sheet 13 |
| 129 (South-west of Koorbaes Cottages)(Unable to be surveyed) | Partial removal | Work No. 60A |
| Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 | Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 | Hedgerow Survey Report – Sheet 24, Retained and Removed Vegetation Plans – Sheet 16 |
| 47 (Between the A12 and Easthorpe Road) | Partial removal | Work Nos. 68(a), 89(b), and 99(b) |
| 53 (Along the A12, west and east of Domsey Chase) | Partial removal | Work No. 88(b) |
| Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 | Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 | Hedgerow Survey Report – Sheet 26, Retained and Removed Vegetation Plans – Sheet 18 |
| 11 (Along the southern side of the A12 west of Marks Tey Hall) | Partial removal | Work Nos. 102(b) and 102(c) |
The location of the trees subject to Tree Preservation Orders is shown on the Retained and Removed Vegetation Plans.
PART 3 — TREES SUBJECT TO TREE PRESERVATION ORDERS
| (1)Reference and description from confirmed Tree Preservation Order | (2)Work to be carried out | (3)Relevant part of the authorised development |
|---|---|---|
| Retained and Removed Vegetation Plans – Sheet 1 | Retained and Removed Vegetation Plans – Sheet 1 | Retained and Removed Vegetation Plans – Sheet 1 |
| Trees within Chelmer and Blackwater Navigation Conservation Area including damson, blackthorn and willow | Potential pruning and lopping of branches and roots, and/or felling adjacent to Chelmer and Blackwater Navigation | Work No. 2a |
| Retained and Removed Vegetation Plans – Sheet 2 | Retained and Removed Vegetation Plans – Sheet 2 | Retained and Removed Vegetation Plans – Sheet 2 |
| TPO/2002/080Boreham House Main Road Boreham Chelmsford Essex, CM3 3HYT26 – 1 no. Horse Chestnut | Potential pruning and lopping of branches and roots, and/or felling | Work No. 1d |
| TPO/2014/001Land North West of Milmead Cottages, Paynes Lane Boreham, Chelmsford, Essex, CM3 3HHA1 – Trees of whatever species on land east of The Generals, Main Road, Boreham**Verified location. Species include Lime, Elm, Horse Chestnut, Oak and Ash | Potential pruning and lopping of branches and roots, and/or felling adjacent to Main Road (B1137) | Work No. 1d |
| Retained and Removed Vegetation Plans – Sheet 8 | Retained and Removed Vegetation Plans – Sheet 8 | Retained and Removed Vegetation Plans – Sheet 8 |
| Maldon District Council TPO 07/22 Blue Mills, Blue Mills Hill, Wickham Bishops, CM8 3LH | Felling, pruning and lopping of branches | Work U69 |
SCHEDULE 10 — DISAPPLICATION AND MODIFICATION OF BYELAWS
Byelaws
| (1)Title | (2)Byelaw to be disapplied or modified |
|---|---|
| Byelaws made by Essex County Council under Section 41 of the Countryside Act 1968, with respect to country parks | Byelaw 2 (climbing) is disappliedByelaw 3 (removal of structures) is disappliedByelaw 4 (erection of structures) is disappliedByelaw 5 (walking on grass) is disappliedByelaw 6(1) (protection of wildlife) - the words “take or disturb any animal” are disappliedByelaw 7 (Removal of Substances) is disappliedByelaw 10 (vehicles) is disappliedByelaw 11 (overnight parking) is disappliedByelaw 17 (watercourses) is disappliedByelaw 21 (noise) is disapplied |
| Chelmer and Blackwater Navigation Byelaws 1994 | Byelaw 3 (damage etc) is disappliedByelaw 13 (harassment) is disappliedByelaw 27 (obstruction of officers) is disappliedByelaw 28 (enforcement) is disappliedByelaw 29 (penalty and defence) is disapplied insofar as this byelaw applies to byelaws 3, 13, 27 or 28 |
SCHEDULE 11 — PROTECTIVE PROVISIONS
PART 1 — FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS
1
For the protection of the utility undertakers referred to in this Part of this Schedule the following provisions have effect, unless otherwise agreed in writing between the undertaker and the utility undertaker concerned.
2
In this Part of this Schedule—
- “alternative apparatus” means alternative apparatus adequate to enable the utility undertaker in question to fulfil its statutory functions in a manner no less efficient than previously;
- “apparatus” means—in the case of an electricity undertaker, electric lines or electrical plant (as defined in the Electricity Act 1989) [^f00119], belonging to or maintained by that utility undertaker;in that case of a gas undertaker, any mains, pipes or other apparatus belonging to or maintained by a gas transporter within the meaning of Part 1 of the Gas Act 1986[^f00120] for the purposes of gas supply;in the case of water undertaker, mains, pipes or other apparatus belonging to or maintained by that utility undertaker for the purposes of water supply; andin the case of a sewerage undertaker—any drain or works vested in the utility undertaker under the Water Industry Act 1991[^f00121]; andany sewer which is so vested or is the subject of a notice of intention to adopt given under section 102(4)[^f00122] (adoption of sewers and disposal works) of that Act) or an agreement to adopt made under section 104 (agreement to adopt sewers, drains or sewage disposal works at future date) of that Act[^f00123],and includes a sludge main, disposal main (within the meaning of section 219 (general interpretation) of that Act or sewer outfall and any manholes, ventilating shafts, pumps or other accessories forming part of any such sewer, drain or works,
and includes any structure in which apparatus is or is to be lodged or which gives or will give access to apparatus;
- “functions” includes powers and duties;
- “in” in a context referring to apparatus or alternative apparatus in land includes a reference to apparatus or alternative apparatus under, over or upon land;
- “plan” includes all designs, drawings, specifications, method statements, soil reports, programmes, calculations, risk assessments and other documents that are reasonably necessary properly and sufficiently to describe the works to be executed; and
- “utility undertaker” means—any licence holder within the meaning of Part 1 (electricity supply) of the Electricity Act 1989;a gas transporter within the meaning of Part 1 (gas supply) of the Gas Act 1986;a water undertaker within the meaning of the Water Industry Act 1991; anda sewerage undertaker within the meaning of Part 1 (preliminary) of the Water Industry Act 1991,
for the area of the authorised development, and in relation to any apparatus, means the utility undertaker to whom it belongs or by whom it is maintained.
On street apparatus
3
This Part of this Schedule does not apply to apparatus in respect of which the relations between the undertaker and the utility undertaker are regulated by the provisions of Part 3 (street works in England and Wales) of the 1991 Act.
Reading this document does not replace reading the official text published on legislation.gov.uk. Contains public sector information licensed under the Open Government Licence v3.0. We assume no responsibility for any inaccuracies arising from the conversion of the original CLML XML to this format.
This text is published under legislation.gov.uk's own terms of reuse, not a Legalize or public-domain licence.
legislation.gov.uk
Open Government Licence v3.0 (attribution required)
© Crown and database right. Derived from content available under the Open Government Licence v3.0 from legislation.gov.uk.